Search results for: menstrual hygiene management
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 9870

Search results for: menstrual hygiene management

8730 Factors Constraining the Utilization of Risk Management Strategies in the Execution of Public Construction Projects in North East Nigeria

Authors: S. U. Kunya, S. A. Mohammad

Abstract:

Construction projects in Nigeria are characterized with risks emanating from delays and accompanying cost-overruns. The aim of the study was to identify and assess factors constraining the utilization of risk management strategies in the execution of public construction project in North-East Nigeria. Data was collected with the aid of a well-structured questionnaire administered to three identified projects in the North-east. Data collected were analysed using the severity index. Findings revealed political involvement, selection of inexperienced contractors and lack of coordinated public sector strategy as the most severe factors constraining the utilization of risk management strategies. The study recommended that: formulation of laws to prevent negative political meddling in construction projects; selection of experienced, risk-informed contractors; and comprehensive risk assessment and planning on all public construction projects.

Keywords: factors, Nigeria, north-east, public projects, risk management, strategies, utilization

Procedia PDF Downloads 532
8729 The Design and Applied of Learning Management System via Social Media on Internet: Case Study of Operating System for Business Subject

Authors: Pimploi Tirastittam, Sawanath Treesathon, Amornrath Ongkawat

Abstract:

Learning Management System (LMS) is the system which uses to manage the learning in order to grouping the content and learning activity between the lecturer and learner including online examination and evaluation. Nowadays, it is the borderless learning era so the learning activities can be accessed from everywhere in the world and also anytime via the information technology and media. The learner can easily access to the knowledge so the different in time and distance is not a constraint for learning anymore. The learning pattern which was used in this research is the integration of the in-class learning and online learning via internet and will be able to monitor the progress by the Learning management system which will create the fast response and accessible learning process via the social media. In order to increase the capability and freedom of the learner, the system can show the current and history of the learning document, video conference and also has the chat room for the learner and lecturer to interact to each other. So the objectives of the “The Design and Applied of Learning Management System via Social Media on Internet: Case Study of Operating System for Business Subject” are to expand the opportunity of learning and to increase the efficiency of learning as well as increase the communication channel between lecturer and student. The data of this research was collect from 30 users of the system which are students who enroll in the subject. And the result of the research is in the “Very Good” which is conformed to the hypothesis.

Keywords: Learning Management System, social media, Operating System, information technology

Procedia PDF Downloads 355
8728 Analysis and Mapping of Climate and Spring Yield in Tanahun District, Nepal

Authors: Resham Lal Phuldel

Abstract:

This study based on a bilateral development cooperation project funded by the governments of Nepal and Finland. The first phase of the project has been completed in August 2012 and the phase II started in September 2013 and will end September 2018. The project strengthens the capacity of local governments in 14 districts to deliver services in water supply, sanitation and hygiene in Western development region and in Mid-Western development region of Nepal. In recent days, several spring sources have been dried out or slowly decreasing its yield across the country due to changing character of rainfall, increasing evaporative losses and some other manmade causes such as land use change, infrastructure development work etc. To sustain the hilly communities, the sources have to be able to provide sufficient water to serve the population, either on its own or in conjunction with other sources. Phase III have measured all water sources in Tanahu district in 2004 and sources were located with the GPS. Phase II has repeated the exercise to see changes in the district. 3320 water sources as identified in 2004 and altogether 4223 including new water sources were identified and measured in 2014. Between 2004 and 2014, 50% flow rate (yield) deduction of point sources’ average yield in 10 years is found. Similarly, 21.6% and 34% deductions of average yield were found in spring and stream water sources respectively. The rainfall from 2002 to 2013 shows erratic rainfalls in the district. The monsoon peak month is not consistent and the trend shows the decrease of annual rainfall 16.7 mm/year. Further, the temperature trend between 2002 and 2013 shows warming of + 0.0410C/year.

