Search results for: project manager
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5254

Search results for: project manager

5164 Application of Agile Project Management to Construction Projects: Case Study

Authors: Ran Etgar, Sarit Freund

Abstract:

Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.

Keywords: agile project management, construction, information systems, project management

Procedia PDF Downloads 130
5163 Importance of Risk Assessment in Managers´ Decision-Making Process

Authors: Mária Hudáková, Vladimír Míka, Katarína Hollá

Abstract:

Making decisions is the core of management and a result of conscious activities which is under way in a particular environment and concrete conditions. The managers decide about the goals, procedures and about the methods how to respond to the changes and to the problems which developed. Their decisions affect the effectiveness, quality, economy and the overall successfulness in every organisation. In spite of this fact, they do not pay sufficient attention to the individual steps of the decision-making process. They emphasise more how to cope with the individual methods and techniques of making decisions and forget about the way how to cope with analysing the problem or assessing the individual solution variants. In many cases, the underestimating of the analytical phase can lead to an incorrect assessment of the problem and this can then negatively influence its further solution. Based on our analysis of the theoretical solutions by individual authors who are dealing with this area and the realised research in Slovakia and also abroad we can recognise an insufficient interest of the managers to assess the risks in the decision-making process. The goal of this paper is to assess the risks in the managers´ decision-making process relating to the conditions of the environment, to the subject’s activity (the manager’s personality), to the insufficient assessment of individual variants for solving the problems but also to situations when the arisen problem is not solved. The benefit of this paper is the effort to increase the need of the managers to deal with the risks during the decision-making process. It is important for every manager to assess the risks in his/her decision-making process and to make efforts to take such decisions which reflect the basic conditions, states and development of the environment in the best way and especially for the managers´ decisions to contribute to achieving the determined goals of the organisation as effectively as possible.

Keywords: risk, decision-making, manager, process, analysis, source of risk

Procedia PDF Downloads 264
5162 Building Information Models Utilization for Design Improvement of Infrastructure

Authors: Keisuke Fujioka, Yuta Itoh, Masaru Minagawa, Shunji Kusayanagi

Abstract:

In this study, building information models of the underground temporary structures and adjacent embedded pipes were constructed to show the importance of the information on underground pipes adjacent to the structures to enhance the productivity of execution of construction. Next, the bar chart used in actual construction process were employed to make the Gantt chart, and the critical pass analysis was carried out to show that accurate information on the arrangement of underground existing pipes can be used for the enhancement of the productivity of the construction of underground structures. In the analyzed project, significant construction delay was not caused by unforeseeable existence of underground pipes by the management ability of the construction manager. However, in many cases of construction executions in the developing countries, the existence of unforeseeable embedded pipes often causes substantial delay of construction. Design change based on uncertainty on the position information of embedded pipe can be also important risk for contractors in domestic construction. So CPM analyses were performed by a project-management-software to the situation that influence of the tasks causing construction delay was assumed more significant. Through the analyses, the efficiency of information management on underground pipes and BIM analysis in the design stage for workability improvement was indirectly confirmed.

Keywords: building-information modelling, construction information modelling, design improvement, infrastructure

Procedia PDF Downloads 308
5161 Conceptualising Project Complexity in Ghana’s Construction Industry: A Qualitative Study

Authors: Kwasi Dartey-Baah, Mias De Klerk

Abstract:

Project complexity has been cited as one of the essential areas of project management. It can be observed from environmental, social, technological, and organisational viewpoints, and its handling is critical to project success. Conceptualised in varied industries, this paper seeks to ascertain the meaning and understanding of project complexity within the Ghanaian construction industry based on the three dimensions of complexities (faith, fact, and interaction) using experts' opinions. Taking the form of a focus group discussion, the paper sought to gain an in-depth understanding of project complexity issues in Ghana’s construction industry. The method use obtained data from experts (a purposely selected group) comprising project leaders and project management academics. The findings indicated that the experts broadly agreed with the complexity items but offered varied reasons for their agreement. In the composite assessment of the complexity dimensions of (faith, fact, and interaction), it emerged that there was some agreement with the complexity dimensions of fact and interaction within Ghana’s construction industry. On the other hand, with the dimension for complexity by faith, it was noted that the experts in Ghana’s construction construed complexity by faith, not as the absence of evidence but the evidence that hinges on at least a member of the project team. It is expected that other researches on project complexity will focus on other industries to enhance the knowledge of the same within the field of project management.

