4834 Development of Construction Cost Optimization System Using Genetic Algorithm Method

Authors: Hyeon-Seung Kim, Young-Hwan Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

The project budget at the planned stage might be changed by the insufficient government budget or the design change. There are many cases more especially in the case of a project performed for a long period of time. If the actual construction budget is insufficient comparing with the planned budget, the construction schedule should also be changed to match the changed budget. In that case, most project managers change the planned construction schedule by a heuristic approach without a reasonable consideration on the work priority. This study suggests an optimized methodology to modify the construction schedule according to the changed budget. The genetic algorithm was used to optimize the modified construction schedule within the changed budget. And a simulation system of construction cost histogram in accordance with the construction schedule was developed in the BIM (Building Information Modeling) environment.

Keywords: 5D, BIM, GA, cost optimization

Procedia PDF Downloads 588
4833 Framing Opposition to Nuclear Power: Case of Akkuyu Nuclear Power

Authors: Pinar Temocin

Abstract:

Although the Akkuyu nuclear power project has been in the planning the Akkuyu nuclear power plant in the Mersin Province of Southern Turkey, recent events have increased its visibility in the Turkish debate. The Fukushima accident, the 2010 nuclear deal with Russia followed by several consequent nuclear revelations of administrative deficiencies, and waste issues all spurted widespread protests across Turkey and have polarized the nation into two camps; supporters and detractors. Those who support a nuclear Turkey include energy entrepreneurs, local investors, and technical experts who are heavily involved in paving the way for the realization of a nuclear project. Civil society activists and environmentalists overwhelmingly oppose the nuclear program. This study focuses on the latter, analyzing how groups opposing nuclear power plants (NPPs) have framed the Akkuyu nuclear project as a dangerous, risky, disadvantageous, and irrational policy choice.

Keywords: nuclear energy, anti-nuclear movements, environmentalists, civil society, Turkey

Procedia PDF Downloads 366
4832 Project Stakeholders' Perceptions of Sustainability: A Case Example From the Turkish Construction Industry

Authors: F. Heyecan Giritli, Gizem Akgül

Abstract:

Because of the raising population of world; the need for houses, buildings and infrastructures are increasing rapidly. Energy and water consumption, waste production continues to increase. If this situation of resources continues, there will be a significant loss for next generations. Therefore, there are a lot of researches and solutions developed in the world. Also sustainability criteria are collected together by some countries to serve construction industry with certification systems. Sustainable building production process’s scope requires different path from traditional building production process. Moreover, the key objective of sustainable buildings is that the process includes whole life cycle duration. The process approaches from the decision of the project to the end of it; so the project team is needed from the beginning of the integrated project delivery model. Further more, by defining project team at the beginning of the project provides communication among the team members and defined problem solving and decision making methods. In this research includes the certification systems among the world to comprehend the head lines and assessment criteria. Therefore, it is understand that usually all green building criteria have the same contents. The aim of this research is to assess the sustainable project stakeholder’ perceptions in Turkish construction industry from the point of occupation, job title and years of experience. Therefore, a survey is made to assess the perceptions of each attendant. In Turkey, sustainability criteria are not clearly defined; on the other hand some regulations like waste management, energy efficiency are made by legal agencies. LEED certification system is the most popular system in Turkey that has attended and certificated. From the LEED official data, it’s understood that 308 project registered in Turkey. Therefore, LEED sustainability criteria are used in the survey. Head lines of LEED certification criteria; sustainable sites, water efficiency, energy and atmosphere, material and resources, indoor environmental quality, innovation and regional priority are indicated to assess the perceptions of survey participants. Moreover, only surveying of criteria are not enough; so the equipment, methods, risks and benefits also considered.

Keywords: LEED, sustainability, perceptions, stakeholders, construction, Turkey, risk, benefit

Procedia PDF Downloads 301
4831 Implementation of Video Education to Improve Patient’s Knowledge of Activating Emergency Medical System for Stroke Symptoms: Evidence- Based Practice Project on Inpatient Neurology Unit in the United States

Authors: V. Miller, T. Jariel, C. Cooper-Chadwick

Abstract:

Early treatment of stroke leads to higher survival and lower disability rates. Increasing knowledge to activate the emergency medical system for signs of stroke can improve outcomes for patients with stroke and decrease morbidity and mortality. Even though patients who get discharged from the hospital receive standard verbal and printed education, nearly 20% of them answer the question incorrectly when asked, “What will you do if you or someone you know have signs of stroke?” The main goal of this evidence-based project was to improve patients’ knowledge of what to do if they have signs of stroke. Evidence suggests that using video education in conjunction with verbal and printed education improves patient comprehension and retention. The percentage of patients who noted that they needed to call 911 for stroke symptoms increased from 80% to 87% in six months after project implementation. The results of this project demonstrate significant improvement in patients’ knowledge about the necessity of activation of emergency medical systems for stroke symptoms.

