7511 Policies Promoting the Development of Green Buildings in Sub-Saharan Africa: A South African Case-Study
Authors: Peter Adekunle, Clinton Aigbavboa, Matthew Ikuabe, Opeoluwa Akinradewo
Abstract:
Contemporary building methods typically pay little attention to the built environment's greater economic, environmental, or social impacts or energy efficiency. Green construction aims to sever ties with these conventions. In order to provide better living and working conditions and lessen environmental consequences, green building today combines numerous building design, construction, and operation and maintenance approaches. As one of Sub-Saharan Africa's most industrialized nations, South Africa has a good number of green building projects. Therefore, this study examines the elements impacting the adoption of green buildings and regulations created to encourage the growth of green buildings using South Africa as a case study. The study has a survey-style design. A total of one hundred fifty (150) questionnaires were distributed to professionals in the construction industry in South Africa, of which one hundred and twenty-four (128) were returned and judged appropriate for investigation. The gathered data was examined using percentage, mean item scores, standard deviation, and Kruskal-Wallis. The findings show that cost and market circumstances are the two main elements impacting the adoption of green construction, while leadership advice is the most important policy. The study concluded that in order to encourage the construction of green buildings, additional Sub-Saharan nations should adopt these suggested policies.Keywords: green building, Sub-Saharan Africa, building design, environmental conditions
Procedia PDF Downloads 1117510 Genetic Algorithm Optimization of Multiple Resources for Multi-Projects
Authors: A. Samer Ezeldin, Sarah A. Fotouh
Abstract:
Optimization of resources is very important in all fields, as in construction management. Project managers have to face problems regarding management of cost, time and available resources of single projects and more problems arise when managing multiple projects. Most of the studies focused on optimization of resources for a single project, but, this paper will discuss the design and modeling of multiple resources optimization for multiple projects using Genetic Algorithm. Most of the companies in construction industry optimize the resources for single projects only, but with the presence of several mega projects in several developing countries running at the same time, there is a need for a model to enhance the efficiency of available resources and decreases the fluctuation as much as possible. The proposed model calculates the cost of each resource, tries to minimize the cost of extra resources as much as possible and generates the schedule of each project within a selected program.Keywords: construction management, genetic algorithm, multiple projects, multiple resources, optimization
Procedia PDF Downloads 4597509 PhD Research Design and Descriptive Theory: Theoretical Framework for Development of Integrated Management System
Authors: Samuel Quashie
Abstract:
The importance of theory for PhD construction management research cannot be underestimated, as it requires a sound theoretical basis. Theory efficiency reduces errors in the research problem, solving it by building upon current theory. Provides a structure for examination, enables the efficient development of the construction management field and to it practical real world problems. The aim is to develop the theoretical framework for the application of descriptive theory within the PhD research design To apply the proposed theoretical framework using the case of the topic of ‘integrated management system,’ classifying the phenomena into categories, explore the association between the category–defining attributes and the outcome observed. Forming categorization based upon attributes of phenomena (framework and typologies), and statement of association (models). Predicting (deductive process) and confirming (inductive process). The descriptive theory is important and provides a structure for examination, enables the efficient development of construction management field and to it practical real world problems. In conclusion, the work done in management presents fertile ground for research and theory development.Keywords: descriptive theory, PhD research design, theoretical framework, construction management
Procedia PDF Downloads 4267508 Traditional and New Residential Architecture in the Approach of Sustainability in the Countryside after the Earthquake
Authors: Zeynep Tanriverdi̇
Abstract:
Sustainable architecture is a design approach that provides healthy, comfortable, safe, clean space production as well as utilizes minimum resources for efficient and economical use of natural resources and energy. Traditional houses located in rural areas are sustainable structures built at the design and implementation stage in accordance with the climatic environmental data of the region and also effectively using natural energy resources. The fact that these structures are located in an earthquake geography like Türkiye brings their earthquake resistance to the agenda. Since the construction of these structures, which contain the architectural and technological cultural knowledge of the past, is shaped according to the characteristics of the regions where they are located, their resistance to earthquakes also differs. Analyses in rural areas after the earthquake show that there are light-damaged structures that can survive, severely damaged structures, and completely destroyed structures. In this regard, experts can implement repair, consolidation, and reconstruction applications, respectively. While simple repair interventions are carried out in accordance with the original data in traditional houses that have shown great resistance to earthquakes, reinforcement work blended with new technologies can be applied in damaged structures. In reconstruction work, a wide variety of applications can be seen with the possibilities of modern technologies. In rural areas experiencing earthquakes around the world, there are experimental new housing applications that are renewable, environmentally friendly, and sustainable with modern construction techniques in the light of scientific data. With these new residences, it is aimed to create earthquake-resistant, economical, healthy, and pain-relieving therapy spaces for people whose daily lives have been interrupted by disasters. In this study, the preservation of high earthquake-prone rural areas will be discussed through the knowledge transfer of traditional architecture and also permanent housing practices using new sustainable technologies to improve the area. In this way, it will be possible to keep losses to a minimum with sustainable, reliable applications prepared for the worst aspects of the disaster situation and to establish a link between the knowledge of the past and the new technologies of the future.Keywords: sustainability, conservation, traditional construction systems and materials, new technologies, earthquake resistance