Keywords: project complexity, complexity by faith, complexity by fact, complexity by interaction, construction industry, Ghana

Procedia PDF Downloads 159
5160 A Predictive Analytics Approach to Project Management: Reducing Project Failures in Web and Software Development Projects

Authors: Tazeen Fatima

Abstract:

Use of project management in web & software development projects is very significant. It has been observed that even with the application of effective project management, projects usually do not complete their lifecycle and fail. To minimize these failures, key performance indicators have been introduced in previous studies to counter project failures. However, there are always gaps and problems in the KPIs identified. Despite of incessant efforts at technical and managerial levels, projects still fail. There is no substantial approach to identify and avoid these failures in the very beginning of the project lifecycle. In this study, we aim to answer these research problems by analyzing the concept of predictive analytics which is a specialized technology and is very easy to use in this era of computation. Project organizations can use data gathering, compute power, and modern tools to render efficient Predictions. The research aims to identify such a predictive analytics approach. The core objective of the study was to reduce failures and introduce effective implementation of project management principles. Existing predictive analytics methodologies, tools and solution providers were also analyzed. Relevant data was gathered from projects and was analyzed via predictive techniques to make predictions well advance in time to render effective project management in web & software development industry.

Keywords: project management, predictive analytics, predictive analytics methodology, project failures

Procedia PDF Downloads 347
5159 Project Knowledge Harvesting: The Case of Improving Project Performance through Project Knowledge Sharing Framework

Authors: Eng Rima Al-Awadhi, Abdul Jaleel Tharayil

Abstract:

In a project-centric organization like KOC, managing the knowledge of the project is of critical importance to the success of the project and the organization. However, due to the very nature and complexity involved, each project engagement generates a lot of 'learnings' that need to be factored into while new projects are initiated and thus avoid repeating the same mistake. But, many a time these learnings are localized and remains as ‘tacit knowledge’ leading to scope re-work, schedule overrun, adjustment orders, concession requests and claims. While KOC follows an asset based organization structure, with a multi-cultural and multi-ethnic workforce and larger chunk of the work is carried out through complex, long term project engagement, diffusion of ‘learnings’ across assets while dealing with the natural entropy of the organization is of great significance. Considering the relatively higher number of mega projects, it's important that the issues raised during the project life cycle are centrally harvested, analyzed and the ‘learnings’ from these issues are shared, absorbed and are in-turn utilized to enhance and refine the existing process and practices, leading to improve the project performance. One of the many factors contributing to the successful completion of a project on time is the reduction in the number of variations or concessions triggered during the project life cycle. The project process integrated knowledge sharing framework discusses the knowledge harvesting methodology adopted, the challenges faced, learnings acquired and its impact on project performance. The framework facilitates the proactive identification of issues that may have an impact on the overall quality of the project and improve performance.

Keywords: knowledge harvesting, project integrated knowledge sharing, performance improvement, knowledge management, lessons learn

Procedia PDF Downloads 396
5158 Effect of Project Control Practices on the Performance of Building Construction Companies in Uganda: A Case Study of Kampala City

Authors: Tukundane Hillary

Abstract:

This research paper analytically evaluates the project control practice levels used by the building construction companies within Kampala, Uganda. The research also assesses the outcome of project control practices on the productivity of the companies. The research was performed to ascertain the current control practices among 160 respondents from various construction companies registered with the Uganda Registration Services Bureau. This research used amalgamation from multiple literature to obtain the variables. The research adopts 34 standard control practices from four vital project control duties: planning, monitoring, analyzing, and reporting. These project control tasks were organized using mean response ratings grounded on their relevance to the construction companies. Results showed that evaluating performance with the use of curves (4.32), timely access to information and encouragement (4.55), report representation using quantitative tools 4.75, and cost value comparison application during analysis (4.76) were rated least among the control practices. On the other hand, the top project control practices included formulation of the project schedule (8.88), Project feasibility validation (8.86), Budgeting for each activity (8.84), Key project route definition (8.81), Team awareness of the budget (8.77), Setting realistic targets for projects (8.50) and Consultation from subcontractors (8.74). From the results obtained by the sample respondents specified, it can be concluded that planning is the most vital project control task practiced in the building construction industry in Uganda. In addition, this research ascertained a substantial relationship between project control practices and the performance of building construction companies. Accordingly, this research recommends that project control practices be effectively observed by both contracting and consulting companies to enhance their overall performance and governance.