Keywords: emergency medical systems activation, evidence-based practice nursing, stroke education, video education

Procedia PDF Downloads 67
4830 Characteristics of Oak Mushroom Cultivar, Bambithyang Developed by Golden Seed Project

Authors: Yeongseon Jang, Rhim Ryoo, Young-Ae Park, Kang-Hyeon Ka, Donha Choi, Sung-Suk Lee

Abstract:

Lentinula edodes (Berk.) Pegler, oak mushroom, is one of the most largely produced mushrooms in the world. To increase the competitiveness of Korean oak mushroom, golden seed project is ongoing. In this project, we develop new oak mushroom varieties to increase its productivity, quality, disease resistance, and so on. Through the project, new oak mushroom cultivar, Bambithyang was developed by mono-mono hybridization method. The optimum temperature for mycelial growth was at 25°C on potato dextrose agar (PDA) media. For the mass production test, it was cultivated using sawdust media with sawdust block type for 100 days. The temperature for primordia formation and fruit body production was broad (between 11°C and 20°C) which is good for spring and fall. Each flush period lasted for 6-7 days and the highest fruit body production was recorded in the first flush. The fruiting is sporadic. The pileus was deep brown. Its diameter was 69.2 mm and width was 17.8 mm. The stipe was ivory. It was 14.7 mm thick and 54.7 mm long. We would continue to develop new varieties while increasing the market share of domestic spawn with this variety.

Keywords: Lentinula edodes, mono-mono hybridization, new cultivar, oak mushroom

Procedia PDF Downloads 346
4829 Building Information Modeling-Based Approach for Automatic Quantity Take-off and Cost Estimation

Authors: Lo Kar Yin, Law Ka Mei

Abstract:

Architectural, engineering, construction and operations (AECO) industry practitioners have been well adapting to the dynamic construction market from the fundamental training of its discipline. As further triggered by the pandemic since 2019, great steps are taken in virtual environment and the best collaboration is strived with project teams without boundaries. With adoption of Building Information Modeling-based approach and qualitative analysis, this paper is to review quantity take-off and cost estimation process through modeling techniques in liaison with suppliers, fabricators, subcontractors, contractors, designers, consultants and services providers in the construction industry value chain for automatic project cost budgeting, project cost control and cost evaluation on design options of in-situ reinforced-concrete construction and Modular Integrated Construction (MiC) at design stage, variation of works and cash flow/spending analysis at construction stage as far as practicable, with a view to sharing the findings for enhancing mutual trust and co-operation among AECO industry practitioners. It is to foster development through a common prototype of design and build project delivery method in NEC Engineering and Construction Contract (ECC) Options A and C.

Keywords: building information modeling, cost estimation, quantity take-off, modeling techniques

Procedia PDF Downloads 187
4828 Using Analytic Hierarchy Process as a Decision-Making Tool in Project Portfolio Management

Authors: Darius Danesh, Michael J. Ryan, Alireza Abbasi

Abstract:

Project Portfolio Management (PPM) is an essential component of an organisation’s strategic procedures, which requires attention of several factors to envisage a range of long-term outcomes to support strategic project portfolio decisions. To evaluate overall efficiency at the portfolio level, it is essential to identify the functionality of specific projects as well as to aggregate those findings in a mathematically meaningful manner that indicates the strategic significance of the associated projects at a number of levels of abstraction. PPM success is directly associated with the quality of decisions made and poor judgment increases portfolio costs. Hence, various Multi-Criteria Decision Making (MCDM) techniques have been designed and employed to support the decision-making functions. This paper reviews possible option to improve the decision-making outcomes in the organisational portfolio management processes using the Analytic Hierarchy Process (AHP) both from academic and practical perspectives and will examine the usability, certainty and quality of the technique. The results of the study will also provide insight into the technical risk associated with current decision-making model to underpin initiative tracking and strategic portfolio management.

Keywords: analytic hierarchy process, decision support systems, multi-criteria decision making, project portfolio management

Procedia PDF Downloads 321
4827 Role of Community Participation in Sustainability of Projects: A Multiple Case Study of Developmental Projects in Khyber Pakhtunkhwa, Pakistan

Authors: Sajid Ali Khan, Karim Ullah, Usman Ghani

Abstract:

Community participation is the collaboration of project beneficiaries; voluntarily or because of some incentives or persuasion agree to put effort and work with development projects. Sustainability of projects is the ability to maintain its services, operations, and other benefits during its anticipated time. This study investigated the dynamics of community participation and its contribution to the sustainability of projects. In multiple case-study designs with semi-structured questionnaires and interviews, this study analyzes community participation with the help of individual case analysis followed by cross-case analysis in the RAHA & CDLD developmental project. Finally, the study outcomes are linked with the specified literature in order to comprehend the phenomena. The findings of the study suggest an Analytical framework developed by the current study covering different barriers and enablers to community participation and its implications.

Keywords: community participation, enablers, barriers, project sustainability

Procedia PDF Downloads 247
4826 Linking Excellence in Biomedical Knowledge and Computational Intelligence Research for Personalized Management of Cardiovascular Diseases within Personal Health Care

Authors: T. Rocha, P. Carvalho, S. Paredes, J. Henriques, A. Bianchi, V. Traver, A. Martinez

Abstract:

The main goal of LINK project is to join competences in intelligent processing in order to create a research ecosystem to address two central scientific and technical challenges for personal health care (PHC) deployment: i) how to merge clinical evidence knowledge in computational decision support systems for PHC management and ii) how to provide achieve personalized services, i.e., solutions adapted to the specific user needs and characteristics. The final goal of one of the work packages (WP2), designated Sustainable Linking and Synergies for Excellence, is the definition, implementation and coordination of the necessary activities to create and to strengthen durable links between the LiNK partners. This work focuses on the strategy that has been followed to achieve the definition of the Research Tracks (RT), which will support a set of actions to be pursued along the LiNK project. These include common research activities, knowledge transfer among the researchers of the consortium, and PhD student and post-doc co-advisement. Moreover, the RTs will establish the basis for the definition of concepts and their evolution to project proposals.