Procedia PDF Downloads 657507 Real-Time Kinetic Analysis of Labor-Intensive Repetitive Tasks Using Depth-Sensing Camera
Authors: Sudip Subedi, Nipesh Pradhananga
Abstract:
The musculoskeletal disorders, also known as MSDs, are common in construction workers. MSDs include lower back injuries, knee injuries, spinal injuries, and joint injuries, among others. Since most construction tasks are still manual, construction workers often need to perform repetitive, labor-intensive tasks. And they need to stay in the same or an awkward posture for an extended time while performing such tasks. It induces significant stress to the joints and spines, increasing the risk of getting into MSDs. Manual monitoring of such tasks is virtually impossible with the handful of safety managers in a construction site. This paper proposes a methodology for performing kinetic analysis of the working postures while performing such tasks in real-time. Skeletal of different workers will be tracked using a depth-sensing camera while performing the task to create training data for identifying the best posture. For this, the kinetic analysis will be performed using a human musculoskeletal model in an open-source software system (OpenSim) to visualize the stress induced by essential joints. The “safe posture” inducing lowest stress on essential joints will be computed for different actions involved in the task. The identified “safe posture” will serve as a basis for real-time monitoring and identification of awkward and unsafe postural behaviors of construction workers. Besides, the temporal simulation will be carried out to find the associated long-term effect of repetitive exposure to such observed postures. This will help to create awareness in workers about potential future health hazards and encourage them to work safely. Furthermore, the collected individual data can then be used to provide need-based personalized training to the construction workers.Keywords: construction workers’ safety, depth sensing camera, human body kinetics, musculoskeletal disorders, real time monitoring, repetitive labor-intensive tasks
Procedia PDF Downloads 1307506 A Risk-Based Approach to Construction Management
Authors: Chloe E. Edwards, Yasaman Shahtaheri
Abstract:
Risk management plays a fundamental role in project planning and delivery. The purpose of incorporating risk management into project management practices is to identify and address uncertainties related to key project-related activities. The uncertainties, known as risk events, can relate to project deliverables that are quantifiable and are often measured by impact to project schedule, cost, or environmental impact. Risk management should be incorporated as an iterative practice throughout the planning, execution, and commissioning phases of a project. This paper specifically examines how risk management contributes to effective project planning and delivery through a case study of a transportation project. This case study focused solely on impacts to project schedule regarding three milestones: readiness for delivery, readiness for testing and commissioning, and completion of the facility. The case study followed the ISO 31000: Risk Management – Guidelines. The key factors that are outlined by these guidelines include understanding the scope and context of the project, conducting a risk assessment including identification, analysis, and evaluation, and lastly, risk treatment through mitigation measures. This process requires continuous consultation with subject matter experts and monitoring to iteratively update the risks accordingly. The risk identification process led to a total of fourteen risks related to design, permitting, construction, and commissioning. The analysis involved running 1,000 Monte Carlo simulations through @RISK 8.0 Industrial software to determine potential milestone completion dates based on the project baseline schedule. These dates include the best case, most likely case, and worst case to provide an estimated delay for each milestone. Evaluation of these results provided insight into which risks were the highest contributors to the projected milestone completion dates. Based on the analysis results, the risk management team was able to provide recommendations for mitigation measures to reduce the likelihood of risks occurring. The risk management team also provided recommendations for managing the identified risks and project activities moving forward to meet the most likely or best-case milestone completion dates.Keywords: construction management, monte carlo simulation, project delivery, risk assessment, transportation engineering
Procedia PDF Downloads 1077505 Looking Forward, Looking Back: A Critical Reflection on the Impact of the Special Needs Assistant Scheme on Inclusionary Practices for Children with Significant Care Needs in the Irish Education System
Authors: C. P. Griffin
Abstract:
This paper seeks to critically review special educational needs (SEN) policy in the Irish education system since the introduction of the Education Act in 1998. In particular, the author seeks to focus on the impact of SEN policy on inclusionary practices for children with significant care needs in light of the introduction on the Special Needs Assistant (SNA) scheme. Following a systematic review of the literature, the growth of the SNA scheme in Ireland will be critically reviewed. Strengths and weaknesses of the scheme will be forwarded and comparisons drawn between contrasting international models of teaching assistant support. Based on this review, avenues for future research will be forwarded, with the aim of supporting effective inclusionary practices for children with SEN based on evidence-based practice.Keywords: care needs, inclusion, Ireland, special needs assistants
Procedia PDF Downloads 2797504 Drought Resilient Water Supply for Livelihood: Establishment of Groundwater Treatment Plant at Construction Sites in Taichung City
Authors: Shang-Hsin Ou, Yang-Chun Lin, Ke-Hao Cheng
Abstract:
The year 2021 marked a historic drought in Taiwan, posing unprecedented challenges due to record-low rainfall and inadequate reservoir storage. The central region experienced water scarcity, leading to the implementation of "Groundwater Utilization at Construction Sites" for drought-resilient livelihood water supply. This study focuses on the establishment process of temporary groundwater treatment plants at construction sites in Taichung City, serving as a reference for future emergency response and the utilization of construction site groundwater. To identify suitable sites for groundwater reuse projects, site selection operations were carried out based on relevant water quality regulations and assessment principles. Subsequently, the planning and design of temporary water treatment plants were conducted, considering the water quality, quantity, and on-site conditions of groundwater wells associated with construction projects. The study consolidates the major water treatment facilities at each site and addresses encountered challenges during the establishment process. Practical insights gained from operating temporary groundwater treatment plants are presented, including improvements related to stable water quality, water quantity, equipment operation, and hydraulic control. In light of possible future droughts, this study provides an outlook and recommendations to expedite and improve the setup of groundwater treatment plants at construction sites. This includes considering on-site water abstraction, treatment, and distribution conditions. The study's results aim to offer practical guidelines for effectively establishing and managing such treatment plants, while offering experiences and recommendations for other regions facing similar emergencies, water shortages, and drought situations. These endeavors contribute to ensuring sustainable water supply for drought-resilient livelihoods and maintaining societal stability.Keywords: drought resilience, groundwater treatment, construction site, water supply
Procedia PDF Downloads 827503 Structural Optimization of Shell and Arched Structures
Authors: Mitchell Gohnert, Ryan Bradley
Abstract:
This paper reviews some fundamental concepts of structural optimization, which are based on the type of materials used in construction and the shape of the structure. The first step in structural optimization is to break down all internal forces in a structure into fundamental stresses, which are tensions and compressions. Knowing the stress patterns directs our selection of structural shapes and the most appropriate type of construction material. In our selection of materials, it is essential to understand all construction materials have flaws, or micro-cracks, which reduce the capacity of the material, especially when subjected to tensions. Because of material defects, many construction materials perform significantly better when subjected to compressive forces. Structures are also more efficient if bending moments are eliminated. Bending stresses produce high peak stresses at each face of the member, and therefore, substantially more material is required to resist bending. The shape of the structure also has a profound effect on stress levels. Stress may be reduced dramatically by simply changing the shape. Catenary, triangular and linear shapes are the fundamental structural forms to achieve optimal stress flow. If the natural flow of stress matches the shape of the structures, the most optimal shape is determined.Keywords: arches, economy of stresses, material strength, optimization, shells
Procedia PDF Downloads 1167502 The Impact of Innovations in Human Resource Practices, Innovation Capabilities and Competitive Advantage on Company Performance
Authors: Bita Kharazi
Abstract:
The purpose of this research was to investigate the impact of innovations in human resource practices, innovation capabilities, and competitive advantage on company performance. This research was applied in terms of purpose and in terms of method, it was descriptive research of correlation type. The statistical population of this research was all the employees of Zar Industrial and Research Group. The sampling method was available in this research, and Cochran's formula was used to determine the statistical sample size. A standard questionnaire was used to collect information in this research, and SPSS software and simultaneous regression statistical tests were used to analyze the data. Based on the findings of the present research, it was found that the components of creativity in human resource practices, innovation capability, and competitive advantage have a significant impact on the company's performance.Keywords: human resource management, innovation, competitive advantage, company performance
Procedia PDF Downloads 167501 Roller Compacting Concrete “RCC” in Dams
Authors: Orod Zarrin, Mohsen Ramezan Shirazi
Abstract:
Rehabilitation of dam components such as foundations, buttresses, spillways and overtopping protection require a wide range of construction and design methodologies. Geotechnical Engineering considerations play an important role in the design and construction of foundations of new dams. Much investigation is required to assess and evaluate the existing dams. The application of roller compacting concrete (RCC) has been accepted as a new method for constructing new dams or rehabilitating old ones. In the past 40 years there have been so many changes in the usage of RCC and now it is one of most satisfactory solutions of water and hydropower resource throughout the world. The considerations of rehabilitation and construction of dams might differ due to upstream reservoir and its influence on penetrating and dewatering of downstream, operations requirements and plant layout. One of the advantages of RCC is its rapid placement which allows the dam to be operated quickly. Unlike ordinary concrete it is a drier mix, and stiffs enough for compacting by vibratory rollers. This paper evaluates some different aspects of RCC and focuses on its preparation progress.Keywords: spillway, vibrating consistency, fly ash, water tightness, foundation
Procedia PDF Downloads 6057500 An Evaluation of Rational Approach to Management by Objectives in Construction Contracting Organisation
Authors: Zakir H. Shaik, Punam L. Vartak
Abstract:
Management By Objectives (MBO) is a management technique in which objectives of an organisation are conveyed to the employees to establish the individual goals. These objectives and goals are then monitored and assessed jointly by management and the employee time to time. This tool can be used for planning, monitoring as well as for performance appraisal. The success of an organisation is largely dependent on its’s Vision. Thus, it is of paramount importance to achieve the realm of vision through a mission which is well crafted within the organisation to address the objectives. The success of the mission depends upon how realistic and action oriented philosophical approach, an organisation caters to; and how the individual goals are set to track and meet the objectives. Thus, focused and passionate efforts of the team, assigned for the mission, are an absolute obligation for achieving the vision of any organisation. Any construction site is generally a controlled disorder having huge investments, resources and logistics involved. The Construction progression is time-consuming with many isolated as well as interconnected activities. Traditional MBO approach can be unsuccessful if planning and control is non-realistic and inflexible. Moreover, the Construction Industry is far behind understanding these concepts. It is important to address the employee engagement in defining and creating awareness to achieve the targets. Besides, current economic environment and competitive world demands refined management tools to achieve profit, growth and survival of the business. Therefore, the necessity of rational MBO becomes vital part towards the success of an organisation. This paper details about the philosophical assumptions to develop the grounded theory in lieu of achieving objectives through RATIONAL MBO approach in Construction Contracting Organisations. The goals and objectives of the Construction Contracting Organisations can be achieved efficiently by adopting this RATIONAL MBO approach, as those are based on realistic, logical and balanced assumptions.Keywords: growth, leadership, management by objectives, Management By Objectives (MBO), profit, rational
