7152 Risk Factors Affecting Construction Project Cost in Oman

Authors: Omar Amoudi, Latifa Al Brashdi

Abstract:

Construction projects are always subject to risks and uncertainties due to its unique and dynamic nature, outdoor work environment, the wide range of skills employed, various parties involved in addition to situation of construction business environment at large. Altogether, these risks and uncertainties affect projects objectives and lead to cost overruns, delay, and poor quality. Construction projects in Oman often experience cost overruns and delay. Managing these risks and reducing their impacts on construction cost requires firstly identifying these risks, and then analyzing their severity on project cost to obtain deep understanding about these risks. This in turn will assist construction managers in managing and tacking these risks. This paper aims to investigate the main risk factors that affect construction projects cost in the Sultanate of Oman. In order to achieve the main aim, literature review was carried out to identify the main risk factors affecting construction cost. Thirty-three risk factors were identified from the literature. Then, a questionnaire survey was designed and distributed among construction professionals (i.e., client, contractor and consultant) to obtain their opinion toward the probability of occurrence for each risk factor and its possible impact on construction project cost. The collected data was analyzed based on qualitative aspects and in several ways. The severity of each risk factor was obtained by multiplying the probability occurrence of a risk factor with its impact. The findings of this study reveal that the most significant risk factors that have high severity impact on construction project cost are: Change of Oil Price, Delay of Materials and Equipment Delivery, Changes in Laws and Regulations, Improper Budgeting, and Contingencies, Lack of Skilled Workforce and Personnel, Delays Caused by Contractor, Delays of Owner Payments, Delays Caused by Client, and Funding Risk. The results can be used as a basis for construction managers to make informed decisions and produce risk response procedures and strategies to tackle these risks and reduce their negative impacts on construction project cost.

Keywords: construction cost, construction projects, Oman, risk factors, risk management

Procedia PDF Downloads 345
7151 Rank of Semigroup: Generating Sets and Cases Revealing Limitations of the Concept of Independence

Authors: Zsolt Lipcsey, Sampson Marshal Imeh

Abstract:

We investigate a certain characterisation for rank of a semigroup by Howie and Ribeiro (1999), to ascertain the relevance of the concept of independence. There are cases where the concept of independence fails to be useful for this purpose. One would expect the basic element to be the maximal independent subset of a given semigroup. However, we construct examples for semigroups where finite basis exist and the basis is larger than the number of independent elements.

Keywords: generating sets, independent set, rank, cyclic semigroup, basis, commutative

Procedia PDF Downloads 189
7150 Strength Analysis of RCC Dams Subject to the Layer-by-Layer Construction Method

Authors: Archil Motsonelidze, Vitaly Dvalishvili

Abstract:

Existing roller compacted concrete (RCC) dams indicate that the layer-by-layer construction method gives considerable economies as compared with the conventional methods. RCC dams have also gained acceptance in the regions of high seismic activity. Earthquake resistance analysis of RCC gravity dams based on nonlinear finite element technique is presented. An elastic-plastic approach is used to describe the material of a dam while it is under static conditions (period of construction). Seismic force, as an acceleration equivalent to that produced by a real earthquake, is supposed to act when the dam is completed. The materials of the dam and foundation may be nonhomogeneous and anisotropic. The “dam-foundation” system is idealized as a plain strain problem.

Keywords: finite element method, layer-by-layer construction, RCC dams, strength analysis

Procedia PDF Downloads 549
7149 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 280
7148 The Way of the English Use of Businessmen for the ASEAN Economic Community in Chonburi Province

Authors: Kittivate Boonyopakorn

Abstract:

The purposes of this study were to investigate the method of the English use of the businessmen and to study their behavior of the utilization for the ASEAN economic community. The participants were divided into the three types of the merchants including the construction contractors, the construction material traders, and SME entrepreneurs. Survey questionnaires and interviews were used in this study. The findings showed that in the type of traders, 23 of the participants are construction contractors, 121 are construction material traders, and 206 are SME entrepreneurs. The study of English in language institute is highly 51.4%. The use of Google in translating English into Thai is 41.7%. Learning English themselves is 41.1% respectively. The businessmen study English for readiness for their trade.