Keywords: cost value, project control, cost control, time control, project performance, control practices

Procedia PDF Downloads 74
5157 A Principal-Agent Model for Sharing Mechanism in Integrated Project Delivery Context

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasingly attention from construction industry because of its efficiency of solving adversarial problems and reliability to deliver high-performing buildings. However, some evidence showed that some project participants obtained less profit from IPD projects than the typical projects. They attributed it to the unfair IPD sharing mechanism, which resulted in additional time and cost of negotiation on the sharing fractions among project participants. The study is aimed to investigate the reward distribution by constructing a principal-agent model. Based on cooperative game theory, it is examined how to distribute the shared project rewards between client and non-client parties, and identify the sharing fractions among non-client parties. It is found that at least half of the project savings should be allocated to the non-client parties to motivate them to create more project value. Second, the client should raise his sharing fractions when the integration among project participants is efficient. In addition, the client should allocate higher sharing fractions to the non-client party who is more able. This study can help the IPD project participants make fair and motivated sharing mechanisms.

Keywords: cooperative game theory, IPD, principal agent model, sharing mechanism

Procedia PDF Downloads 292
5156 Strategic Tools for Entrepreneurship: Model Proposal for Manufacturing Companies

Authors: Chiara Mansanta, Daniela Sani

Abstract:

The present paper presents the further development of the application of a standard methodology to boost innovation inside real case studies of manufacturing companies. The proposed methodology provides a viable solution for manufacturing companies that have to evaluate new business ideas. The study underlined the concept of entrepreneurship and how a manager can use it to promote innovation inside their companies. Starting from a literature study on entrepreneurship, this paper examines the role of the manager in supporting a company’s development. The empirical part of the study is based on two manufacturing companies that used the proposed methodology to favour entrepreneurship through an alternative approach. The research demonstrated the need for companies to have a structured and well-defined methodology to achieve their goals. The purpose of this article is to understand the significance of business models inside companies and explore how they affect business strategy and innovation management. The idea is to use business models to support entrepreneurs in their decision-making processes, reducing risks and avoiding errors.

Keywords: entrepreneurship, manufacturing companies, solution validation, strategic management

Procedia PDF Downloads 95
5155 Managing Multiple Change Projects in Supply Chains: A Case Study of a Moroccan Multi-Technical Services Company

Authors: Abdelouahab Errida, Bouchra Lotfi, Elalami Semma

Abstract:

In this paper, we try to address the topic of multiple change management by adopting an engineered research methodology, conducted within a Moroccan company during its implementation of several change projects that aim at improving its supply chain management performance. Firstly, we present the key concepts related to our research, namely change management, multiproject management and supply chain management. Then, we try to assess how the change management and multi-project management are applied in this company. Finally, we try to propose an approach that will help managers in dealing with multiple change projects. This approach proposes to integrate change management, project management and multi-project management for managing change projects according to three organizational levels: executive level, project portfolio level and change project level.

Keywords: change management, multi-project management, project management, change portfolio, supply chain management,

Procedia PDF Downloads 236
5154 The Impact of Management Competency, Project Team, and Process Design to Corporate Performance through Implementing the Self-Development ERP

Authors: Zeplin Jiwa Husada Tarigan, Sautma Ronni Basana, Widjojo Suprapto

Abstract:

Manufacturing companies in East Java develop their own ERP system or alter the ERP system which is developed by other companies to suit their needs. To make their own system, the companies mostly assign several employees from various departments to create a project team, and the employees are from the departments that are going to utilize the ERP system as the integrated data. The project team decides the making of the ERP system from the preparation stage until the going live implementation process. In designing the business process, the top management is working together with the project team until the project is accomplished. The completion of the ERP projects depends on the project to be undertaken itself, the strategy chosen to complete the project, the work method selection, the measurement system to monitor the project, the evaluation system of the project, and, in the end, the declaration of 'going live' of the ERP project. There is an increase in the business performance for the companies that have implemented the information technology or ERP as they manage to integrate all management functions within their companies. To investigate, some questionnaires are distributed to 100 manufacturing companies, and 90 questionnaires are returned; however, there are only 46 companies that develop their own ERP system, so the response rate is 46%. The result of data analysis using PLS shows that the management competency brings impacts to the project team and the process design. The process design is adjusted to the real process in order to implement the ERP, but it does not bring direct impacts to the business performance. The implementation of ERP brings positive impacts to the company business performance.