Keywords: LiNK Twin European Project, personal health care, cardiovascular diseases, research tracks

Procedia PDF Downloads 216
4825 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price

Procedia PDF Downloads 565
4824 The Impact of Bim Technology on the Whole Process Cost Management of Civil Engineering Projects in Kenya

Authors: Nsimbe Allan

Abstract:

The study examines the impact of Building Information Modeling (BIM) on the cost management of engineering projects, focusing specifically on the Mombasa Port Area Development Project. The objective of this research venture is to determine the mechanisms through which Building Information Modeling (BIM) facilitates stakeholder collaboration, reduces construction-related expenses, and enhances the precision of cost estimation. Furthermore, the study investigates barriers to execution, assesses the impact on the project's transparency, and suggests approaches to maximize resource utilization. The study, selected for its practical significance and intricate nature, conducted a Systematic Literature Review (SLR) using credible databases, including ScienceDirect and IEEE Xplore. To constitute the diverse sample, 69 individuals, including project managers, cost estimators, and BIM administrators, were selected via stratified random sampling. The data were obtained using a mixed-methods approach, which prioritized ethical considerations. SPSS and Microsoft Excel were applied to the analysis. The research emphasizes the crucial role that project managers, architects, and engineers play in the decision-making process (47% of respondents). Furthermore, a significant improvement in cost estimation accuracy was reported by 70% of the participants. It was found that the implementation of BIM resulted in enhanced project visibility, which in turn optimized resource allocation and facilitated the process of budgeting. In brief, the study highlights the positive impacts of Building Information Modeling (BIM) on collaborative decision-making and cost estimation, addresses challenges related to implementation, and provides solutions for the efficient assimilation and understanding of BIM principles.

Keywords: cost management, resource utilization, stakeholder collaboration, project transparency

Procedia PDF Downloads 67
4823 Economic Factors Affecting Greenfield Petroleum Refinery and Petrochemical Projects in Africa

Authors: Daniel Muwooya

Abstract:

This paper analyses economic factors that have affected the competitiveness of petroleum refinery and petrochemical projects in sub-Saharan Africa in the past and continue to plague greenfield projects today. Traditional factors like plant sizing and complexity, low-capacity utilization, changing regulatory environment, and tighter product specifications have been important in the past. Additional factors include the development of excess refinery capacity in Asia and the growth of renewable sources of energy – especially for transportation. These factors create both challenges and opportunities for the development of greenfield refineries and petrochemical projects in areas of increased demand growth and new low-cost crude oil production – like sub-Saharan Africa. This paper evaluates the strategies available to project developers and host countries to address contemporary issues of energy transition and the apparent reduction of funds available for greenfield oil and gas projects. The paper also evaluates the structuring of greenfield refinery and petrochemical projects for limited recourse project finance bankability. The methodology of this paper includes analysis of current industry data, conference proceedings, academic papers, and academic books on the subjects of petroleum refinery economics, refinery financing, refinery operations, and project finance generally and specifically in the oil and gas industry; evaluation of expert opinions from journal articles; working papers from international bodies like the World Bank and the International Energy Agency; and experience from playing an active role in the development and financing of US$ 10 Billion greenfield oil development project in Uganda. The paper also applies the discounted cash flow modelling to illustrate the circumstances of an inland greenfield refinery project in Uganda. Greenfield refinery and petrochemical projects are still necessary in sub-Saharan Africa to, among other aspirations, support the transition from traditional sources of energy like biomass to such modern forms as liquefied petroleum gas. Project developers and host governments will be required to structure projects that support global climate change goals without occasioning undue delays to project execution.

Keywords: financing, refinery and petrochemical economics, Africa, project finance

Procedia PDF Downloads 59
4822 Manager-Sensitive Theological Curricula: Rethinking Pastoral Care for Christians in High Positions Based on a Namibian Case Study

Authors: Florence Matsveru

Abstract:

The 21st-century church in Africa is faced with a myriad of challenges, which need attention. One of those challenges is pastoral ministry to congregants in high positions. This paper is based on a Ph.D. study entitled, ‘Wellbeing and work performance of Christians in managerial positions: A Namibian case study’ conducted between 2015 and 2018. The study was conducted with 32 purposively selected Christians working in managerial positions in Ohangwena Region, Namibia. The study employed a mixed-methods approach, i.e., both qualitative (to get participants’ feelings and perceptions) and quantitative (to get proportions of the experiences and perceptions). The research process involved a questionnaire survey and interviews. The study revealed that Christians in managerial positions have both common and unique experiences in three spheres: the workplace, the family and the church. The experiences lead to physical, emotional, psychological, social and spiritual needs. The findings also showed that some of the expectations placed upon Christians in managerial positions in the church may be unrealistic, while at the same time this group of congregants want to use their work experiences for the benefit of the church. A worrying finding was that pastors are generally not well-trained for ministry to congregants in high positions. Since these were perceptions of the participants (some of whom were also pastors), the researcher went further to do a short internet survey of the curricula of a number of theological colleges in Southern Africa. This survey did not show any ‘manager-sensitive’ modules in the surveyed colleges. Theological education for pastors, especially in African theological institutions, seems to ignore the unique needs of congregants in high positions. This paper argues that the needs of Christians in high positions should be considered in pastoral care and that theological education is key in equipping pastors with the necessary knowledge and skills. This paper is, therefore, a call to theological institutions to include ministry to people in high positions in their curricula. Pastors who are already beyond theological school may find it helpful to attend or hold workshops that focus on congregants in high positions so that this kind of 'sheep' will find good pasture in the church. A paper of this nature helps to strengthen pastoral ministry and to enhance the relevance of theological education.

Keywords: Christian managers, theological curricula, pastoral care, African

Procedia PDF Downloads 131
4821 Energy Enterprise Information System for Strategic Decision-Making

Authors: Woosik Jang, Seung H. Han, Seung Won Baek, Chan Young Park

Abstract:

Natural gas (NG) is a local energy resource that exists in certain countries, and most NG producers operate within unstable governments. Moreover, about 90% of the liquefied natural gas (LNG) market is governed by a small number of international oil companies (IOCs) and national oil companies (NOCs), market entry of second movers is extremely limited. To overcome these barriers, project viability should be assessed based on limited information at the project screening perspective. However, there have been difficulties at the early stages of projects as follows: (1) What factors should be considered? (2) How many experts are needed to make a decision? and (3) How to make an optimal decision with limited information? To answer these questions, this research suggests a LNG project viability assessment model based on the Dempster-Shafer theory (DST). Total of 11 indices for the gas field analysis and 23 indices for the market environment analysis are identified that reflect unique characteristics of LNG industry. Moreover, the proposed model evaluates LNG projects based on questionnaire survey and it provides not only quantified results but also uncertainty level of results based on DST. Consequently, the proposed model as a systematic framework can support the decision-making process from the gas field projects using quantitative results, and it is developed to a stand-alone system to enhance the practical usability. It is expected to improve the decision-making quality and opportunity in LNG projects for enterprise through informed decision.

Keywords: project viability, LNG project, enterprise information system, Dempster-Shafer Theory, strategic decision-making

Procedia PDF Downloads 258
4820 Key Issues in Transfer Stage of BOT Project: Experience from China

Authors: Wang Liguang, Zhang Xueqing

Abstract:

The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.

Keywords: BOT project, key issues, transfer management, transfer stage

Procedia PDF Downloads 256
4819 Modeling and Simulating Productivity Loss Due to Project Changes

Authors: Robert Pellerin, Michel Gamache, Remi Trudeau, Nathalie Perrier

Abstract:

The context of large engineering projects is particularly favorable to the appearance of engineering changes and contractual modifications. These elements are potential causes for claims. In this paper, we investigate one of the critical components of the claim management process: the calculation of the impacts of changes in terms of losses of productivity due to the need to accelerate some project activities. When project changes are initiated, delays can arise. Indeed, project activities are often executed in fast-tracking in an attempt to respect the completion date. But the acceleration of project execution and the resulting rework can entail important costs as well as induce productivity losses. In the past, numerous methods have been proposed to quantify the duration of delays, the gains achieved by project acceleration, and the loss of productivity. The calculation related to those changes can be divided into two categories: direct cost and indirect cost. The direct cost is easily quantifiable as opposed to indirect costs which are rarely taken into account during the calculation of the cost of an engineering change or contract modification despite several research projects have been made on this subject. However, proposed models have not been accepted by companies yet, nor they have been accepted in court. Those models require extensive data and are often seen as too specific to be used for all projects. These techniques are also ignoring the resource constraints and the interdependencies between the causes of delays and the delays themselves. To resolve this issue, this research proposes a simulation model that mimics how major engineering changes or contract modifications are handled in large construction projects. The model replicates the use of overtime in a reactive scheduling mode in order to simulate the loss of productivity present when a project change occurs. Multiple tests were conducted to compare the results of the proposed simulation model with statistical analysis conducted by other researchers. Different scenarios were also conducted in order to determine the impact the number of activities, the time of occurrence of the change, the availability of resources, and the type of project changes on productivity loss. Our results demonstrate that the number of activities in the project is a critical variable influencing the productivity of a project. When changes occur, the presence of a large number of activities leads to a much lower productivity loss than a small number of activities. The speed of reducing productivity for 30-job projects is about 25 percent faster than the reduction speed for 120-job projects. The moment of occurrence of a change also shows a significant impact on productivity. Indeed, the sooner the change occurs, the lower the productivity of the labor force. The availability of resources also impacts the productivity of a project when a change is implemented. There is a higher loss of productivity when the amount of resources is restricted.