Keywords: way of rnglish use, businessmen, ASEAN economic community, Chonburi province

Procedia PDF Downloads 241
7147 Green Housing Projects in Egypt: A Futuristic Approach

Authors: Shimaa Mahmoud Ali Ahmed, Boshra Tawfek El-Shreef

Abstract:

Sustainable development has become an important concern worldwide, and climate change has become a global threat. Some of these affect how we approach environmental issues — and how we should approach them. Environmental aspects have an important impact on the built environment, that’s why knowledge about Green Building and Green Construction become a vital dimension of urban sustainable development to face the challenges of climate change. There are several levels of green buildings, from energy-efficient lighting to 100% eco-friendly construction; the concept of green buildings in Egypt is still a rare occurrence, with the concept being relatively new to the market. There are several projects on the ground that currently employing sustainable and green solutions to some extent, some of them achieve a limit of success and others fail to employ the new solutions. The market and the cost as well, are great factors. From the last century, green architecture and environmental sustainability become a famous trend that all the researchers like to follow. Nowadays, the trend towards green has shifted to housing and real estate projects. While the environmental aspects are the key to achieve green buildings, the economic benefits, and the market forces are considered as big challenges. The paper assumes that some appropriate environmental treatments could be added to the applied prototype of the governmental social housing projects in Egypt to achieve better environmental solutions. The aim of the research is to get housing projects in Egypt closer to the track of sustainable and green buildings, through making a local future proposal to be integrated into the current policies. The proposed model is based upon adding some appropriate, cheap environmental modifications to the prototype of the Ministry of Housing, Infrastructure, and New Urban Communities. The research is based on an analytical, comparative analytical, and inductive approach to study and analyze the housing projects in Egypt and the possibilities of integrating green techniques into it.

Keywords: green buildings, urban sustainability, housing projects, sustainable development goals, Egypt 2030

Procedia PDF Downloads 137
7146 GIS Based Project Management Information System for Infrastructure Projects

Authors: Riki Panchal, Debasis Sarkar

Abstract:

This paper describes the work done for the GIS-based project management for different infrastructure projects. It is a review paper which gives the idea of the trends in the construction project management and various models adopted for the betterment of the project planning and execution. Traditional scheduling and progress control techniques such as bar charts and the critical path method fail to provide information pertaining to the spatial aspects of a construction project. An integrated system was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. Hence, it is suggested to work on the common platform from where all the data can be shared and analyzed.

Keywords: GIS, project management, integrated model, infrastructure project

Procedia PDF Downloads 519
7145 A Study on the Construction Process and Sustainable Renewal Development of High-Rise Residential Areas in Chongqing (1978-2023)

Authors: Xiaoting Jing, Ling Huang

Abstract:

After the reform and opening up, Chongqing has formed far more high-rise residential areas than other cities in its more than 40 years of urban construction. High-rise residential areas have become one of the main modern living models in Chongqing and an important carrier reflecting the city's high quality of life. Reviewing the construction process and renewal work helps understand the characteristics of high-rise residential areas in Chongqing at different stages, clarify current development demands, and look forward to the focus of future renewal work. Based on socio-economic development and policy background, the article sorts the construction process of high-rise residential areas in Chongqing into four stages: the early experimental construction period of high-rise residential areas (1978-1996), the rapid start-up period of high-rise commodity housing construction (1997-2006), the large-scale construction period of high-rise commodity housing and public rental housing (2007-2014), and the period of renewal and renovation of high-rise residential areas and step-by-step construction of quality commodity housing (2015-present). Based on the construction demands and main construction types of each stage, the article summarizes that the construction of high-rise residential areas in Chongqing features large scale, high speed, and high density. It points out that a large number of high-rise residential areas built after 2000 will become important objects of renewal and renovation in the future. Based on existing renewal work experience, it is urgent to explore a path for sustainable renewal and development in terms of policy mechanisms, digital supervision, and renewal and renovation models, leading the high-rise living in Chongqing toward high-quality development.