Keywords: management competency, project team, process design, ERP implementation, business performance

Procedia PDF Downloads 218
5153 Measurement of Project Success in Construction Using Performance Indices

Authors: Annette Joseph

Abstract:

Background: The construction industry is dynamic in nature owing to the increasing uncertainties in technology, budgets, and development processes making projects more complex. Thus, predicting project performance and chances of its likely success has become difficult. The goal of all parties involved in construction projects is to successfully complete it on schedule, within planned budget and with the highest quality and in the safest manner. However, the concept of project success has remained ambiguously defined in the mind of the construction professionals. Purpose: This paper aims to study the analysis of a project in terms of its performance and measure the success. Methodology: The parameters for evaluating project success and the indices to measure success/performance of a project are identified through literature study. Through questionnaire surveys aimed at the stakeholders in the projects, data is collected from two live case studies (an ongoing and completed project) on the overall performance in terms of its success/failure. Finally, with the help of SPSS tool, the data collected from the surveys are analyzed and applied on the selected performance indices. Findings: The score calculated by using the indices and models helps in assessing the overall performance of the project and interpreting it to find out whether the project will be a success or failure. This study acts as a reference for firms to carry out performance evaluation and success measurement on a regular basis helping projects to identify the areas which are performing well and those that require improvement. Originality & Value: The study signifies that by measuring project performance; a project’s deviation towards success/failure can be assessed thus helping in suggesting early remedial measures to bring it on track ensuring that a project will be completed successfully.

Keywords: project, performance, indices, success

Procedia PDF Downloads 191
5152 Overcoming the Impacts of Covid-19 Outbreak Using Value Integrated Project Delivery Model

Authors: G. Ramya

Abstract:

Value engineering is a systematic approach, widely used to optimize the design or process or product in the designing stage. It used to achieve the client's obligation by increasing the functionality and attain the targeted cost in the cost planning. Value engineering effectiveness and benefits decrease along with the progress of the project since the change in the scope of the work and design will account for more cost all along the lifecycle of the project. Integrating the value engineering with other project management activities will promote cost minimization, client satisfaction, and ensure early completion of the project in time. Previous research studies suggested that value engineering can integrate with other project delivery activities, but research studies unable to frame a model that collaborates the project management activities with the job plan of value engineering approach. I analyzed various project management activities and their synergy between each other. The project management activities and processes like a)risk analysis b)lifecycle cost analysis c)lean construction d)facility management e)Building information modelling f)Contract administration, collaborated, and project delivery model planned along with the RIBA plan of work. The key outcome of the research is a value-driven project delivery model, which will succeed in dealing with the economic impact, constraints and conflicts arise due to the COVID-19 outbreak in the Indian construction sector. Benefits associated with the structured framework is construction project delivery that ensures early contractor involvement, mutual risk sharing, and reviving the project with a cost overrun and delay back on track ,are discussed. Keywords: Value-driven project delivery model, Integration, RIBA plan of work Themes: Design Economics

Keywords: value-driven project delivery model, Integration, RIBA

Procedia PDF Downloads 118
5151 Project and Experiment-Based Fluid Dynamics Education

Authors: Etsuo Morishita

Abstract:

This paper presents the project and experiment-based fluid dynamics education in Meisei University, a private institution in Tokyo, Japan. We pay attention not only to the basic engineering courses but also to the practical aspect of engineering experience. So, we prepare courses called the Projects from I to VI. The Projects I and II are designed for the first year, III and IV are designated for the second year, V and VI are prepared for the third year, respectively. Each supervisor is responsible for two of these projects every year. When students take the Project V and VI at the third year, we automatically assume that these students will join the lab of the project for the graduation thesis. We would like to show our experience in the Project I in the summer term, 2016. In this project, we introduce a traction flight vehicle called Cat Flyer. This is a kind of a kite towed by a car for example. This is very similar to parasailing, but flight is possible even on the roads. Experiments in mechanical engineering education are also very important, and we would like to explain our course on centrifugal pump, venture, and orifice. Although these are described in detail in the text books of fluid dynamics, it is still crucial to have practical experiments as a student.