Keywords: engineering changes, indirect costs overtime, productivity, scheduling, simulation

Procedia PDF Downloads 238
4818 E-Management and Firm Performance: An Empirical Study in Tunisian Firms

Authors: Khlif Hamadi

Abstract:

The principal aim of our research is to analyze the impact of the adoption of e-management approach on the performance of Tunisian firms. The method of structural equation was adopted to conduct our exploratory and confirmatory analysis. The results arising from the questionnaire sent to 155 E-managers affirm that the adoption of e-management approach influences the performance of Tunisian firms. The results of the questionnaire show that e-management favors the deployment of ICT usage and contributes enormously to the performance of the modern enterprise. The theoretical and practical implications of the study, as well as directions for future research, are discussed.

Keywords: e-management, ICT Deployment, organizational performance, e-manager

Procedia PDF Downloads 342
4817 Benefits of Using Social Media and Collaborative Online Platforms in PBL

Authors: Susanna Graziano, Lydia Krstic Ward

Abstract:

The purpose of this presentation is to demonstrate the steps of using multimedia and collaborative platforms in project-based learning. The presentation will demonstrate the stages of the learning project with various components of independent and collaborative learning, where students research the topic, share information, prepare a survey, use social media (Facebook, Instagram, WhasApp) and collaborative platforms (wikispaces.com and Google docs) to collect, analyze and process data, then produce reports and logos to be displayed as a final product. At the beginning of the presentation participants will answer a questionnaire about project based learning and share their experience on using social media, real–world project work and collaborative learning. Using a PPP, the presentation will walk participants through the steps of a completed project where tertiary education students are involved in putting together a multimedia campaign for safe driving in Kuwait. The research component of the project entails taking a holistic view on the problem of the high death rate in traffic accidents. The final goal of the project is to lead students to raise public awareness about the importance of safe driving. The project steps involve using the social media and collaborative platforms for collecting data and sharing the required materials to be used in the final product – a display of written reports, slogans and videos, as well as oral presentations. The same structure can be used to organize a multimedia campaign focusing on other issues, whilst scaffolding on students’ ability to brainstorm, retrieve information, organize it and engage in collaborative/ cooperative learning whilst being immersed in content-based learning as well as in authentic tasks. More specifically, the project we carried out at Box Hill College was a real-world one and involved a multimedia Campaign for Safe Driving since reckless driving is one of the major problems in the country. The idea for the whole project started by a presentation given by a board member of the Kuwaiti Society for Traffic Safety who was invited to college and spoke about: • Driving laws in the country, • What causes car accidents, • Driving safety tips. The principal goal of this project was to let students consider problems of traffic in Kuwait from different points of view. They also had to address the number and causes of accidents, evaluate the effectiveness of the local traffic law in order to send a warning about the importance of safe driving and, finally, suggest ways of its improvement. Benefits included: • Engagement, • Autonomy, • Motivation, • Content knowledge, • Language mastery, • Enhanced critical thinking, • Increased metacognitive awareness, • Improved social skills, • Authentic experience.

Keywords: social media, online learning platforms, collaborative platforms, project based learning

Procedia PDF Downloads 425
4816 Creating Database and Building 3D Geological Models: A Case Study on Bac Ai Pumped Storage Hydropower Project

Authors: Nguyen Chi Quang, Nguyen Duong Tri Nguyen

Abstract:

This article is the first step to research and outline the structure of the geotechnical database in the geological survey of a power project; in the context of this report creating the database that has been carried out for the Bac Ai pumped storage hydropower project. For the purpose of providing a method of organizing and storing geological and topographic survey data and experimental results in a spatial database, the RockWorks software is used to bring optimal efficiency in the process of exploiting, using, and analyzing data in service of the design work in the power engineering consulting. Three-dimensional (3D) geotechnical models are created from the survey data: such as stratigraphy, lithology, porosity, etc. The results of the 3D geotechnical model in the case of Bac Ai pumped storage hydropower project include six closely stacked stratigraphic formations by Horizons method, whereas modeling of engineering geological parameters is performed by geostatistical methods. The accuracy and reliability assessments are tested through error statistics, empirical evaluation, and expert methods. The three-dimensional model analysis allows better visualization of volumetric calculations, excavation and backfilling of the lake area, tunneling of power pipelines, and calculation of on-site construction material reserves. In general, the application of engineering geological modeling makes the design work more intuitive and comprehensive, helping construction designers better identify and offer the most optimal design solutions for the project. The database always ensures the update and synchronization, as well as enables 3D modeling of geological and topographic data to integrate with the designed data according to the building information modeling. This is also the base platform for BIM & GIS integration.

Keywords: database, engineering geology, 3D Model, RockWorks, Bac Ai pumped storage hydropower project

Procedia PDF Downloads 167
4815 Entrepreneurship under the Effect of Information Technology

Authors: Mohammad Hadi Khorashadi Zadeh ‎

Abstract:

An entrepreneur is a manager or the owner of the commercial company that creates resources and money by risking and initiative. The Netpreneur is the capability to run an online business. It needs only the Connectivity. An Entrepreneur, as long as he has a service which the market demands can set up a feasible and viable trade with his Intellectual Capital as the principle input and the Connectivity Infrastructure as the only physical input. The internet is possibly the most significant revolution in science and technology that our generation could fantasize or imagine. It has introduced in various benefits to the society, culture, economics and politics. The entrepreneur is a premium member in the community. She/he provides services to the society and community including employment.