Keywords: climate change, rainfall, source discharge, water sources

Procedia PDF Downloads 282
8727 Implementation of Distributor Management Solution and Its Effects on Supply Chain Performance

Authors: Charles Amoatey, Ebenezer Kumah

Abstract:

Purpose: The purpose of this paper is to assess the effects of implementation of Distributor Management Solution (DMS) on supply chain performance in the Fast Moving Consumer Goods (FMCG) industry in Ghana. Methodology: A purposive sampling approach was used in selecting the respondents for the study. Data was collected from senior management and field supervisors from sales, distribution and customer service units of the case study firm and its channel members. This study made use of systematic literature review and results of survey data analysis to assess how information system has been used to improve supply chain performance. Findings: Results from the study showed that the critical effect factors from implementation of a DMS include (1) Obtain prompt and reliable feedback from the market; (2) Building the capacity and skills levels of employees as well as 3rd Party Agents; (3) Motivated top management to invest in MIS; and (4) Performance improvement in sales route management. The most critical challenges to an effective and sustainable MIS implementation are lack of enough trained IT employees and high barriers to cultural change especially with distributors. The paper recommends consistent investment in IS infrastructure and development of IT skills. Research limitations/implications: This study contributes to the literature by exploring the effects of distribution management solution implementation and supply chain performance in a developing country context. Considering the fact that this study is based on data from only one case study firm and its channel members, generalization of the results should be treated with caution. Practical implications: The findings have confirmed the benefits of implementing a Management Information System. The result should encourage channel members to allocate adequate resources for building MIS capacity to enhance their supply chain performance. Originality/Value: In this paper, the relationship between DMS/MIS implementation and improvement in supply chain performance, in the Ghanaian context, has been established.

Keywords: distributor management solution, fast-moving consumer goods, supply chain management, information systems, Ghana

Procedia PDF Downloads 562
8726 Water Quality and Coastal Management Profile Assessment of Puerto Galera Bay, Philippines

Authors: Ma. Manna Farrel B. Pinto

Abstract:

As global industrialization progresses, the environment remains to be at risk of disturbances brought by developments of cities and communities. Impacts of flourishing industries such as tourism require rapid growth of establishments and may threaten ecosystems and natural resources. Puerto Galera as a biosphere reserve and declared as the Center of the World’s Center of Marine Shorefish Biodiversity is on the brink of ecological deterioration as tourism further develops in its coastal areas. Apparently, attempts were initiated to establish a baseline for designation of protection in the economic and coastal marine zones of Puerto Galera but continuity of its implementation and coordination of concerned units remains deficient. Indications of eutrophication have been observed based on water quality analysis although parameter values still comply with the national standards for coastal waters. Water quality data, biodiversity and hydrodynamic information, gathered from studies, and local government units were analysed to assess the condition of the coast as well as acting policies implemented by the local authorities. Sources of contaminants were also located in its three main communities, and their shores wherein in recommendations for installing wastewater treatment facilities and further improvement of policies of waste discharge must be addressed. With a conceptual framework proposed in the study, a comprehensive data analysis and coordinated management are necessary to form an integrated coastal management for further protection and preservation of the sustainable coastal marine ecosystem of Puerto Galera.

Keywords: coastal management, environmental management, integrated resource management, Puerto Galera

Procedia PDF Downloads 267
8725 Design of Collection and Transportation System of Municipal Solid Waste in Meshkinshahr City

Authors: Ebrahim Fataei, Seyed Ali Hosseini, Zahra Arabi, Habib farhadi, Mehdi Aalipour Erdi, Seiied Taghi Seiied Safavian

Abstract:

Solid waste production is an integral part of human life and management of waste require full scientific approach and essential planning. The allocation of most management cost to collection and transportation and also the necessity of operational efficiency in this system, by limiting time consumption, and on the other hand optimum collection system and transportation is the base of waste design and management. This study was done to optimize the exits collection and transportation system of solid waste in Meshkinshahr city. So based on the analyzed data of municipal solid waste components in seven zones of Meshkinshahr city, and GIS software, applied to design storage place based on origin recycling and a route to collect and transport. It was attempted to represent an appropriate model to store, collect and transport municipal solid waste. The result shows that GIS can be applied to locate the waste container and determine a waste collection direction in an appropriate way.

Keywords: municipal solid waste management, transportation, optimizing, GIS, Iran

Procedia PDF Downloads 534
8724 A Service Evaluation Exploring the Effectiveness of a Tier 3 Weight Management Programme Offering Face-To-Face and Remote Dietetic Support

Authors: Rosemary E. Huntriss, Lucy Jones

Abstract:

Obesity and excess weight continue to be significant health problems in England. Traditional weight management programmes offer face-to-face support or group education. Remote care is recognised as a viable means of support; however, its effectiveness has not previously been evaluated in a tier 3 weight management setting. This service evaluation explored the effectiveness of online coaching, telephone support, and face-to-face support as optional management strategies within a tier 3 weight management programme. Outcome data were collected for adults with a BMI ≥ 45 or ≥ 40 with complex comorbidity who were referred to a Tier 3 weight management programme from January 2018 and had been discharged before October 2018. Following an initial 45-minute consultation with a specialist weight management dietitian, patients were offered a choice of follow-up support in the form of online coaching supported by an app (8 x 15 minutes coaching), face-to-face or telephone appointments (4 x 30 minutes). All patients were invited to a final 30-minute face-to-face assessment. The planned intervention time was between 12 and 24 weeks. Patients were offered access to adjunct face-to-face or telephone psychological support. One hundred and thirty-nine patients were referred into the programme from January 2018 and discharged before October 2018. One hundred and twenty-four patients (89%) attended their initial assessment. Out of those who attended their initial assessment, 110 patients (88.0%) completed more than half of the programme and 77 patients (61.6%) completed all sessions. The average length of the completed programme (all sessions) was 17.2 (SD 4.2) weeks. Eighty-five (68.5%) patients were coached online, 28 (22.6%) patients were supported face-to-face support, and 11 (8.9%) chose telephone support. Two patients changed from online coaching to face-to-face support due to personal preference and were included in the face-to-face group for analysis. For those with data available (n=106), average weight loss across the programme was 4.85 (SD 3.49)%; average weight loss was 4.70 (SD 3.19)% for online coaching, 4.83 (SD 4.13)% for face-to-face support, and 6.28 (SD 4.15)% for telephone support. There was no significant difference between weight loss achieved with face-to-face vs. online coaching (4.83 (SD 4.13)% vs 4.70 (SD 3.19) (p=0.87) or face-to-face vs. remote support (online coaching and telephone support combined) (4.83 (SD 4.13)% vs 4.85 (SD 3.30)%) (p=0.98). Remote support has been shown to be as effective as face-to-face support provided by a dietitian in the short-term within a tier 3 weight management setting. The completion rates were high compared with another tier 3 weight management services suggesting that offering remote support as an option may improve completion rates within a weight management service.

Keywords: dietitian, digital health, obesity, weight management

Procedia PDF Downloads 141
8723 Enterprise Risk Management, Human Capital and Organizational Performance: Insights from Public Listed Companies

Authors: Omar Moafaq Saleh Aljanabi, Noradiva Hamzah, Ruhanita Maelah

Abstract:

In today’s challenging global economy, which is driven by information and knowledge, risk management is undergoing a great change, as organizations shift from traditional and compartmental risk management to an enterprise-wide approach. Enterprise risk management (ERM), which aims at increasing the sustainability of an organization and achieving competitive advantage, is gaining global attention and fast becoming an essential concern in all industries. Furthermore, in order to be effective, ERM should be managed by managers with high-level skills and knowledge. Despite the importance of the knowledge embedded in, there remains a paucity of evidence concerning how human capital could influence the organization’s ERM. Responses from 116 public listed companies (PLCs) on the main market of Bursa Malaysia were analyzed using Structural Equation Modelling (SEM). This study found that there is a significant association between ERM and organizational performance. The results also indicate that human capital has a positive moderating effect on the relationship between ERM and performance. The study contributes to the ERM literature by providing empirical evidence on the relationship between ERM, human capital, and organizational performance. Findings from this study also provide guidelines for managers, policy makers, and the regulatory bodies, to evaluate the ERM practices in PLCs.

Keywords: enterprise risk management, human capital, organizational performance, Malaysian public listed companies

Procedia PDF Downloads 195
8722 Load Management Using Multiple Sequential Load Shaping Techniques

Authors: Amira M. Attia, Karim H. Youssef, Nabil H. Abbasi

Abstract:

Demand Side Management (DSM) is an essential characteristic of current and future smart grid systems. As one of DSM functions, load management aims to control customers’ total electric consumption and utility’s load factor by using various load shaping techniques. However, applying load shaping techniques such as load shifting, peak clipping, or strategic conservation individually does not provide the desired level of improvement for load factor increment and/or customer’s bill reduction. In this paper, two load shaping techniques will be simulated as constrained optimization problems. The purpose is to reflect the application of combined load shifting and strategic conservation model together at the same time, and the application of combined load shifting and peak clipping model as well. The problem will be formulated and solved by using disciplined convex programming (CVX) based MATLAB® R2013b. Simulation results will be evaluated and compared for studying the most impactful multi-techniques model in improving load curve.