Keywords: aerodynamics, experiment, fluid dynamics, project

Procedia PDF Downloads 258
5150 Application of Industrial Ecology to the INSPIRA Zone: Territory Planification and New Activities

Authors: Mary Hanhoun, Jilla Bamarni, Anne-Sophie Bougard

Abstract:

INSPIR’ECO is a 18-month research and innovation project that aims to specify and develop a tool to offer new services for industrials and territorial planners/managers based on Industrial Ecology Principles. This project is carried out on the territory of Salaise Sablons and the services are designed to be deployed on other territories. Salaise-Sablons area is located in the limit of 5 departments on a major European economic axis multimodal traffic (river, rail and road). The perimeter of 330 ha includes 90 hectares occupied by 20 companies, with a total of 900 jobs, and represents a significant potential basin of development. The project involves five multi-disciplinary partners (Syndicat Mixte INSPIRA, ENGIE, IDEEL, IDEAs Laboratory and TREDI). INSPIR’ECO project is based on the principles that local stakeholders need services to pool, share their activities/equipment/purchases/materials. These services aims to : 1. initiate and promote exchanges between existing companies and 2. identify synergies between pre-existing industries and future companies that could be implemented in INSPIRA. These eco-industrial synergies can be related to: the recovery / exchange of industrial flows (industrial wastewater, waste, by-products, etc.); the pooling of business services (collective waste management, stormwater collection and reuse, transport, etc.); the sharing of equipments (boiler, steam production, wastewater treatment unit, etc.) or resources (splitting jobs cost, etc.); and the creation of new activities (interface activities necessary for by-product recovery, development of products or services from a newly identified resource, etc.). These services are based on IT tool used by the interested local stakeholders that intends to allow local stakeholders to take decisions. Thus, this IT tool: - include an economic and environmental assessment of each implantation or pooling/sharing scenarios for existing or further industries; - is meant for industrial and territorial manager/planners - is designed to be used for each new industrial project. - The specification of the IT tool is made through an agile process all along INSPIR’ECO project fed with: - Users expectations thanks to workshop sessions where mock-up interfaces are displayed; - Data availability based on local and industrial data inventory. These input allow to specify the tool not only with technical and methodological constraints (notably the ones from economic and environmental assessments) but also with data availability and users expectations. A feedback on innovative resource management initiatives in port areas has been realized in the beginning of the project to feed the designing services step.

Keywords: development opportunities, INSPIR’ECO, INSPIRA, industrial ecology, planification, synergy identification

Procedia PDF Downloads 163
5149 Statistical Quality Control on Assignable Causes of Variation on Cement Production in Ashaka Cement PLC Gombe State

Authors: Hamisu Idi

Abstract:

The present study focuses on studying the impact of influencer recommendation in the quality of cement production. Exploratory research was done on monthly basis, where data were obtained from secondary source i.e. the record kept by an automated recompilation machine. The machine keeps all the records of the mills downtime which the process manager checks for validation and refer the fault (if any) to the department responsible for maintenance or measurement taking so as to prevent future occurrence. The findings indicated that the product of the Ashaka Cement Plc. were considered as qualitative, since all the production processes were found to be in control (preset specifications) with the exception of the natural cause of variation which is normal in the production process as it will not affect the outcome of the product. It is reduced to the bearest minimum since it cannot be totally eliminated. It is also hopeful that the findings of this study would be of great assistance to the management of Ashaka cement factory and the process manager in particular at various levels in the monitoring and implementation of statistical process control. This study is therefore of great contribution to the knowledge in this regard and it is hopeful that it would open more research in that direction.

Keywords: cement, quality, variation, assignable cause, common cause

Procedia PDF Downloads 261
5148 An Improved GA to Address Integrated Formulation of Project Scheduling and Material Ordering with Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of the resource constraint project scheduling and material ordering problems have received significant attention within the last decades. Hence, the issue has been investigated here with the aim to minimize total project costs. Furthermore, the presented model considers different discount options in order to approach the real world conditions. The incorporated alternatives consist of all-unit and incremental discount strategies. On the other hand, a modified version of the genetic algorithm is applied in order to solve the model for larger sizes, in particular. Finally, the applicability and efficiency of the given model is tested by different numerical instances.

Keywords: genetic algorithm, material ordering, project management, project scheduling

Procedia PDF Downloads 301
5147 Feasibility Study of Potential and Economic of Rice Straw VSPP Power Plant in Thailand

Authors: Sansanee Sansiribhan, Anusorn Rattanathanaophat, Chirapan Nuengchaknin

Abstract:

The potential feasibility of a 9.5 MWe capacity rice straw power plant project in Thailand was studied by evaluating the rice straw resource. The result showed that Thailand had a high rice straw biomass potential at the provincial level, especially, the provinces in the central, northeastern and western Thailand, which could feasibly develop plants. The economic feasibility of project was also investigated. The financial feasibility is also evaluated based on two important factors in the project, i.e., NPV ≥ 0 and IRR ≥ 11%. It was found that the rice straw power plant project at 9.5 MWe was financially feasible with the cost of fuel in the range of 30.6-47.7 USD/t.