Keywords: high-rise residential areas, construction process, renewal and renovation, Chongqing

Procedia PDF Downloads 67
7144 Use of Concept Maps as a Tool for Evaluating Students' Understanding of Science

Authors: Aregamalage Sujeewa Vijayanthi Polgampala, Fang Huang

Abstract:

This study explores the genesis and development of concept mapping as a useful tool for science education and its effectiveness as technique for teaching and learning and evaluation for secondary science in schools and the role played by National College of Education science teachers. Concept maps, when carefully employed and executed serves as an integral part of teaching method and measure of effectiveness of teaching and tool for evaluation. Research has shown that science concept maps can have positive influence on student learning and motivation. The success of concept maps played in an instruction class depends on the type of theme selected, the development of learning outcomes, and the flexibility of instruction in providing library unit that is equipped with multimedia equipment where learners can interact. The study was restricted to 6 male and 9 female respondents' teachers in third-year internship pre service science teachers in Gampaha district Sri Lanka. Data were collected through 15 item questionnaire provided to learners and in depth interviews and class observations of 18 science classes. The two generated hypotheses for the study were rejected, while the results revealed that significant difference exists between factors influencing teachers' choice of concept maps, its usefulness and problems hindering the effectiveness of concept maps for teaching and learning process of secondary science in schools. It was examined that concept maps can be used as an effective measure to evaluate students understanding of concepts and misconceptions. Even the teacher trainees could not identify, key concept is on top, and subordinate concepts fall below. It is recommended that pre service science teacher trainees should be provided a thorough training using it as an evaluation instrument.

Keywords: concept maps, evaluation, learning science, misconceptions

Procedia PDF Downloads 274
7143 An Analysis of Prefabricated Construction Waste: A Case Study Approach

Authors: H. Hakim, C. Kibert, C. Fabre, S. Monadizadeh

Abstract:

Construction industry is an industry saddled with chronic problems of high waste generation. Waste management that is to ensure materials are utilized in an efficient manner would make a major contribution to mitigating the negative environmental impacts of construction waste including finite resources depletion and growing occupied landfill areas to name a few. Furthermore, ‘material resource efficiency’ has been found an economically smart approach specially when considered during the design phase. One effective strategy is to utilizing off-site construction process which includes a series of prefabricated systems such as mobile, modular, and HUD construction (Department of Housing and Urban Development manufactured buildings). These types of buildings are by nature material and resource-efficient. Despite conventional construction that is exposed to adverse weather conditions, manufactured construction production line is capable of creating repetitive units in a factory controlled environment. A factory can have several parallel projects underway with a high speed and in a timely manner which simplifies the storage of excess materials and re-allocating to the next projects. The literature reports that prefabricated construction significantly helps reduce errors, site theft, rework, and delayed problems and can ultimately lead to a considerable waste reduction. However, there is not sufficient data to quantify this reduction when it comes to a regular modular house in the U.S. Therefore, this manuscript aims to provide an analysis of waste originated from a manufactured factory trend. The analysis was made possible with several visits and data collection of Homes of Merits, a Florida Manufactured and Modular Homebuilder. The results quantify and verify a noticeable construction waste reduction.

Keywords: construction waste, modular construction, prefabricated buildings, waste management

Procedia PDF Downloads 267
7142 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia

Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid

Abstract:

The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.

Keywords: building, contractor, cost increase, cost overrun

Procedia PDF Downloads 156
7141 Circular Economy: Development of Quantitative Material Wastage Management Plan for Effective Waste Reduction in Building Construction Industry

Authors: Kwok Tak Kit

Abstract:

Combating climate change is becoming a hot topic in various sectors. Building construction and infrastructure sectors contributed a significant proportion of waste and GHGs emissions in the economy of different countries and cities. Many types of research had conducted and discussed the topic of waste management and waste management being a macro-level control is well developed in the building and construction industry. However, there is little research and studies on the micro-level of waste management, “building construction material wastage management,” and fewer reviews about regulatory control in the building construction sector. In this paper, we will focus on the potentialities and importance of material wastage management and review the deficiencies of the current standard to take into account the reduction of material wastage in a systematic and quantitative approach.