Keywords: convex programing, demand side management, load shaping, multiple, building energy optimization

Procedia PDF Downloads 313
8721 Developing a Total Quality Management Model Using Structural Equation Modeling for Indonesian Healthcare Industry

Authors: Jonny, T. Yuri M. Zagloel

Abstract:

This paper is made to present an Indonesian Healthcare model. Currently, there are nine TQM (Total Quality Management) practices in healthcare industry. However, these practices are not integrated yet. Therefore, this paper aims to integrate these practices as a model by using Structural Equation Modeling (SEM). After administering about 210 questionnaires to various stakeholders of this industry, a LISREL program was used to evaluate the model's fitness. The result confirmed that the model is fit because the p-value was about 0.45 or above required 0.05. This has signified that previously mentioned of nine TQM practices are able to be integrated as an Indonesian healthcare model.

Keywords: healthcare, total quality management (TQM), structural equation modeling (SEM), linear structural relations (LISREL)

Procedia PDF Downloads 292
8720 Familiarity with Engineering Project Management And Their Duties In Projects

Authors: Mokhtar Nikgoo

Abstract:

Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.

Keywords: project management, crisis management, project delays bill, project duration

Procedia PDF Downloads 57
8719 [Keynote Talk]: From Clinical Practice to Academic Setup, 'Quality Circles' for Quality Outputs in Both

Authors: Vandita Mishra

Abstract:

From the management of patients, reception, record, and assistants in a clinical practice; to the management of ongoing research, clinical cases and department profile in an academic setup, the healthcare provider has to deal with all of it. The victory lies in smooth running of the show in both the above situations with an apt solution of problems encountered and smooth management of crisis faced. Thus this paper amalgamates dental science with health administration by means of introduction of a concept for practice management and problem-solving called 'Quality Circles'. This concept uses various tools for problem solving given by experts from different fields. QC tools can be applied in both clinical and academic settings in dentistry for better productivity and for scientifically approaching the process of continuous improvement in both the categories. When approached through QC, our organization showed better patient outcomes and more patient satisfaction. Introduced in 1962 by Kaoru Ishikawa, this tool has been extensively applied in certain fields outside dentistry and healthcare. By exemplification of some clinical cases and virtual scenarios, the tools of Quality circles will be elaborated and discussed upon.

Keywords: academics, dentistry, healthcare, quality

Procedia PDF Downloads 101
8718 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 322
8717 Quality Management System Audit and Its Impact on Company's Performance

Authors: Redha Elhuni

Abstract:

The purpose of this paper is to find out the impact of Quality Management System (QMS) ISO/IEC 17025:2005 certification audit on company’s Performance. Libyan petroleum Institute has been certified ISO/IEC 17025:2005 for 8 years. Therefore, it is necessary to study and analyze the impact of that certification on its performance. Survey study has been done by distributing a questionnaire by handing it personally to qualified staff in the 15 accredited laboratories in the institute. The response rate was 66.6%. The statistical operations with the results of analytical study have been done to achieve the goal and objectives of the research. Finally, ISO/IEC 17025:2005 certification audit is found to have a positive effect on the institute’s performance.

Keywords: auditing process, ISO/IEC 17025:2005, quality management system, Libyan petroleum institute

Procedia PDF Downloads 354
8716 Framework for Incorporating Environmental Performance in Network-Level Pavement Maintenance Program

Authors: Jessica Achebe, Susan Tighe

Abstract:

The reduction of material consumption and greenhouse gas emission when maintain and rehabilitating road networks can achieve added benefits including improved life cycle performance of pavements, reduced climate change impacts and human health effect due to less air pollution, improved productivity due to an optimal allocation of resources and reduced road user cost. This is the essence of incorporating environmental sustainability into pavement management. The functionality of performance measurement approach has made it one of the most valuable tool to Pavement Management Systems (PMSs) to account for different criteria in the decision-making process. However measuring the environmental performance of road network is still a far-fetched practice in road network management, more so an ostensive agency-wide environmental sustainability or sustainable maintenance specifications is missing. To address this challenge, this present research focuses on the environmental sustainability performance of network-level pavement management. The ultimate goal is to develop a framework to incorporate environmental sustainability in pavement management systems for network-level maintenance programming. In order to achieve this goal, this paper present the first step, the intention is to review the previous studies that employed environmental performance measures, as well as the suitability of environmental performance indicators for the evaluation of the sustainability of network-level pavement maintenance strategies. Through an industry practice survey, this paper provides a brief forward regarding the pavement manager motivations and barriers to making more sustainable decisions, and data needed to support the network-level environmental sustainability. The trends in network-level sustainable pavement management are also presented, existing gaps are highlighted, and ideas are proposed for network-level sustainable maintenance and rehabilitation programming.