Keywords: power plant, project feasibility, rice straw, Thailand

Procedia PDF Downloads 334
5146 Let’s talk about it! Increasing Advance Directives and End-of-Life Planning Awareness & Acceptance in Multi-Cultural Population with Low Health Literacy in a Faith-Based Setting

Authors: Tonya P. Bowers

Abstract:

Background: The community/patient-focused quality improvement (QI) project has resolved a clinical problem using a quantitative design evaluating behavior change practices in a convenience sample from a multi-cultural congregation in a faith-based setting. AD is a legal document that speaks for the patient when they are unable to speak for themselves. The AD provides detailed information regarding critical medical decisions on behalf of the patient if they’re unable to make decisions themselves. The goal of an AD is to improve EOL care renderings that align with the patient’s desires. The AD diminishes anxiety and stress associated with making difficult EOL care decisions for patients and their families. Method: The project has two intervention strategies: pre-intervention and post-intervention formative surveys and a final summative survey. Most of the data collection takes place during implementation. The Let’s Talk About It Program utilized an online meeting platform for presentation. Participants were asked to complete informed consent and surveys via an online portal. Education included slide presentation, Advance Directive demonstration, video clips, discussions and 1:1 assistance with AD completion with a project manager. Results: Considering the overwhelming likelihood responses where 87.5% identified they “definitely would” hold an End-Of-Life conversation with their healthcare provider or family, and 81.25% indicated their likelihood that they “definitely would” complete an advance directive. In addition, the final summative post-intervention survey (n-14) also demonstrated an overwhelming 93% positive response. Which undoubtedly demonstrates favorable outcomes for the project. Conclusion: the Let’s Talk About It Program demonstrated effectiveness in improving participants' attitudes and acceptance towards Advance Directives and expanding End-of-Life care discussions. Emphasis on program sustainment within the church is imperative in fostering continued awareness and improved health outcomes for the local community with low health literacy.

Keywords: advance directive, end of life, advance care planning, palliative care, low health literacy, faith-based

Procedia PDF Downloads 210
5145 CDIO-Based Teaching Reform for Software Project Management Course

Authors: Liping Li, Wenan Tan, Na Wang

Abstract:

With the rapid development of information technology, project management has gained more and more attention recently. Based on CDIO, this paper proposes some teaching reform ideas for software project management curriculum. We first change from Teacher-centered classroom to Student-centered and adopt project-driven, scenario animation show, teaching rhythms, case study and team work practice to improve students' learning enthusiasm. Results showed these attempts have been well received and very effective; as well, students prefer to learn with this curriculum more than before the reform.

Keywords: CDIO, teaching reform, engineering education, project-driven, scenario animation simulation

Procedia PDF Downloads 429
5144 The Artificial Intelligence (AI) Impact on Project Management: A Destructive or Transformative Agent

Authors: Kwame Amoah

Abstract:

Artificial intelligence (AI) has the prospect of transforming project management, significantly improving efficiency and accuracy. By automating specific tasks with defined guidelines, AI can assist project managers in making better decisions and allocating resources efficiently, with possible risk mitigation. This study explores how AI is already impacting project management and likely future AI's impact on the field. The AI's reaction has been a divided opinion; while others picture it as a destroyer of jobs, some welcome it as an innovation advocate. Both sides agree that AI will be disruptive and revolutionize PM's functions. If current research is to go by, AI or some form will replace one-third of all learning graduate PM jobs by as early as 2030. A recent survey indicates AI spending will reach $97.9 billion by the end of 2023. Considering such a profound impact, the project management profession will also see a paradigm shift driven by AI. The study examines what the project management profession will look like in the next 5-10 years after this technological disruption. The research methods incorporate existing literature, develop trend analysis, and conduct structured interviews with project management stakeholders from North America to gauge the trend. PM professionals can harness the power of AI, ensuring a smooth transition and positive outcomes. AI adoption will maximize benefits, minimize adverse consequences, and uphold ethical standards, leading to improved project performance.