Procedia PDF Downloads 1537499 Sediment Transport Monitoring in the Port of Veracruz Expansion Project
Authors: Francisco Liaño-Carrera, José Isaac Ramírez-Macías, David Salas-Monreal, Mayra Lorena Riveron-Enzastiga, Marcos Rangel-Avalos, Adriana Andrea Roldán-Ubando
Abstract:
The construction of most coastal infrastructure developments around the world are usually made considering wave height, current velocities and river discharges; however, little effort has been paid to surveying sediment transport during dredging or the modification to currents outside the ports or marinas during and after the construction. This study shows a complete survey during the construction of one of the largest ports of the Gulf of Mexico. An anchored Acoustic Doppler Current Velocity profiler (ADCP), a towed ADCP and a combination of model outputs were used at the Veracruz port construction in order to describe the hourly sediment transport and current modifications in and out of the new port. Owing to the stability of the system the new port was construction inside Vergara Bay, a low wave energy system with a tidal range of up to 0.40 m. The results show a two-current system pattern within the bay. The north side of the bay has an anticyclonic gyre, while the southern part of the bay shows a cyclonic gyre. Sediment transport trajectories were made every hour using the anchored ADCP, a numerical model and the weekly data obtained from the towed ADCP within the entire bay. The sediment transport trajectories were carefully tracked since the bay is surrounded by coral reef structures which are sensitive to sedimentation rate and water turbidity. The survey shows that during dredging and rock input used to build the wave breaker sediments were locally added (< 2500 m2) and local currents disperse it in less than 4 h. While the river input located in the middle of the bay and the sewer system plant may add more than 10 times this amount during a rainy day or during the tourist season. Finally, the coastal line obtained seasonally with a drone suggests that the southern part of the bay has not been modified by the construction of the new port located in the northern part of the bay, owing to the two subsystem division of the bay.Keywords: Acoustic Doppler Current Profiler, construction around coral reefs, dredging, port construction, sediment transport monitoring,
Procedia PDF Downloads 2277498 A Case Study on Problems Originated from Critical Path Method Application in a Governmental Construction Project
Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali
Abstract:
In public construction projects, determining the contract period in the award phase is one of the most important factors. The contract period establishes the baseline for creating the cash flow curve and progress payment planning in the post-award phase. If overestimated, project duration causes losses for both the owner and the contractor. Therefore, it is essential to base construction project duration on reliable forecasting. In Turkey, schedules are usually built using the bar chart (Gantt) schedule, especially for governmental construction agencies. The usage of these schedules is limited for bidding purposes. Although the bar-chart schedule is useful in some cases, it lacks logical connections between activities; it would be harder to obtain the activities that have more effects than others on the project's total duration, especially in large complex projects. In this study, a construction schedule is prepared with Critical Path Method (CPM) that addresses the above-mentioned discrepancies. CPM is a simple and effective method that displays project time and critical paths, showing results of forward and backward calculations with considering the logic relationships between activities; it is a powerful tool for planning and managing all kinds of construction projects and is a very convenient method for the construction industry. CPM provides a much more useful and precise approach than traditional bar-chart diagrams that form the basis of construction planning and control. CPM has two main application utilities in the construction field; the first one is obtaining project duration, which is called an as-planned schedule that includes as-planned activity durations with relationships between subsequent activities. Another utility is during the project execution; each activity is tracked, and their durations are recorded in order to obtain as-built schedule, which is named as a black box of the project. The latter is more useful for delay analysis, and conflict resolutions. These features of CPM have been popular around the world. However, it has not been yet extensively used in Turkey. In this study, a real construction project is investigated as a case study; CPM-based scheduling is used for establishing both of as-built and as-planned schedules. Problems that emerged during the construction phase are identified and categorized. Subsequently, solutions are suggested. Two scenarios were considered. In the first scenario, project progress was monitored based as CPM was used to track and manage progress; this was carried out based on real-time data. In the second scenario, project progress was supposedly tracked based on the assumption that the Gantt chart was used. The S-curves of the two scenarios are plotted and interpreted. Comparing the results, possible faults of the latter scenario are highlighted, and solutions are suggested. The importance of CPM implementation has been emphasized and it has been proposed to make it mandatory for preparation of construction schedule based on CPM for public construction projects contracts.Keywords: as-built, case-study, critical path method, Turkish government sector projects
Procedia PDF Downloads 1197497 Simulating Lean and Green Correlation in Supply Chain Context
Authors: Rachid Benmoussa, Fatima Ezzahra Essaber, Roland De Guio, Fatima Zahra Ben Moussa
Abstract:
Implementing green practices in supply chain management is a complex task mainly because ecological, economical and operational goals are usually in conflict. Green practices might thus face companies’ reluctance because managers can consider its implementation obviously as a performance lean degradation. To implement lean and green practices successfully, companies need relevant decision-making tools to highlight the correlation between them. To contribute to this issue, this work tries to answer the following research question: How to use simulation to assess correlation (antagonism or convergence) between lean and green goals? To answer this question, we propose in this paper a based simulation process that measures correlation generally between two variables. So as to prove its relevance, a logistics academic case study is used to illustrate all its stages. It shows, as for example, that Lean goal 'Stock' and Green goal 'CO₂ emission' are not conceptually correlated (linearly).Keywords: simulation, lean, green, supply chain
Procedia PDF Downloads 5007496 Exploring the Formation of High School Students’ Science Identity: A Qualitative Study
Authors: Sitong. Chen, Bing Wei
Abstract:
As a sociocultural concept, identity has increasingly gained attention in educational research, and the notion of students’ science identity has been widely discussed in the field of science education. Science identity was proved to be a key indicator of students’ learning engagement, persistence, and career intentions in science-related and STEM fields. Thus, a great deal of educational effort has been made to promote students’ science identity in former studies. However, most of this research was focused on students’ identity development during undergraduate and graduate periods, except for a few studies exploring high school students’ identity formation. High school has been argued as a crucial period for promoting science identity. This study applied a qualitative method to explore how high school students have come to form their science identities in previous learning and living experiences. Semi-structured interviews were conducted with 8 newly enrolled undergraduate students majoring in science-related fields. As suggested by the narrative data from interviews, students’ formation of science identities was driven by their five interrelated experiences: growing self-recognition as a science person, achieving success in learning science, getting recognized by influential others, being interested in science subjects, and informal science experiences in various contexts. Specifically, students’ success and achievement in science learning could facilitate their interest in science subjects and others’ recognition. And their informal experiences could enhance their interest and performance in formal science learning. Furthermore, students’ success and interest in science, as well as recognition from others together, contribute to their self-recognition. Based on the results of this study, some practical implications were provided for science teachers and researchers in enhancing high school students’ science identities.Keywords: high school students, identity formation, learning experiences, living experiences, science identity
Procedia PDF Downloads 587495 Defining Human Resources “Bundles” and Its’ Correlation with Companies’ Financial Performances
Authors: Ivana Tadic, Snjezana Pivac
Abstract:
Although human resources are recognized as the crucial companies’ resources and their positive influence on companies’ performances has been confirmed through different researches, scientists are still debating it. In order to contribute this debate, this paper firstly discusses the most important human resource management elements and practices and its influence on companies’ success. Afterwards it defines human resource “bundles” – interrelated and internally consistent human resource practices, complementary to each other, or the most important human resource practices and elements regarding Croatian companies and its human resource management activities. Finally, the paper provides empirical results; more precisely it reveals the relation of the level of development of human resource management function (“bundles”) and companies’ financial performances (using profitability ratios, liquidity ratios, solvency ratios and a group of additional ratios related to employees’ indicators).Keywords: companies’ performances, human resource bundles, multivariate statistical analysis, marketing
Procedia PDF Downloads 4237494 Recycled Use of Solid Wastes in Building Material: A Review
Authors: Oriyomi M. Okeyinka, David A. Oloke, Jamal M. Khatib
Abstract:
Large quantities of solid wastes being generated worldwide from sources such as household, domestic, industrial, commercial and construction demolition activities, leads to environmental concerns. Utilization of these wastes in making building construction materials can reduce the magnitude of the associated problems. When these waste products are used in place of other conventional materials, natural resources and energy are preserved and expensive and/or potentially harmful waste disposal is avoided. Recycling which is regarded as the third most preferred waste disposal option, with its numerous environmental benefits, stand as a viable option to offset the environmental impact associated with the construction industry. This paper reviews the results of laboratory tests and important research findings, and the potential of using these wastes in building construction materials with focus on sustainable development. Research gaps, which includes; the need to develop standard mix design for solid waste based building materials; the need to develop energy efficient method of processing solid waste use in concrete; the need to study the actual behavior or performance of such building materials in practical application and the limited real life application of such building materials have also been identified. Therefore a research is being proposed to develop an environmentally friendly, lightweight building block from recycled waste paper, without the use of cement, and with properties suitable for use as walling unit. This proposed research intends to incorporate, laboratory experimentation and modeling to address the identified research gaps.Keywords: recycling, solid wastes, construction, building materials
Procedia PDF Downloads 3857493 Supply Chain Management Practices in Thailand Palm Oil Industry
Authors: Athirat Intajorn
Abstract:
According to the ASEAN free trade areas (AFTA), Thailand has applied the AFTA agreement for reducing tariffs and reflecting changes in business processes. The reflection of changes in agribusiness processes, in particular, has accumulated as production costs for producers. Palm Oil industry has become an important industry to Thailand economic. Thailand currently ranks the 3rd in the world for Crude Palm Oil CPO. Therefore, the scope of this paper presents a research framework to investigate the supply chain management practices in Thailand palm oil industry. This research is limit to literature review. And the proposed framework identifies the criteria of supply chain management for Thailand palm oil industry in order for linkage among entities within logistics management involving plantation, mill, collection port, refinery and cookie from the data utilization. The Supply Chain Management Practices in Thailand Palm Oil Industry framework has a somewhat different view due to the high complexity of agribusiness logistics management.Keywords: supply chain management, practice, palm oil industry, Thailand palm oil industry