Keywords: entrepreneur, Netpreneur, intellectual capital, infrastructure

Procedia PDF Downloads 327
4814 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 242
4813 Building Information Management Advantages, Adaptation, and Challenges of Implementation in Kabul Metropolitan Area

Authors: Mohammad Rahim Rahimi, Yuji Hoshino

Abstract:

Building Information Management (BIM) at recent years has widespread consideration on the Architecture, Engineering and Construction (AEC). BIM has been bringing innovation in AEC industry and has the ability to improve the construction industry with high quality, reduction time and budget of project. Meanwhile, BIM support model and process in AEC industry, the process include the project time cycle, estimating, delivery and generally the way of management of project but not limited to those. This research carried the BIM advantages, adaptation and challenges of implementation in Kabul region. Capital Region Independence Development Authority (CRIDA) have responsibilities to implement the development projects in Kabul region. The method of study were considers on advantages and reasons of BIM performance in Afghanistan based on online survey and data. Besides that, five projects were studied, the reason of consideration were many times design revises and changes. Although, most of the projects had problems regard to designing and implementation stage, hence in canal project was discussed in detail with the main reason of problems. Which were many time changes and revises due to the lack of information, planning, and management. In addition, two projects based on BIM utilization in Japan were also discussed. The Shinsuizenji Station and Oita River dam projects. Those are implemented and implementing consequently according to the BIM requirements. The investigation focused on BIM usage, project implementation process. Eventually, the projects were the comparison with CRIDA and BIM utilization in Japan. The comparison will focus on the using of the model and the way of solving the problems based upon on the BIM. In conclusion, that BIM had the capacity to prevent many times design changes and revises. On behalf of achieving those objectives are required to focus on data management and sharing, BIM training and using new technology.

Keywords: construction information management, implementation and adaptation of BIM, project management, developing countries

Procedia PDF Downloads 129
4812 Enhancing Project Management Performance in Prefabricated Building Construction under Uncertainty: A Comprehensive Approach

Authors: Niyongabo Elyse

Abstract:

Prefabricated building construction is a pioneering approach that combines design, production, and assembly to attain energy efficiency, environmental sustainability, and economic feasibility. Despite continuous development in the industry in China, the low technical maturity of standardized design, factory production, and construction assembly introduces uncertainties affecting prefabricated component production and on-site assembly processes. This research focuses on enhancing project management performance under uncertainty to help enterprises navigate these challenges and optimize project resources. The study introduces a perspective on how uncertain factors influence the implementation of prefabricated building construction projects. It proposes a theoretical model considering project process management ability, adaptability to uncertain environments, and collaboration ability of project participants. The impact of uncertain factors is demonstrated through case studies and quantitative analysis, revealing constraints on implementation time, cost, quality, and safety. To address uncertainties in prefabricated component production scheduling, a fuzzy model is presented, expressing processing times in interval values. The model utilizes a cooperative co-evolution evolution algorithm (CCEA) to optimize scheduling, demonstrated through a real case study showcasing reduced project duration and minimized effects of processing time disturbances. Additionally, the research addresses on-site assembly construction scheduling, considering the relationship between task processing times and assigned resources. A multi-objective model with fuzzy activity durations is proposed, employing a hybrid cooperative co-evolution evolution algorithm (HCCEA) to optimize project scheduling. Results from real case studies indicate improved project performance in terms of duration, cost, and resilience to processing time delays and resource changes. The study also introduces a multistage dynamic process control model, utilizing IoT technology for real-time monitoring during component production and construction assembly. This approach dynamically adjusts schedules when constraints arise, leading to enhanced project management performance, as demonstrated in a real prefabricated housing project. Key contributions include a fuzzy prefabricated components production scheduling model, a multi-objective multi-mode resource-constrained construction project scheduling model with fuzzy activity durations, a multi-stage dynamic process control model, and a cooperative co-evolution evolution algorithm. The integrated mathematical model addresses the complexity of prefabricated building construction project management, providing a theoretical foundation for practical decision-making in the field.

Keywords: prefabricated construction, project management performance, uncertainty, fuzzy scheduling

Procedia PDF Downloads 50
4811 An Effective Approach to Knowledge Capture in Whole Life Costing in Constructions Project

Authors: Ndibarafinia Young Tobin, Simon Burnett

Abstract:

In spite of the benefits of implementing whole life costing technique as a valuable approach for comparing alternative building designs allowing operational cost benefits to be evaluated against any initial cost increases and also as part of procurement in the construction industry, its adoption has been relatively slow due to the lack of tangible evidence, ‘know-how’ skills and knowledge of the practice, i.e. the lack of professionals in many establishments with knowledge and training on the use of whole life costing technique, this situation is compounded by the absence of available data on whole life costing from relevant projects, lack of data collection mechanisms and so on. This has proved to be very challenging to those who showed some willingness to employ the technique in a construction project. The knowledge generated from a project can be considered as best practices learned on how to carry out tasks in a more efficient way, or some negative lessons learned which have led to losses and slowed down the progress of the project and performance. Knowledge management in whole life costing practice can enhance whole life costing analysis execution in a construction project, as lessons learned from one project can be carried on to future projects, resulting in continuous improvement, providing knowledge that can be used in the operation and maintenance phases of an assets life span. Purpose: The purpose of this paper is to report an effective approach which can be utilised in capturing knowledge in whole life costing practice in a construction project. Design/methodology/approach: An extensive literature review was first conducted on the concept of knowledge management and whole life costing. This was followed by a semi-structured interview to explore the existing and good practice knowledge management in whole life costing practice in a construction project. The data gathered from the semi-structured interview was analyzed using content analysis and used to structure an effective knowledge capturing approach. Findings: From the results obtained in the study, it shows that the practice of project review is the common method used in the capturing of knowledge and should be undertaken in an organized and accurate manner, and results should be presented in the form of instructions or in a checklist format, forming short and precise insights. The approach developed advised that irrespective of how effective the approach to knowledge capture, the absence of an environment for sharing knowledge, would render the approach ineffective. Open culture and resources are critical for providing a knowledge sharing setting, and leadership has to sustain whole life costing knowledge capture, giving full support for its implementation. The knowledge capturing approach has been evaluated by practitioners who are experts in the area of whole life costing practice. The results have indicated that the approach to knowledge capture is suitable and efficient.

Keywords: whole life costing, knowledge capture, project review, construction industry, knowledge management

Procedia PDF Downloads 260
4810 Survey of the Literacy by Radio Project as an Innovation in Literacy Promotion in Nigeria

Authors: Stella Chioma Nwizu

Abstract:

The National Commission for Adult and Non Formal Education (NMEC) in Nigeria is charged with the reduction of illiteracy rate through the development, monitoring, and supervision of literacy programmes in Nigeria. In spite of various efforts by NMEC to reduce illiteracy, literature still shows that the illiteracy rate is still high. According to NMEC/UNICEF, about 60 million Nigerians are non-literate, and nearly two thirds of them are women. This situation forced the government to search for innovative and better approaches to literacy promotion and delivery. The literacy by radio project was adopted as an innovative intervention to literacy delivery in Nigeria because the radio is the cheapest and most easily affordable medium for non-literates. The project aimed at widening access to literacy programmes for the non-literate marginalized and disadvantaged groups in Nigeria by taking literacy programmes to their door steps. The literacy by radio has worked perfectly well in non-literacy reduction in Cuba. This innovative intervention of literacy by radio is anchored on the diffusion of innovation theory by Rogers. The literacy by radio has been going on for fifteen years and the efficacy and contributions of this innovation need to be investigated. Thus, the purpose of this research is to review the contributions of the literacy by radio in Nigeria. The researcher adopted the survey research design for the study. The population for the study consisted of 2,706 participants and 47 facilitators of the literacy by radio programme in the 10 pilot states in Nigeria. A sample of four states made up of 302 participants and eight facilitators were used for the study. Information was collected through Focus Group Discussion (FGD), interviews and content analysis of official documents. The data were analysed qualitatively to review the contributions of literacy by radio project and determine the efficacy of this innovative approach in facilitating literacy in Nigeria. Results from the field experience showed, among others, that more non-literates have better access to literacy programmes through this innovative approach. The pilot project was 88% successful; not less than 2,110 adults were made literate through the literacy by radio project in 2017. However, lack of enthusiasm and commitment on the part of the technical committee and facilitators due to non-payment of honorarium, poor signals from radio stations, interruption of lectures with adverts, low community involvement in decision making in the project are challenges to the success rate of the project. The researcher acknowledges the need to customize all materials and broadcasts in all the dialects of the participants and the inclusion of more civil rights, environmental protection and agricultural skills into the project. The study recommends among others, improved and timely funding of the project by the Federal Government to enable NMEC to fulfill her obligations towards the greater success of the programme, setting up of independent radio stations for airing the programmes and proper monitoring and evaluation of the project by NMEC and State Agencies for greater effectiveness. In an era of the knowledge-driven economy, no one should be allowed to get saddled with the weight of illiteracy.

Keywords: innovative approach, literacy, project, radio, survey

Procedia PDF Downloads 65
4809 Development of Electric Generator and Water Purifier Cart

Authors: Luisito L. Lacatan, Gian Carlo J. Bergonia, Felipe C. Buado III, Gerald L. Gono, Ron Mark V. Ortil, Calvin A. Yap

Abstract:

This paper features the development of a Mobile Self-sustaining Electricity Generator for water distillation process with MCU- based wireless controller & indicator designed to solve the problem of scarcity of clean water. It is a fact that pure water is precious nowadays and its value is more precious to those who do not have or enjoy it. There are many water filtration products in existence today. However, none of these products fully satisfies the needs of families needing clean drinking water. All of the following products require either large sums of money or extensive maintenance, and some products do not even come with a guarantee of potable water. The proposed project was designed to alleviate the problem of scarcity of potable water in the country and part of the purpose was also to identify the problem or loopholes of the project such as the distance and speed required to produce electricity using a wheel and alternator, the required time for the heating element to heat up, the capacity of the battery to maintain the heat of the heating element and the time required for the boiler to produce a clean and potable water. The project has three parts. The first part included the researchers’ effort to plan every part of the project from the conversion of mechanical energy to electrical energy, from purifying water to potable drinking water to the controller and indicator of the project using microcontroller unit (MCU). This included identifying the problem encountered and any possible solution to prevent and avoid errors. Gathering and reviewing related studies about the project helped the researcher reduce and prevent any problems before they could be encountered. It also included the price and quantity of materials used to control the budget.