Keywords: project management, disruptive teacnologies, project management function, AL applications, artificial intelligence

Procedia PDF Downloads 83
5143 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects

Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima

Abstract:

Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.

Keywords: continuous improvement, critical success factors (csf), lean thinking, project management

Procedia PDF Downloads 364
5142 Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Problem by Preemptive Fuzzy Goal Programming

Authors: Busaba Phurksaphanrat

Abstract:

This research proposes a pre-emptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of make-span. However, both time and cost should be considered at the same time with different level of important priorities. Moreover, all elements of cost functions in a project are not included in the conventional cost objective function. Incomplete total project cost causes an error in finding the project scheduling time. In this research, pre-emptive fuzzy goal programming is presented to solve the multi-objective multi-mode resource constrained project scheduling problem. It can find the compromise solution of the problem. Moreover, it is also flexible in adjusting to find a variety of alternative solutions.

Keywords: multi-mode resource constrained project scheduling problem, fuzzy set, goal programming, pre-emptive fuzzy goal programming

Procedia PDF Downloads 435
5141 The Choosing the Right Projects With Multi-Criteria Decision Making to Ensure the Sustainability of the Projects

Authors: Saniye Çeşmecioğlu

Abstract:

The importance of project sustainability and success has become increasingly significant due to the proliferation of external environmental factors that have decreased project resistance in contemporary times. The primary approach to forestall the failure of projects is to ensure their long-term viability through the strategic selection of projects as creating judicious project selection framework within the organization. Decision-makers require precise decision contexts (models) that conform to the company's business objectives and sustainability expectations during the project selection process. The establishment of a rational model for project selection enables organizations to create a distinctive and objective framework for the selection process. Additionally, for the optimal implementation of this decision-making model, it is crucial to establish a Project Management Office (PMO) team and Project Steering Committee within the organizational structure to oversee the framework. These teams enable updating project selection criteria and weights in response to changing conditions, ensuring alignment with the company's business goals, and facilitating the selection of potentially viable projects. This paper presents a multi-criteria decision model for selecting project sustainability and project success criteria that ensures timely project completion and retention. The model was developed using MACBETH (Measuring Attractiveness by a Categorical Based Evaluation Technique) and was based on broadcaster companies’ expectations. The ultimate results of this study provide a model that endorses the process of selecting the appropriate project objectively by utilizing project selection and sustainability criteria along with their respective weights for organizations. Additionally, the study offers suggestions that may ascertain helpful in future endeavors.

Keywords: project portfolio management, project selection, multi-criteria decision making, project sustainability and success criteria, MACBETH

Procedia PDF Downloads 62
5140 A Bi-Objective Model to Address Simultaneous Formulation of Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering has been increasingly addressed within last decades as an approach to improve the project execution costs. Therefore, we have taken the problem into consideration in this paper, aiming to maximize schedules quality robustness, in addition to minimize the relevant costs. In this regard, a bi-objective mathematical model is developed to formulate the problem. Moreover, it is possible to utilize the all-unit discount for materials purchasing. The problem is then solved by the constraint method, and the Pareto front is obtained for a variety of robustness values. The applicability and efficiency of the proposed model is tested by different numerical instances, finally.

Keywords: e-constraint method, material ordering, project management, project scheduling

Procedia PDF Downloads 295
5139 Designing a Model for Preparing Reports on the Automatic Earned Value Management Progress by the Integration of Primavera P6, SQL Database, and Power BI: A Case Study of a Six-Storey Concrete Building in Mashhad, Iran

Authors: Hamed Zolfaghari, Mojtaba Kord

Abstract:

Project planners and controllers are frequently faced with the challenge of inadequate software for the preparation of automatic project progress reports based on actual project information updates. They usually make dashboards in Microsoft Excel, which is local and not applicable online. Another shortcoming is that it is not linked to planning software such as Microsoft Project, which lacks the database required for data storage. This study aimed to propose a model for the preparation of reports on automatic online project progress based on actual project information updates by the integration of Primavera P6, SQL database, and Power BI for a construction project. The designed model could be applicable to project planners and controller agents by enabling them to prepare project reports automatically and immediately after updating the project schedule using actual information. To develop the model, the data were entered into P6, and the information was stored on the SQL database. The proposed model could prepare a wide range of reports, such as earned value management, HR reports, and financial, physical, and risk reports automatically on the Power BI application. Furthermore, the reports could be published and shared online.