Keywords: pavement management, environment sustainability, network-level evaluation, performance measures

Procedia PDF Downloads 306
8715 The Human Resources Management for the Temple in Northeastern Thailand

Authors: Routsukol Sunalai

Abstract:

This research purpose is to study and compare the administration of Buddhist monks at northeastern Thailand. The samples used in the study are the priest in the Northeast by simple random sampling for 190 sampling. The tools used in this study is questioner were created in the 40 question items. The statistics used for data analysis were percentage, average, and standard deviation. The research found that the human resources management for the Buddhist monks as a whole is moderate. But it was found that the highest average is the policy followed by the management information. The Buddhist monks aged less than 25 years old with the overall difference was not significant. The priests who are less than 10 years in the monk experience and the priest has long held in the position for 10 years are not different in the significant level.

Keywords: employee job-related outcomes, ethical institutionalization, quality of work life, stock exchange of Thailand

Procedia PDF Downloads 209
8714 Management of Small-Scale Companies in Nigeria. Case Study of Problems Faced by Entrepreneurs

Authors: Aderemi, Moses Aderibigbe

Abstract:

The supply chain of a manufacturing company can be classified into three categories, namely: 1) supplier chain, these are a network of suppliers of raw materials, machinery, and other requirements for daily operations for the company; 2) internal chain, which are departmental or functional relationships within the organization like production, finance, marketing, logistic and quality control departments all interacting together to achieve the goals and objective of the company; and 3) customer chain; these are networks used for products distribution to the final consumer which includes the product distributors and retailers in the marketplace as may be applicable. In a developing country like Nigeria, where government infrastructures are poor or, in some cases, none in existence, the survival of a small-scale manufacturing company often depends on how effectively its supply chain is managed. In Nigeria, suppliers of machinery and raw materials to most manufacturing companies are from low-cost but high-tech countries like China or India. The problem with the supply chain from these countries apart from the language barrier between these countries and Nigeria, is also that of product quality and after-sales support services. The internal chain also requires funding to employ an experienced and trained workforce to deliver the company’s goals and objectives effectively and efficiently, which is always a challenge for small-scale manufacturers, including product marketing. In Nigeria, the management of the supply chain by small-scale manufacturers is further complicated by unfavourable government policies. This empirical research is a review and analysis of the supply chain management of a small-scale manufacturing company located in Lagos, Nigeria. The company's performance for the past five years has been on the decline and company management thinks there is a need for a review of its supply chain management for business survival. The company’s supply chain is analyzed and compared with best global practices in this research, and recommendations are made to the company management. The research outcome justifies the company’s need for a strategic change in its supply chain management for business sustainability and provides a learning point to small-scale manufacturing companies from developing countries in Africa

Keywords: management, small scale, supply chain, companies, leaders

Procedia PDF Downloads 23
8713 Management of Tibial Bone Defects Following Grade Three Injury in Adults

Authors: Rajendra Kumar Kanojia

Abstract:

Background; Massive bone gaps are common following road side accidents and injury to the tibia, specially open grade three fractures. It has been seen that the diaphyseal fractures in the tibia are prone to non-union, there are certain reasons known very well, like less soft tissues around the lower third tibia, less vascularity, less options of fixation of the fractures after trauma and prolonged surgical time, operation theatre time and special surgical means. Aim of study; To know the suitability of the ilizarov ring fixators in staged treatment of the fracture of the both bones leg, including tibia, we wish to see the role of ilizarov in management of open grade three fractures which have been operated and debrided, for getting the length use of ilizaorv ring in a tertiary canter is the aim of the study.

Keywords: open fracture, staged management, ilizarov, bone grafting, lengthening

Procedia PDF Downloads 306
8712 Social Network Analysis in Water Governance

Authors: Faribaebrahimi, Mehdi Ghorbani, Mohsen Mohsenisaravi

Abstract:

Ecosystem management is complex because of natural and human issues. To cope with this complexity water governance is recommended since it involves all stakeholders including people, governmental and non-governmental organization who related to environmental systems. Water governance emphasizes on water co-management through consideration of all the stakeholders in the form of social and organizational network. In this research, to illustrate indicators of water governance in Dorood watershed, in Shemiranat region of Iran, social network analysis had been applied. The results revealed that social cohesion among pastoralists in Dorood is medium because of trust links, while link sustainability is weak to medium. According to the results, some pastoralists have high social power and therefore are key actors in the utilization network, regarding to centrality index and trust links. The results also demonstrated that Agricultural Development Office and (Shemshak-Darbandsar Islamic) Council are key actors in rangeland co-management, based on centrality index in rangeland institutional network at regional scale in Shemiranat district.