Keywords: quantitative measurement, material wastage management plan, waste management, uncalculated waste, circular economy

Procedia PDF Downloads 153
7140 A Comparative Study on the Impact of Global Warming of Applying Low Carbon Factor Concrete Products

Authors: Su-Hyun Cho, Chang-U Chae

Abstract:

Environmental impact assessment techniques have been developed as a result of the worldwide efforts to reduce the environmental impact of global warming. By using the quantification method in the construction industry, it is now possible to manage the greenhouse gas is to systematically evaluate the impact on the environment over the entire construction process. In particular, the proportion of greenhouse gas emissions at the production stage of construction material occupied is high, and efforts are needed in particular in the construction field. In this study, intended for concrete products for the construction materials, by using the LCA evaluation method, we compared the results of environmental impact assessment and carbon emissions of developing products that have been applied low-carbon technologies compared to existing products. As a results, by introducing a raw material of industrial waste, showed carbon reduction. Through a comparison of the carbon emission reduction effect of low-carbon technologies, it is intended to provide academic data for the evaluation of greenhouse gases in the construction sector and the development of low-carbon technologies of the future.

Keywords: CO₂ emissions, CO₂ reduction, ready-mixed concrete, environmental impact assessment

Procedia PDF Downloads 479
7139 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 242
7138 Towards an Intelligent Ontology Construction Cost Estimation System: Using BIM and New Rules of Measurement Techniques

Authors: F. H. Abanda, B. Kamsu-Foguem, J. H. M. Tah

Abstract:

Construction cost estimation is one of the most important aspects of construction project design. For generations, the process of cost estimating has been manual, time-consuming and error-prone. This has partly led to most cost estimates to be unclear and riddled with inaccuracies that at times lead to over- or under-estimation of construction cost. The development of standard set of measurement rules that are understandable by all those involved in a construction project, have not totally solved the challenges. Emerging Building Information Modelling (BIM) technologies can exploit standard measurement methods to automate cost estimation process and improves accuracies. This requires standard measurement methods to be structured in ontologically and machine readable format; so that BIM software packages can easily read them. Most standard measurement methods are still text-based in textbooks and require manual editing into tables or Spreadsheet during cost estimation. The aim of this study is to explore the development of an ontology based on New Rules of Measurement (NRM) commonly used in the UK for cost estimation. The methodology adopted is Methontology, one of the most widely used ontology engineering methodologies. The challenges in this exploratory study are also reported and recommendations for future studies proposed.

Keywords: BIM, construction projects, cost estimation, NRM, ontology

Procedia PDF Downloads 551
7137 Lack of BIM Training: Investigating Practical Solutions for the State of Kuwait

Authors: Noor M. Abdulfattah, Ahmed M. Khalafallah, Nabil A. Kartam

Abstract:

Despite the evident benefits of building information modeling (BIM) to the construction industry, it faces significant implementation challenges in the State of Kuwait. This study investigates the awareness of construction stakeholders of BIM implementation challenges, and identifies various solutions to overcome these challenges. Specifically, the main objectives of this study are to: (1) characterize the barriers that deter utilization of BIM, (2) examine the awareness of engineers, architects, and construction stakeholders of these barriers, and (3) identify practical solutions to facilitate BIM utilization. A questionnaire survey was designed to collect data on the aforementioned objectives from local companies and senior BIM experts. It was found that engineers are highly aware of BIM implementation barriers. In addition, it was concluded from the questionnaire that the biggest barrier is the lack of BIM training. Based on expert feedback, the study concluded with a number of recommendations on how to overcome the barriers of BIM utilization. This should prove useful to the construction industry stakeholders and can lead to significant changes to design and construction practices.

Keywords: building information modeling (BIM), construction, information technology, challenges

Procedia PDF Downloads 261
7136 The Diversity in the Concept of Existence from Kierkegaard to Sartre

Authors: Mohammad Motiee

Abstract:

From Kierkegaard to Sartre, the concept of 'being' was debated over various angles in the philosophy of being. Then, the futility, nothingness and absurdity of human condition in the world were all justified and led to a kind of solution by different approaches like Christianity, loss of faith, authentic existence and responsibility. In an extreme concern, the human condition in the world was pondered in different ways and the philosophy of thought tried to render an awareness of such condition for human beings. The present study aims at illustration of some approaches presented by prominent existentialists to justify the controversies in the concept of existence in human life.