Procedia PDF Downloads 3097492 The Regional Expression of New Rural Dwellings Design in Linhai, Zhejiang: A Case of New Rural Dwellings Design in Badie Village
Authors: Fan Zhang
Abstract:
In the process of urbanization in China, the new rural construction is in the ascendant, which is becoming more and more popular. Under the driving effect of rural urbanization, the house pattern and tectonic methods of traditional vernacular houses have shown great differences from the family structure and values of contemporary peasant families. Therefore, it is particularly important to find a prototype, form and strategy, to make a balance between the traditional memory and modern functional requirements. In order for research to combine the regional culture with modern life, under the situation of the current batch production of new rural residence, Badie village, in Linhai, Zhejiang province, is taken as the case. This paper aims to put forward a prototype which can not only meet the demand of modern life but also ensure the continuation of traditional culture and historical context for the new rural dwellings design. This research not only helps to extend the local context in the construction of the new site but also contributes to the fusion of old and new rural dwellings in the old site construction. Through the study and research of this case, the research methodology and results can be drawn as reference for the new rural construction in other areas.Keywords: badie village, design strategy, new rural dwellings, regional context, regional expression
Procedia PDF Downloads 2107491 The Role of Gender and Socio-Demographics Variables on Food Safety Perceptions of Lebanese University Students
Authors: Lara Hanna-Wakim, Carine El Sokhn
Abstract:
The perception of the consumer in food safety plays an important role in reducing the incidence of foodborne diseases. Studies show that young adults aged between 18 and 25 years are more prone to foodborne illnesses than adults because of their lack of food safety knowledge. The aim of this study was to measure the degree of university students' awareness in food safety, as well as to explore whether there is a relationship or not between the demographic characteristics of university students and their knowledge and practices. A valid questionnaire divided into three parts was distributed to 938 university students, aged between 18-25 years, living alone or with their parents, from different majors and years of study. The data collected was analyzed using the SPSS program. The total scores of the students surveyed were 47.95% on their food safety knowledge and 56.45% on their practices in the matter. The final score of the food safety perception of university students in both genders was 52.2%. Female students scored higher (63.14%) than male students (39.69%), and students majoring in health related fields (67.45%) scored higher than those majoring in areas not related to public health (49.21%). These results showed an overall low level of food safety perception of university students. Educational interventions are needed to improve their food safety knowledge and practices as they will be responsible for their own family one day.Keywords: food safety, gender, perception, practices, knowledge, lebanese university students
Procedia PDF Downloads 4777490 Sustainable Housing in Steel: Prospects for Future World of Developing Countries
Authors: Poorva Kulkarni
Abstract:
Developing countries are having significant additions to existing population of urban areas with loads of migrants from rural areas. There is a tremendous need to provide accommodation facility to cater to rapidly growing urban population. This leads to unprecedented growth in urban areas since the temporary shelters are constructed with any available material. Architecture in a broader sense serves to humanity in terms of making life of people happy and comfortable by providing comfortable shelters. It is also the need of the time for an architect to be extremely sensitive towards nature by providing design solution of human shelters with minimum impact on the environment. The sensitive approach towards designing of housing units and provision of comfortable and affordable housing units should go hand in hand for future growth of developing countries. Steel has proved itself a versatile material in terms of strength, uniformity and ease of operation and many such other advantages. Steel can be used as the most promising material for modern construction practices. The current research paper focuses on how effectively steel can be used probably in combination with other construction material to achieve the mentioned objectives for sustainable housing. The research available on sustainable housing in steel is studied along with few case studies of buildings with the efficient use of steel providing a solution with affordability and minimum harm to the environment. The research will conclude the effective solutions exploring possibilities of use of steel for sustainable housing units. The researcher shows how the use of steel in combination with other materials for human shelters can promote sustainable housing for community living which is the need of the time.Keywords: community living, steel, sustainable housing, urban area
Procedia PDF Downloads 2277489 Ranking the Factors That Influence the Construction Project Success: The Jordanian Perspective
Authors: Ghanim A. Bekr
Abstract:
Project success is what must be done for the project to be acceptable to the client, stakeholders and end-users who will be affected by the project. The study of project success and the critical success factors (CSFs) are the means adopted to improve the effectiveness of project. This research is conducted to make an attempt to identify which variables influence the success of project implementation. This study has selected, through an extensive literature review and interviews, (83) factors categorized in (7) groups that the questionnaire respondents were asked to score. The responses from 66 professionals with an average of 15 years of experience in different types of construction projects in Jordan were collected and analyzed using SPSS and most important factors for success for various success criteria are presented depending on the relative importance index to rank the categories. The research revealed the significant groups of factors are: Client related factors, Contractor’s related factors, Project Manager (PM) related factors, and Project management related factors. In addition the top ten sub factors are: Assertion of the client towards short time of the project, availability of skilled labor, Assertion of the client towards high level of the quality, capability of the client in taking risk, previous experience of the PM in similar projects, previous experience of the contractor in similar projects, decision making by the client/ the client’s representative at the right time, assertion of client towards low cost of project, experience in project management in previous projects, and flow of the information among parties. The results would be helpful to construction project professionals in taking proactive measures for successful completion of construction projects in Jordan.Keywords: construction projects, critical success factors, Jordan, project success