Keywords: social network analysis, water governance, organizational network, water co-management

Procedia PDF Downloads 351
8711 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 247
8710 Complexity Leadership and Knowledge Management in Higher Education

Authors: Prabhakar Venugopal G.

Abstract:

Complex environments triggered by globalization have necessitated new paradigms of leadership – complexity leadership that encompasses multiple roles that leaders need to take upon. The success of higher education institutions depends on how well leaders can provide adaptive, administrative and enabling leadership. Complexity leadership seems all the more relevant for institutions that are knowledge-driven and thrive on knowledge creation, knowledge storage and retrieval, knowledge sharing and knowledge applications. In this paper are the elements of globalization, the opportunities and challenges that are brought forth by globalization are discussed. The complexity leadership paradigm in a knowledge-based economy and the need for such a paradigm shift for higher education institutions is presented. Further, the paper also discusses the support the leader requires in a knowledge-driven economy through knowledge management initiatives.

Keywords: globalization, complexity leadership, knowledge management

Procedia PDF Downloads 493
8709 Optimizing Coal Yard Management Using Discrete Event Simulation

Authors: Iqbal Felani

Abstract:

A Coal-Fired Power Plant has some integrated facilities to handle coal from three separated coal yards to eight units power plant’s bunker. But nowadays the facilities are not reliable enough for supporting the system. Management planned to invest some facilities to increase the reliability. They also had a plan to make single spesification of coal used all of the units, called Single Quality Coal (SQC). This simulation would compare before and after improvement with two scenarios i.e First In First Out (FIFO) and Last In First Out (LIFO). Some parameters like stay time, reorder point and safety stock is determined by the simulation. Discrete event simulation based software, Flexsim 5.0, is used to help the simulation. Based on the simulation, Single Quality Coal with FIFO scenario has the shortest staytime with 8.38 days.

Keywords: Coal Yard Management, Discrete event simulation First In First Out, Last In First Out.

Procedia PDF Downloads 671
8708 Customer Relationship Management - “Is It a Myth or a Reality in Indian Consumer Context”

Authors: Manish Manohar Hingorani

Abstract:

The purpose of the research is to find out the level of understanding, adoption, and implementation of CRM in Indian Businesses, either product/ service and the processes which should be followed to ensure minimal to no customer churn and further enhance loyalty. The study used comprehensive qualitative interviews of 36 respondents across mid and senior-level management in product and services organizations of Indian origin. The findings of the study exhibit a gap between the understanding, adoption and implementation of CRM in the Indian context. Different Industries have attributed different levels of understanding, adoption, and limited implementation studies on CRM to the Indian context exists in different industries, but studies related to the consequences of not understanding the true meaning of CRM at the grass root level and further than on non-adoption and non-implementation will have an adverse effect on the customer loyalty, and customer satisfaction leading to customer churn. As this was a qualitative approach, the analysis was content-based and discourse based. The responses were taken from mid to very-senior management decision-makers in organizations of Indian origin.

Keywords: customer relationship management, Indian consumer, customer loyalty, customer experience, customer satisfaction

Procedia PDF Downloads 95
8707 Design and Application of NFC-Based Identity and Access Management in Cloud Services

Authors: Shin-Jer Yang, Kai-Tai Yang

Abstract:

In response to a changing world and the fast growth of the Internet, more and more enterprises are replacing web-based services with cloud-based ones. Multi-tenancy technology is becoming more important especially with Software as a Service (SaaS). This in turn leads to a greater focus on the application of Identity and Access Management (IAM). Conventional Near-Field Communication (NFC) based verification relies on a computer browser and a card reader to access an NFC tag. This type of verification does not support mobile device login and user-based access management functions. This study designs an NFC-based third-party cloud identity and access management scheme (NFC-IAM) addressing this shortcoming. Data from simulation tests analyzed with Key Performance Indicators (KPIs) suggest that the NFC-IAM not only takes less time in identity identification but also cuts time by 80% in terms of two-factor authentication and improves verification accuracy to 99.9% or better. In functional performance analyses, NFC-IAM performed better in salability and portability. The NFC-IAM App (Application Software) and back-end system to be developed and deployed in mobile device are to support IAM features and also offers users a more user-friendly experience and stronger security protection. In the future, our NFC-IAM can be employed to different environments including identification for mobile payment systems, permission management for remote equipment monitoring, among other applications.