Keywords: existence, existentialism, alienation, being

Procedia PDF Downloads 559
7135 Recycling Strategies of Construction Waste in Egypt

Authors: Hanan Anwar

Abstract:

All systems recycle. The construction industry has not only become a major consumer of natural materials along with a source of pollution. Environmental integrated production, reusing and recycling is of great importance in Egypt nowadays. Governments should ensure that the technical, environmental and economic feasibility of alternative systems is considered and is taken into account before construction starts. Hereby this paper focuses on the recycle of building materials as a way for environment protection and sustainable development. Environmental management integrates the requirements of sustainable development. There are many methods used to reduce waste and increase profits through salvage, reuse, and the recycling of construction waste. Sustainable development as a tool to continual improvement cycle processes innovations to save money.

Keywords: environment, management, reuse, recycling, sustainable development

Procedia PDF Downloads 314
7134 An Introduction to Critical Chain Project Management Methodology

Authors: Ranjini Ramanath, Nanjunda P. Swamy

Abstract:

Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.

Keywords: critical chain project management methodology, critical chain, project management, construction management

Procedia PDF Downloads 423
7133 The Impact of Artificial Intelligence on Construction Projects

Authors: Muller Salah Zaky Toudry

Abstract:

The complexity arises in defining the development great due to its notion, based on inherent market situations and their requirements, the diverse stakeholders itself and their desired output. An quantitative survey based totally approach was adopted in this optimistic examine. A questionnaire-primarily based survey was performed for the assessment of production fine belief and expectations within the context of excellent development technique. The survey feedback of experts of the leading creation corporations/companies of Pakistan production industry have been analyzed. The monetary ability, organizational shape, and production revel in of the construction companies shaped basis for their selection. The great belief become located to be venture-scope-orientated and taken into consideration as an extra cost for a production assignment. Any excellent improvement technique changed into expected to maximize the profit for the employer, via enhancing the productiveness in a creation project. The look at is beneficial for the construction specialists to evaluate the prevailing creation great perception and the expectations from implementation of any pleasant improvement approach in production projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety construction quality, expectation, improvement, perception client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 15
7132 Judicial Control in a Context of the Concept of Legal Policy of the Republic of Kazakhstan

Authors: G. A. Kuanaliyeva, G. T. Aigarinova, G. K. Shulanbekova

Abstract:

This article is devoted to judicial control in criminal legal proceedings of the Republic of Kazakhstan in the light of the new Concept of legal policy till 2020. In article the general characteristic and concept of judicial control, and also its signs and types are considered. Different views of scientists are analyzed. Foreign experiment on application of judicial control is given. The author states also the point sight on this problem and gives the definition to concept of judicial control. The code of criminal procedure of the Republic of Kazakhstan (RK Criminal Procedure Code) doesn't consolidate concept of judicial control. The author in article suggests making change and addition to the existing Code of criminal procedure of the Republic of Kazakhstan by definition of judicial control. The decree of the President of the Republic of Kazakhstan of August 24, 2009 No. 858 approved the Concept of legal policy of the Republic for the period from 2010 to 2020. The new Concept of legal policy of the Republic of Kazakhstan, defines prospects of development of national legal system of the country on the following decade. The concept of legal policy completely mentions also institute of judicial control. Since finding of the independence by Kazakhstan the set of laws, including the rights directed on providing, freedoms and a legitimate interest of citizens was accepted. Certainly, in any country, whatever democratic it was, there are problems to human rights. However, it is obvious that Kazakhstan strongly intends to guarantee all Republic of Kazakhstan proclaimed in the Constitution the rights and freedoms of the citizens. Our country seeks for creation of the constitutional state, tries to provide a guarantee from various arbitrariness in activity of competent government bodies, officials. In the concept of legal policy of the Republic of Kazakhstan it is specified: "...priority of development of the criminal procedure right there is a further consecutive realization of the fundamental principles of the criminal legal proceedings directed on protection of the rights and freedoms of the person". Judicial control just also is such guarantee.

