Search results for: Niemeyer
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2

Search results for: Niemeyer

2 The Interrelations between Niemeyer’s Works and the Concept of Typology: A Computer Based Analysis of Form and Structure

Authors: Aline M. C. Santoro, João C. Pantoja, Eduardo P. Rossetti

Abstract:

While the aim of the modernist movement was to deny known typology, the creation of a new formal language also gave it new meaning, which was now related to Form. This is specifically true in the modern capital of Brazil, where Niemeyer sought to demonstrate the manner in which the new materials available, such as reinforced concrete, were able to produce innovative forms. With this study, we aim to demonstrate the relationship between Niemeyer’s forms and the topological typology known as tessellation, through the presentation of two case studies, the Monument to Caxias and the Saint George Orthodox Church. At a first glance, our purpose is to present the definition of Form, especially with relationship to the works of Niemeyer, seeking to identify in them the concepts presented by Moussavi. Afterwards, we will use a computer-based approach to study and model the forms of two of his buildings with the McNeel Rhinoceros program, where, with the aid of diagrams and renderings, we will be able to clearly and legibly represent their organic forms and further understand their structural systems. When we recognise the concept of typology as a starting point for structural form, it can be concluded that the case studies presented here are encompassed by the typology presented by Moussavi since they derive from his basic structural systems.

Keywords: form, Niemeyer, structure, typology, topology

Procedia PDF Downloads 163
1 Geotechnical Evaluation and Sizing of the Reinforcement Layer on Soft Soil in the Construction of the North Triage Road Clover, in Brasilia Federal District, Brazil

Authors: Rideci Farias, Haroldo Paranhos, Joyce Silva, Elson Almeida, Hellen Silva, Lucas Silva

Abstract:

The constant growth of the fleet of vehicles in the big cities, makes that the Engineering is dynamic, with respect to the new solutions for traffic flow in general. In the Federal District (DF), Brazil, it is no different. The city of Brasilia, Capital of Brazil, and Cultural Heritage of Humanity by UNESCO, is projected to 500 thousand inhabitants, and today circulates more than 3 million people in the city, and with a fleet of more than one vehicle for every two inhabitants. The growth of the city to the North region, made that the urban planning presented solutions for the fleet in constant growth. In this context, a complex of viaducts, road accesses, creation of new rolling roads and duplication of the Bragueto bridge over Paranoa lake in the northern part of the city was designed, giving access to the BR-020 highway, denominated Clover of North Triage (TTN). In the geopedological context, the region is composed of hydromorphic soils, with the presence of the water level at some times of the year. From the geotechnical point of view, are soils with SPT < 4 and Resistance not drained, Su < 50 kPa. According to urban planning in Brasília, special art works can not rise in the urban landscape, contrasting with the urban characteristics of the architects Lúcio Costa and Oscar Niemeyer. Architects hired to design the new Capital of Brazil. The urban criterion then created the technical impasse, resulting in the technical need to ‘bury’ the works of art and in turn the access greenhouses at different levels, in regions of low support soil and water level Outcrossing, generally inducing the need for this study and design. For the adoption of the appropriate solution, Standard Penetration Test (SPT), Vane Test, Diagnostic peritoneal lavage (DPL) and auger boring campaigns were carried out. With the comparison of the results of these tests, the profiles of resistance of the soils and water levels were created in the studied sections. Geometric factors such as existing sidewalks and lack of elevation for the discharge of deep drainage water have inhibited traditional techniques for total removal of soft soils, thus avoiding the use of temporary drawdown and shoring of excavations. Thus, a structural layer was designed to reinforce the subgrade by means of the ‘needling’ of the soft soil, without the need for longitudinal drains. In this context, the article presents the geological and geotechnical studies carried out, but also the dimensioning of the reinforcement layer on the soft soil with a view to the main objective of this solution that is to allow the execution of the civil works without the interference in the roads in use, Execution of services in rainy periods, presentation of solution compatible with drainage characteristics and soft soil reinforcement.

Keywords: layer, reinforcement, soft soil, clover of north triage

Procedia PDF Downloads 197