Procedia PDF Downloads 1627488 Practices of Entomophagy and Entomotherapy in Baranggay Alambijud, Argao and Baranggay Lusaran, Cebu City, Philippines
Authors: Jake Joshua C. Garces, Zandra O. Jarito, Leslie Ann T. Barriga, Froilen C. Domicelo, Nimfa R. Pansit
Abstract:
The study was conducted in order to discover the medicinal and edible potentialities of different insect species in Baranggay Alambijud, Argao and Baranggay Lusaran, Cebu City, Cebu. In order to identify these entomological practices, a survey was carried out by the researchers in these key sites. Fourteen key informants were obtained and these were identified with the aide of two sampling methods- snowball technique and purposive sampling. Open-ended questionnaires were employed in order to obtain authentic and significant information from the key informants. Results portrayed that in the practice of entomotherapy, two insects were used as medicine namely: migratory locust (Locusta migratoria manillensis) and honey bee (Apis dorsata); and two insect by-products were utilized namely: feces of cockroach (Periplaneta Americana) and honey. White grub (Cotinis nitida) and bee eggs were also documented to manifest edible capability and were thus utilized in the entomophagic practices. After applying thematic analysis, it was determined that the causative factors of their entomological practices include their limited educational attainment, their inability to access urban societies and the influence brought about by their family and community.Keywords: entomophagy, entomotherapy, entomology, key informants
Procedia PDF Downloads 3357487 Assembly Solution for Modular Buildings: Development of a Plug-In Self-Locking Device Designed for Light-Framed Structures
Authors: Laurence Picard, André Bégin-Drolet, Pierre Blanchet
Abstract:
The prefabricated construction industry has been operating in North America for several years now and differs from traditional construction by its much shorter project timelines, lower costs, and increased build quality. Faced with the global housing crisis, prefabrication should be the first choice for erecting buildings quickly and at a low cost. However, the reality is quite different; manufacturers focus their operations mainly on single-home construction. This is explained by the lack of a suitable and efficient assembly solution for erecting large-scale buildings. Indeed, it is difficult to maintain the coveted advantages of prefabrication with a laborious on-site assembly and a colossal load of additional operations such as the installation of fasteners and the internal finishing. In the desire to maximize the benefits of prefabrication and make it a smart choice even for large buildings, an automated connection solution is developed. The plug-in self-locking device was developed accordingly to the product design phases: on-site observations, the definition of the problem and product requirements, solution generation, prototyping, fabricating and testing.Keywords: assembly solution, automation, construction productivity, modular connection, modular buildings, plug-in device, self-lock mechanism
Procedia PDF Downloads 1687486 A Study on Exploring and Prioritizing Critical Risks in Construction Project Assessment
Authors: A. Swetha
Abstract:
This study aims to prioritize and explore critical risks in construction project assessment, employing the Weighted Average Index method and Principal Component Analysis (PCA). Through extensive literature review and expert interviews, project assessment risk factors were identified across Budget and Cost Management Risk, Schedule and Time Management Risk, Scope and Planning Risk, Safety and Regulatory Compliance Risk, Resource Management Risk, Communication and Stakeholder Management Risk, and Environmental and Sustainability Risk domains. A questionnaire was distributed to stakeholders involved in construction activities in Hyderabad, India, with 180 completed responses analyzed using the Weighted Average Index method to prioritize risk factors. Subsequently, PCA was used to understand relationships between these factors and uncover underlying patterns. Results highlighted dependencies on critical resources, inadequate risk assessment, cash flow constraints, and safety concerns as top priorities, while factors like currency exchange rate fluctuations and delayed information dissemination ranked lower but remained significant. These insights offer valuable guidance for stakeholders to mitigate risks effectively and enhance project outcomes. By adopting systematic risk assessment and management approaches, construction projects in Hyderabad and beyond can navigate challenges more efficiently, ensuring long-term viability and resilience.Keywords: construction project assessment risk factor, risk prioritization, weighted average index, principal component analysis, project risk factors
Procedia PDF Downloads 407485 'Pacta Sunt Servanda': Which Form of Contract to Use in the Construction Industry
Authors: Ahmed Stifi, Sascha Gentes
Abstract:
The contract in its simplest definition is an agreement involving parties with a number of documents which may be as little as a marriage contract involving two parties or as big as a contract of construction and operation of a nuclear power plant involving companies and stakeholders with hundreds or even thousands of documents. All parties in the construction industry, not only the contract experts, agree that the success of a project is linked primarily to the form of contract regulating the relationship between stakeholders of the project. Therefore it is essential for the construction industry to study, analyze and improve its contracts forms continuously. However, it should be mentioned that different contract forms are developed to suit the construction evolution in term of its machinery, materials and construction process. There exist some similarities in some clauses and variations in many of these forms depending upon the type of project, the kind of clients and more importantly the laws and regulations governing the transaction in the country where the project is carried out. This paper will discuss the most important forms of construction contracts starting from national level, intended to the contract form in Germany and moving on to the international level introducing FIDIC contracts and its different forms, some newly developed contracts forms namely the integrated form of agreement, the new engineering contract and the project alliance agreement. The result of the study shows that many of the contract’s paragraphs are similar and the main difference comes in the approach of the relationship between the parties. Is it based on co-operation and mutual trust, or in some cases a load of responsibility for a particular party which increases the problems and disputes that affects the success of the project negatively. Thus we can say that the form of the contract, that plays an essential role in the approach of the project management, which is ultimately the key factor for the success of the project. So we advise to use a form of contract, which enhance the mutual trust between the project parties, contribute to support the cooperation between them, distribute responsibility and risks on an equitable basis and build on the principle “win-win". In additional to the conventional role of the contract it should integrate all parties into one team to achieve the target value of the project.Keywords: contract, FIDIC, integrated form of agreement, new engineering contract, project alliance agreemen