Keywords: rights and freedoms of the person, concept, legal policy, court, judicial control

Procedia PDF Downloads 495
7131 Why and When to Teach Definitions: Necessary and Unnecessary Discontinuities Resulting from the Definition of Mathematical Concepts

Authors: Josephine Shamash, Stuart Smith

Abstract:

We examine reasons for introducing definitions in teaching mathematics in a number of different cases. We try to determine if, where, and when to provide a definition, and which definition to choose. We characterize different types of definitions and the different purposes we may have for formulating them, and detail examples of each type. Giving a definition at a certain stage can sometimes be detrimental to the development of the concept image. In such a case, it is advisable to delay the precise definition to a later stage. We describe two models, the 'successive approximation model', and the 'model of the extending definition' that fit such situations. Detailed examples that fit the different models are given based on material taken from a number of textbooks, and analysis of the way the concept is introduced, and where and how its definition is given. Our conclusions, based on this analysis, is that some of the definitions given may cause discontinuities in the learning sequence and constitute obstacles and unnecessary cognitive conflicts in the formation of the concept definition. However, in other cases, the discontinuity in passing from definition to definition actually serves a didactic purpose, is unavoidable for the mathematical evolution of the concept image, and is essential for students to deepen their understanding.

Keywords: concept image, mathematical definitions, mathematics education, mathematics teaching

Procedia PDF Downloads 129
7130 Linearization and Process Standardization of Construction Design Engineering Workflows

Authors: T. R. Sreeram, S. Natarajan, C. Jena

Abstract:

Civil engineering construction is a network of tasks involving varying degree of complexity and streamlining, and standardization is the only way to establish a systemic approach to design. While there are off the shelf tools such as AutoCAD that play a role in the realization of design, the repeatable process in which these tools are deployed often is ignored. The present paper addresses this challenge through a sustainable design process and effective standardizations at all stages in the design workflow. The same is demonstrated through a case study in the context of construction, and further improvement points are highlighted.

Keywords: syste, lean, value stream, process improvement

Procedia PDF Downloads 123
7129 Decommissioning of Nuclear Power Plants: The Current Position and Requirements

Authors: A. Stifi, S. Gentes

Abstract:

Undoubtedly from construction's perspective, the use of explosives will remove a large facility such as a 40-storey building , that took almost 3 to 4 years for construction, in few minutes. Usually, the reconstruction or decommissioning, the last phase of life cycle of any facility, is considered to be the shortest. However, this is proved to be wrong in the case of nuclear power plant. Statistics says that in the last 30 years, the construction of a nuclear power plant took an average time of 6 years whereas it is estimated that decommissioning of such plants may take even a decade or more. This paper is all about the decommissioning phase of a nuclear power plant which needs to be given more attention and encouragement from the research institutes as well as the nuclear industry. Currently, there are 437 nuclear power reactors in operation and 70 reactors in construction. With around 139 nuclear facilities already been shut down and are in different decommissioning stages and approximately 347 nuclear reactors will be in decommissioning phase in the next 20 years (assuming the operation time of a reactor as 40 years), This fact raises the following two questions (1) How far is the nuclear and construction Industry ready to face the challenges of decommissioning project? (2) What is required for a safety and reliable decommissioning project delivery? The decommissioning of nuclear facilities across the global have severe time and budget overruns. Largely the decommissioning processes are being executed by the force of manual labour where the change in regulations is respectively observed. In term of research and development, some research projects and activities are being carried out in this area, but the requirement seems to be much more. The near future of decommissioning shall be better through a sustainable development strategy where all stakeholders agree to implement innovative technologies especially for dismantling and decontamination processes and to deliever a reliable and safety decommissioning. The scope of technology transfer from other industries shall be explored. For example, remotery operated robotic technologies used in automobile and production industry to reduce time and improve effecincy and saftey shall be tried here. However, the innovative technologies are highly requested but they are alone not enough, the implementation of creative and innovative management methodologies should be also investigated and applied. Lean Management with it main concept "elimination of waste within process", is a suitable example here. Thus, the cooperation between international organisations and related industries and the knowledge-sharing may serve as a key factor for the successful decommissioning projects.