Keywords: primavera P6, SQL, Power BI, EVM, integration management

Procedia PDF Downloads 108
5138 Risk Assessment in Construction of K-Span Buildings in United Arab Emirates (UAE)

Authors: Imtiaz Ali, Imam Mansoor

Abstract:

Investigations as a part of the academic study were undertaken to identify and evaluate the significant risks associated with the construction of K-span buildings in the region of UAE. Primary field data was collected through questionnaires obtaining specific open and close-ended questions from carefully selected construction firms, civil engineers and, construction manager regarding risks associated to K-span building construction. Historical data available for other regions of the same construction technique was available which was compared for identifying various non-critical and critical risk parameters by comparative evaluation techniques to come up with important risks and potential sources for their control and minimization in K-Span buildings that is increasing in the region. The associated risks have been determined with their Relative Importance Index (RII) values of which Risk involved in Change of Design required by Owners carries the highest value (RII=0.79) whereas, Delayed Payment by Owner to Contractor is one of the least (RII=0.42) value. The overall findings suggest that most relative risks as quantified originate or associated with the contractors. It may be concluded that project proponents undertaking K-span projects in planning and budgeting the cost and delays should take into account of risks on high account if changes in design are also required any delays in the material by the supplier would then be a major risk in K-span project delay. Since projects are, less costly, so owners have limited budgets, then they hire small contractors, which are not highly competent contractors. So study suggests that owner should be aware of these types of risks associated with the construction of K-span buildings in order to make it cost effective.

Keywords: k-span buildings, k-span construction, risk management, relative improvement index (RII)

Procedia PDF Downloads 375
5137 Analysis of Risks of Adopting Integrated Project Delivery: Application of Bayesian Theory

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasing attention from construction industry due to its reliability to deliver high-performing buildings. However, unavailable IPD specific insurance concerns the industry participants who are interested in IPD implementation. Even though the risk management capability can be enhanced using shared risk mechanism, some risks may occur when the partners do not commit themselves into the integrated practices in a desired manner. This is because the intense collaboration and close integration can not only create added value but bring new opportunistic behaviors and disputes. The study is aimed to investigate the risks of implementing IPD using Bayesian theory. IPD risk taxonomy is presented to identify all potential risks of implementing IPD and a risk network map is developed to capture the interdependencies between IPD risks. The conditional relations between risk occurrences and the impacts of IPD risks on project performances are evaluated and simulated based on Bayesian theory. The probability of project outcomes is predicted by simulation. In addition, it is found that some risks caused by integration are most possible occurred risks. This study can help the IPD project participants identify critical risks of adopting IPD to improve project performances. In addition, it is helpful to develop IPD specific insurance when the pertinent risks can be identified.

Keywords: Bayesian theory, integrated project delivery, project risks, project performances

Procedia PDF Downloads 300
5136 Designing a Method to Control and Determine the Financial Performance of the Real Cost Sub-System in the Information Management System of Construction Projects

Authors: Alireza Ghaffari, Hassan Saghi

Abstract:

Project management is more complex than managing the day-to-day affairs of an organization. When the project dimensions are broad and multiple projects have to be monitored in different locations, the integrated management becomes even more complicated. One of the main concerns of project managers is the integrated project management, which is mainly rooted in the lack of accurate and accessible information from different projects in various locations. The collection of dispersed information from various parts of the network, their integration and finally the selective reporting of this information is among the goals of integrated information systems. It can help resolve the main problem, which is bridging the information gap between executives and senior managers in the organization. Therefore, the main objective of this study is to design and implement an important subset of a project management information system in order to successfully control the cost of construction projects so that its results can be used to design raw software forms and proposed relationships between different project units for the collection of necessary information.

Keywords: financial performance, cost subsystem, PMIS, project management

Procedia PDF Downloads 109
5135 An Integrated Mixed-Integer Programming Model to Address Concurrent Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering can provide more flexibility to the project scheduling problem, as the project execution costs can be enhanced. Hence, the issue has been taken into account in this paper. To do so, a mixed-integer mathematical model is developed which considers the aforementioned flexibility, in addition to the materials quantity discount and space availability restrictions. Moreover, the activities duration has been treated as decision variables. Finally, the efficiency of the proposed model is tested by different instances. Additionally, the influence of the aforementioned parameters is investigated on the model performance.

Keywords: material ordering, project scheduling, quantity discount, space availability

Procedia PDF Downloads 367