Keywords: cloud service, multi-tenancy, NFC, IAM, mobile device

Procedia PDF Downloads 435
8706 Information System Development for Online Journal System Using Online Journal System for Journal Management of Suan Sunandha Rajabhat University

Authors: Anuphan Suttimarn, Natcha Wattanaprapa, Suwaree Yordchim

Abstract:

The aim of this study is to develop the online journal system using a web application to manage the journal service of Suan Sunandha Rajabhat University in order to improve the journal management of the university. The main structures of the system process consist of 1. journal content management system 2. membership system of the journal and 3. online submission or review process. The investigators developed the system based on a web application using open source OJS software and phpMyAdmin to manage a research database. The system test showed that this online system 'Online Journal System (OJS)' could shorten the time in the period of submission article to journal and helped in managing a journal procedure efficiently and accurately. The quality evaluation of Suan Sunandha Rajabhat online journal system (SSRUOJS) undertaken by experts and researchers in 5 aspects; design, usability, security, reducing time, and accuracy showed the highest average value (X=4.30) on the aspect of reducing time. Meanwhile, the system efficiency evaluation was on an excellent level (X=4.13).

Keywords: online journal system, Journal management, Information system development, OJS

Procedia PDF Downloads 175
8705 Motivation for Work and Organizational Commitment in an Engineering Public Faculty: A Perception of Technical and Administrative Employees

Authors: Fátima Aparecida de Carvalho, Ester Eliane Jeunon

Abstract:

This study addresses issues in the public service: motivation to work and organizational commitment. The goal of this research was to examine how it configures the motivation to work and organizational commitment of the technical and administrative effective staff of the School of Engineering at UFMG. For this purpose a descriptive research under a quantitative and qualitative approach has been performed. In the quantitative research it has been applied a questionnaire to all 146 technical and administrative institution effective staff, that configures a census research. This questionnaire was divided into three parts, the first one aimed at performing a socio-demographic survey of participants, the second one aimed to measure motivation and the third one aimed at measuring organizational commitment. The Bases Organizational Commitment Scale (EBACO) was used in the analysis of data obtained in the third part of the questionnaire. The qualitative research was conducted through interviews with 08 managers, with open-ended questions structured in an analysis category, thus contemplating the administrative structure of the School of Engineering. The results of the research revealed that there is no relevant difference between the hygiene and motivational indices, related to the staff´s gender and area of work. Nonetheless, it was observed higher motivational indices for staff with shorter duration of employment in the institution. Also, the results shown high organizational commitment of the staff with the institution, with a predominance of the component “Requirement for performance”, followed by commitments “Consistent line of activity”, “Affiliative” and “Affective”, which reached almost tge some average in this study. Finally the results showed that all commitment indices have positive moderated correlation to the motivational indices, except the “shortage of alternative” index.

Keywords: motivation to work, organizational commitment, public service, human resources

Procedia PDF Downloads 410
8704 Management of Medical Equipment Maintenance

Authors: Gholamreza Madad

Abstract:

The role of medical equipment in modern advanced hospitals is irrefutable. Despite limited financial resources, developing countries have taken an uncontrollable manner to the purchase of complex and expensive equipment, although they have not taken good maintenance to keep these huge capitals. In our country, limited studies have indicated that the irregularities exist in the management of medical equipment maintenance. Research method: The research was done as a cross-sectional one, and in this study, a questionnaire was used to collect data in 10 hospitals. After distributing and collecting questionnaires in person, the collected data were analyzed using descriptive statistics and SPSS software. Research findings: According to the obtained results from the four dimensions of the management of medical equipment maintenance, only (maintenance planning) was in a moderate position and other components with a score of less than 50% were at a low level. There was a direct relationship between the total score of maintenance management and guidance points and coordination of medical equipment maintenance, and as well as the age of hospital managers. Discussion and conclusion: In sum, we can say that problems such as lack of skilled staff in medical engineering departments of hospitals, lack of funds and unaware of the authorities of medical engineering units to their duties have caused that the maintenance situation of medical equipment maintenance is in poor condition (near average). The low inexperience of the authorities of the unit has also contributed to this problem.