Keywords: decommissioning of nuclear facilities, innovative technology, innovative management, sustainable development

Procedia PDF Downloads 471
7128 The Porsche Pavilion in Wolfsburg, Germany

Authors: H. Pasternak, T. Krausche

Abstract:

The Porsche Pavilion is an innovative stainless steel construction using the principle, often used in ship and car design, as an advantage for building a light but stiff structure. The Pavilion is a one of a kind and outstanding construction that you can find. It fits right in the existing parts of the Autostadt within the lagoon landscape and was built in only eight months. With its curving lines and exiting bends the structure is an extraordinary work which was designed by Henn architects, Munich. The monocoque has a good balance between material and support structure. The stiffness is achieved by the upper and lower side sheathing plates and the intermediate formers. Also the roof shell has no joints and a smooth surface. The assembling of the structure requires a large time and effort cost due to many welds which are necessary to connect all section to one large shell.

Keywords: construction welding, exhibition building, light steel construction, monocoque

Procedia PDF Downloads 523
7127 Reliability Analysis of Construction Schedule Plan Based on Building Information Modelling

Authors: Lu Ren, You-Liang Fang, Yan-Gang Zhao

Abstract:

In recent years, the application of BIM (Building Information Modelling) to construction schedule plan has been the focus of more and more researchers. In order to assess the reasonable level of the BIM-based construction schedule plan, that is whether the schedule can be completed on time, some researchers have introduced reliability theory to evaluate. In the process of evaluation, the uncertain factors affecting the construction schedule plan are regarded as random variables, and probability distributions of the random variables are assumed to be normal distribution, which is determined using two parameters evaluated from the mean and standard deviation of statistical data. However, in practical engineering, most of the uncertain influence factors are not normal random variables. So the evaluation results of the construction schedule plan will be unreasonable under the assumption that probability distributions of random variables submitted to the normal distribution. Therefore, in order to get a more reasonable evaluation result, it is necessary to describe the distribution of random variables more comprehensively. For this purpose, cubic normal distribution is introduced in this paper to describe the distribution of arbitrary random variables, which is determined by the first four moments (mean, standard deviation, skewness and kurtosis). In this paper, building the BIM model firstly according to the design messages of the structure and making the construction schedule plan based on BIM, then the cubic normal distribution is used to describe the distribution of the random variables due to the collecting statistical data of the random factors influencing construction schedule plan. Next the reliability analysis of the construction schedule plan based on BIM can be carried out more reasonably. Finally, the more accurate evaluation results can be given providing reference for the implementation of the actual construction schedule plan. In the last part of this paper, the more efficiency and accuracy of the proposed methodology for the reliability analysis of the construction schedule plan based on BIM are conducted through practical engineering case.

Keywords: BIM, construction schedule plan, cubic normal distribution, reliability analysis

Procedia PDF Downloads 146
7126 Reaching New Levels: Using Systems Thinking to Analyse a Major Incident Investigation

Authors: Matthew J. I. Woolley, Gemma J. M. Read, Paul M. Salmon, Natassia Goode

Abstract:

The significance of high consequence, workplace failures within construction continues to resonate with a combined average of 12 fatal incidents occurring daily throughout Australia, the United Kingdom, and the United States. Within the Australian construction domain, more than 35 serious, compensable injury incidents are reported daily. These alarming figures, in conjunction with the continued occurrence of fatal and serious, occupational injury incidents globally suggest existing approaches to incident analysis may not be achieving required injury prevention outcomes. One reason may be that, incident analysis methods used in construction have not kept pace with advances in the field of safety science and are not uncovering the full range system-wide contributory factors that are required to achieve optimal levels of construction safety performance. Another reason underpinning this global issue may also be the absence of information surrounding the construction operating and project delivery system. For example, it is not clear who shares the responsibility for construction safety in different contexts. To respond to this issue, to the author’s best knowledge, a first of its kind, control structure model of the construction industry is presented and then used to analyse a fatal construction incident. The model was developed by applying and extending the Systems Theoretic and Incident Model and Process method to hierarchically represent the actors, constraints, feedback mechanisms, and relationships that are involved in managing construction safety performance. The Causal Analysis based on Systems Theory (CAST) method was then used to identify the control and feedback failures involved in the fatal incident. The conclusions from the Coronial investigation into the event are compared with the findings stemming from the CAST analysis. The CAST analysis highlighted additional issues across the construction system that were not identified in the coroner’s recommendations, suggested there is a potential benefit in applying a systems theory approach to incident analysis in construction. The findings demonstrate the utility applying systems theory-based methods to the analysis of construction incidents. Specifically, this study shows the utility of the construction control structure and the potential benefits for project leaders, construction entities, regulators, and construction clients in controlling construction performance.