Procedia PDF Downloads 3737484 Biodiversity Conservation Practices Among Indigenous Peoples in Caraga Region, Mindanao, Philippines
Authors: Milagros S. Salibad, Levita B. Grana
Abstract:
The presence and role of Indigenous Peoples residing in key biodiversity, protected, and watershed areas within the ancestral domain in the Caraga Region hold immense significance. This study aimed to determine the level of biodiversity conservation practices among the Mamanwas, Manobos, and Higaonons, and identify facilitating or hindering factors. Employing a mixed-method research design, 421 respondents participated through a researcher-made questionnaire. Focus group discussions, key informant interviews, researcher field notes, community immersions, and secondary sources were done. The three groups have demonstrated a high level of biodiversity conservation practices manifesting their commitment to conserving their natural resources and ecosystems. Evidently, selecting and cutting only mature trees for shelter and tribal usage, and preservation of large trees that harbor ancestors’ spirits and worship through rituals (Mambabaja). Each group exhibited unique environmental practices shaped by their distinct cultures, traditions, customary knowledge, and access to information. The Mamanwa practiced traditional hunting and gathering by using traps while Manobo practiced shifting cultivation to maintain soil fertility and biodiversity, and Higaonon managed forest resources through traditional forest management (establishment of sacred forests and conservation areas). Various facilitating and hindering factors influenced their conservation efforts. Their traditional knowledge and practices, partnership and collaboration, legal recognition and support, access to information, and biodiversity monitoring system facilitate practices. Insufficient government assistance, political and social issues, scarce financial support, inadequate policy enforcement, lack of livelihood opportunities, and land use conflicts hinder them. Monitoring the sustainability of IPs' local biodiversity conservation practices is essential as they contribute to conservation endeavors.Keywords: biodiversity, conservation, indigenous peoples, traditional knowledge
Procedia PDF Downloads 777483 Reclaiming Properties of Bituminous Concrete Using Cold Mix Design Technology
Authors: Pradeep Kumar, Shalinee Shukla
Abstract:
Pavement plays a vital role in the socio-economic development of a country. Bituminous roads construction with conventional paving grade bitumen obtained from hot mix plant creates pollution and involves emission of greenhouse gases, also the construction of pavements at very high temperature is not feasible or desirable for high rainfall and snowfall areas. This problem of overheating can be eliminated by the construction of pavements with the usage of emulsified cold mixes which will eliminate emissions and help in the reduction of fuel requirement at mixing plant, which leads to energy conservation. Cold mix is a mixture of unheated aggregate and emulsion or cutback and filler. The primary objective of this research is to assess the volumetric mix design parameters of recycled aggregates with cold mixing technology and also to assess the impact of additives on volumetric mix characteristics. In this present study, bituminous pavement materials are reclaimed using cold mix technology, and Marshall specimens are prepared with the help of slow setting type 2 (SS-2) cationic bitumen emulsion as a binder for recycled aggregates. This technique of road construction is more environmentally friendly and can be done in adverse weather conditions.Keywords: cold mixes, bitumen emulsion, recycled aggregates, volumetric properties
Procedia PDF Downloads 1377482 Ecotourism Adaptation Practices to Climate Change in the Context of Sustainable Management in Dana Biosphere Reserve, Jordan
Authors: Malek Jamaliah, Robert Powell
Abstract:
In spite of the influence of climate change on tourism destinations, particularly those rely heavily on natural resources, little attention paid to study the appropriate adaptation efforts to cope with, moderate and benefit from the impacts of climate change. The existing literature indicated that the research of climate change adaptation in the tourism and outdoor recreation field is at least 5-7 years behind other sectors such as water resources and agriculture. In Jordan, there are many observed changes in climate patterns such as higher temperatures, decreased precipitation and increased severity and frequency of drought. Dana Biosphere Reserve (DBR), the largest protected area and the major eco-tourism destination in Jordan, is facing climate change, which gradually degrading environment, shifting tourism seasons and changing livelihood and lifestyle of local communities. This study aims to assess climate change adaptation practices and policies used in DBR to cope with climate change related-risks. We conducted qualitative semi-structured interviews with key informants in DBR to assess climate change adaptation practices. Direct content analysis (or a priori content analysis) was used to determine the components and indicators of climate change adaptation. The results found that DBR has implemented a wide range of adaptation practices, including infrastructure development, diversification of tourism products, environmentally-friendly practices, visitor management, land use management, rainwater collection, environmental monitoring and research, environmental education and collaboration with stakeholders. These diverse practices implicitly and explicitly play an important role in coping with the social, economic and environmental impacts caused by climate change. Finally, this study demonstrated that climate change adaptation is closely related to sustainable management of eco-tourism.Keywords: climate change adaptation, dana biosphere reserve, ecotourism, sustainable management
Procedia PDF Downloads 511