Keywords: equipment, maintenance, medical equipment, hospitals

Procedia PDF Downloads 162
8703 Building Information Management Advantages, Adaptation, and Challenges of Implementation in Kabul Metropolitan Area

Authors: Mohammad Rahim Rahimi, Yuji Hoshino

Abstract:

Building Information Management (BIM) at recent years has widespread consideration on the Architecture, Engineering and Construction (AEC). BIM has been bringing innovation in AEC industry and has the ability to improve the construction industry with high quality, reduction time and budget of project. Meanwhile, BIM support model and process in AEC industry, the process include the project time cycle, estimating, delivery and generally the way of management of project but not limited to those. This research carried the BIM advantages, adaptation and challenges of implementation in Kabul region. Capital Region Independence Development Authority (CRIDA) have responsibilities to implement the development projects in Kabul region. The method of study were considers on advantages and reasons of BIM performance in Afghanistan based on online survey and data. Besides that, five projects were studied, the reason of consideration were many times design revises and changes. Although, most of the projects had problems regard to designing and implementation stage, hence in canal project was discussed in detail with the main reason of problems. Which were many time changes and revises due to the lack of information, planning, and management. In addition, two projects based on BIM utilization in Japan were also discussed. The Shinsuizenji Station and Oita River dam projects. Those are implemented and implementing consequently according to the BIM requirements. The investigation focused on BIM usage, project implementation process. Eventually, the projects were the comparison with CRIDA and BIM utilization in Japan. The comparison will focus on the using of the model and the way of solving the problems based upon on the BIM. In conclusion, that BIM had the capacity to prevent many times design changes and revises. On behalf of achieving those objectives are required to focus on data management and sharing, BIM training and using new technology.

Keywords: construction information management, implementation and adaptation of BIM, project management, developing countries

Procedia PDF Downloads 129
8702 Water Crisis Management in a Tourism Dependent Community

Authors: Aishath Shakeela

Abstract:

At a global level, water stewardship, water stress and water security are crucial factors in tourism planning and development considerations. Challenges associated with water is of particular concern to the Maldives as there is limited availability of freshwater, high dependency on desalinated water, and high unit cost associated with desalinating water. While the Maldives is promoted as an example of sustainable tourism, a key sustainability challenge facing tourism dependent communities is the efficient use and management of available water resources. A water crisis event in the capital island of Maldives highlighted how precarious water related issues are in this tourism dependent destination. Applying netnography, the focus of this working paper is to present community perceptions of how government policies addressed Malé Water and Sewerage Company (MWSC) water crisis event.

Keywords: crisis management, government policies, Maldives, tourism, water

Procedia PDF Downloads 530
8701 Strategic Business Solutions for an Ageing SME

Authors: N. G. Teik Hiang, Fathyah Hashim

Abstract:

This is a case of how strategic management techniques can be used to help resolving problems faced by an ageing Small and Medium Enterprise (SME). Strategic way of resolving problems had been proven to be possible in this case despite general thought that strategic management is useful mostly for large corporations. Small and Medium Enterprises (SMEs) can also use strategic management in managing their business and determining their future cause of action and strategies in order to survive in this ever competent world. Strategic orientation is the key to survival and development of small and medium enterprises. In order to adapt to the fierce market competition, ageing SMEs should improve competitiveness and operational efficiency. They must therefore establish a sense of strategic management to improve the strategic management skills, combined with its own unique characteristics, and work out practical strategies to develop core competitiveness of enterprises in the fierce market competition in order to be sustainable. In this case, internal strengths and weaknesses of an SME had been identified. Strategic internal factors and external factors had been classified and further utilized to formulate potential strategies to encounter various problems faced by the SME. These strategies had been further match to take advantages of the opportunities and to overcome the weaknesses and minimize the threats it is facing. Tan, a consultant who was given the opportunity to formulate a plan for the business started with the environmental scanning (internal and external environmental analysis), assessing strengths and weaknesses for the company, strategies generation, analysis and evaluation. He had numerous discussions with the owner of the business and the senior management in order to match the key internal and external factors to formulate alternative strategies for solving the problems that the company facing. Some of the recommendations or solutions are generated from the inspiration of the owner of the business who is a very enterprising and experience businessman.

Keywords: strategic orientation, strategic management, SME, core competitiveness, sustainable

Procedia PDF Downloads 419