Keywords: construction project management, construction performance, incident analysis, systems thinking

Procedia PDF Downloads 129
7125 Deviations and Defects of the Sub-Task’s Requirements in Construction Projects

Authors: Abdullah Almusharraf, Andrew Whyte

Abstract:

The sub-task pattern in terms of the deviations and defects should be identified and understand in order to improve the quality practices in construction projects. Therefore, the sub-task susceptibility to exposure to deviations and defects have been evaluated and classified via six classifications that have proposed in this study. 34 case studies on specific sub-task (from compression member in construction concrete structure) have been collected from seven construction projects in order to examined study’s classifications. The study revealed that the sub-task has high sensitive to deviation where (91%) of the cases recorded as deviations, however, only (19%) of cases recorded as defects. Another findings were that the actual work during the execution process has high source of deviation for this sub-task (74%) while only (26%) of the deviation source was due to both design documentations with the actual work. These findings significantly imply that it could be used the study’s classifications to determine the pattern of each sub-task and develop the proactive actions to overcome issues of the sub-task deviations and defects.

Keywords: sub-tasks, deviations, defects, quality, construction projects

Procedia PDF Downloads 444
7124 A Refinement Strategy Coupling Event-B and Planning Domain Definition Language (PDDL) for Planning Problems

Authors: Sabrine Ammar, Mohamed Tahar Bhiri

Abstract:

Automatic planning has a de facto standard language called Planning Domain Definition Language (PDDL) for describing planning problems. It aims to formalize the planning problems described by the concept of state space. PDDL-related dynamic analysis tools, namely planners and validators, are insufficient for verifying and validating PDDL descriptions. Indeed, these tools made it possible to detect errors a posteriori by means of test activity. In this paper, we recommend a formal approach coupling the two languages Event-B and PDDL, for automatic planning. Event-B is used for formal modeling by stepwise refinement with mathematical proofs of planning problems. Thus, this paper proposes a refinement strategy allowing to obtain reliable PDDL descriptions from an ultimate Event-B model correct by construction. The ultimate Event-B model, correct by construction which is supposed to be translatable into PDDL, is automatically translated into PDDL using our MDE Event-B2PDDL tool.

Keywords: code generation, event-b, PDDL, refinement strategy, translation rules

Procedia PDF Downloads 196
7123 A Concept Analysis of Self-Efficacy for Cancer Pain Management

Authors: Yi-Fung Lin, Yuan-Mei Liao

Abstract:

Background: Pain is common among patients with cancer and is also one of the most disturbing symptoms. As this suffering is subjective, if patients proactively participate in their pain self-management, pain could be alleviated effectively. However, not everyone can carry out self-management very well because human behavior is a product of the cognition process. In this process, we can see that "self-efficacy" plays an essential role in affecting human behaviors. Methods: We used the eight steps of concept analysis proposed by Walker and Avant to clarify the concept of “self-efficacy for cancer pain management.” A comprehensive literature review was conducted for relevant publications that were published during the period of 1977 to 2021. We used several keywords, including self-efficacy, self-management, concept analysis, conceptual framework, and cancer pain, to search the following databases: PubMed, CINAHL, Web of Science, and Embase. Results: We identified three defining attributes for the concept of self-efficacy for cancer pain management, including pain management abilities, confidence, and continuous pain monitoring, and recognized six skills related to pain management abilities: problem-solving, decision-making, resource utilization, forming partnerships between medical professionals and patients, planning actions, and self-regulation. Five antecedents for the concept of self-efficacy for cancer pain management were identified: pain experience, existing cancer pain, pain-related knowledge, a belief in pain management, and physical/mental state. Consequences related to self-efficacy for cancer pain management were achievement of pain self-management, well pain control, satisfying quality of life, and containing motivation. Conclusions: This analysis provides researchers with a clearer understanding of the concept of “self-efficacy for cancer pain management.” The findings presented here provide a foundation for future research and nursing interventions to enhance self-efficacy for cancer pain management.

Keywords: cancer pain, concept analysis, self-efficacy, self-management

Procedia PDF Downloads 70