Keywords: mobile, self – sustaining, electricity generator, water distillation, wireless battery indicator, wireless water level indicator

Procedia PDF Downloads 310
4808 Project-Based Learning in Engineering Education

Authors: M. Greeshma, V. Ashvini, P. Jayarekha

Abstract:

Project based learning (PBL) is a student-driven educational framework and offers the student an opportunity for in-depth investigations of courses. This paper presents the need of PBL in engineering education for the student to graduate with a capacity to design and implement complex problems. The implementation strategy of PBL and its related challenges are presented. The case study that energizes the engineering curriculum with a relevance to the real-world of technology along with its benefits to the students is also included.

Keywords: PBL, engineering education, curriculum, implement complex

Procedia PDF Downloads 473
4807 Entrants’ Knowledge of the Host Country’s Institutional Environments: A Critical Success Factor of International Projects in Emerging Least Developed Countries

Authors: Rameshwar Dahal, S. Ping Ho

Abstract:

Although the demand for infrastructure development forms a promising market opportunity for international firms, the dominance of informal institutions over formal ones, investors are facing extraordinary institutional challenges when investing in emerging Least Developed Countries (LDCs). We believe that, in emerging LDCs, the project performance heavily depends on how well the entrants respond to the challenges exerted by the host institutional environments. Which primarily depends on how much they learn about the host institution and what strategy they apply in response. In Nepal, almost all international or global infrastructure projects are financed by international financers, so the procurement process of the infrastructure projects financed by foreign agencies is guided by the policies and regulations of the financer. Because of limited resources and the financers’ demand, contractors and consults are procured internationally. Moreover, the resources, including but not limited to construction material, manpower, and equipment, also need to be imported. Therefore, the involvement of international companies as an entrant in global infrastructure projects of LDCs is obvious. In a global project (GP), participants from different geographical and institutional environments hold different beliefs and have disparate interests. Therefore, the entrants face the challenges exerted by the host institutional environments. The entrants must either adapt to the institutions prevailing in the environment or resist the institutional pressures. It is hypothesized that, in emerging LDCs, the project performance heavily depends on how much the entrants learn about the host institutional knowledge and how well they respond to the institutional environments. While it is impossible to generalize the phenomenon and contextual conditions because of their vast diversity, this study has answered why and how participants’ level of institutional knowledge impacts the project's implementation performance. To draw that conclusion, firstly, we explored two typical GPs from Nepal. For this study, the data were collected by conducting interviews and examining the secondary data, such as the project reports published by the financers, project data provided by interviewees, and news reports. In an event analysis, firstly, we identify the sources, causes, or nature of the institutional challenges; secondly, we analyze the entrant’s responses to the exerted challenges and evaluate the impacts of the responses on the overall project performance. In this study, at first, the events occurred during the project implementation process have a causal link with the local institutions that demand the entrants’ response are extracted. Secondly, each event is scrutinized as the critical success factor of the case project. Finally, it is crucially examined whether and what institutional knowledge in these events played a critical role in project success or failure. The results also provide insights into the crucial institutional knowledge in LDCs and the subsequent strategy implications for undertaking projects in LDCs.

Keywords: emerging countries, LDC, project management, project performance, institutional knowledge, institutional theory

Procedia PDF Downloads 63
4806 The Planning Criteria of Block-Unit Redevelopment to Improve Residential Environment: Focused on Redevelopment Project in Seoul

Authors: Hong-Nam Choi, Hyeong-Wook Song, Sungwan Hong, Hong-Kyu Kim

Abstract:

In Korea, elements that decide the quality of residential environment are not only diverse, but show deviation as well. However, people do not consider these elements and instead, they try to settle the uniformed style of residential environment, which focuses on the construction development of apartment housing and business based plans. Recently, block-unit redevelopment is becoming the standout alternative plan of standardize redevelopment projects, but constructions become inefficient because of indefinite planning criteria. In conclusion, the following research is about analyzing and categorizing the development method and legal ground of redevelopment project district, plan determinant and applicable standard. The purpose of this study is to become a basis in compatible analysis of planning standards that will happen in the future.

Keywords: shape restrictions, improvement of regulation, diversity of residential environment, classification of redevelopment project, planning criteria of redevelopment, special architectural district (SAD)

Procedia PDF Downloads 484
4805 Integration of LCA and BIM for Sustainable Construction

Authors: Laura Álvarez Antón, Joaquín Díaz

Abstract:

The construction industry is turning towards sustainability. It is a well-known fact that sustainability is based on a balance between environmental, social and economic aspects. In order to achieve sustainability efficiently, these three criteria should be taken into account in the initial project phases, since that is when a project can be influenced most effectively. Thus the aim must be to integrate important tools like BIM and LCA at an early stage in order to make full use of their potential. With the synergies resulting from the integration of BIM and LCA, a wider approach to sustainability becomes possible, covering the three pillars of sustainability.

Keywords: building information modeling (BIM), construction industry, design phase, life cycle assessment (LCA), sustainability

Procedia PDF Downloads 451