Risk Pricing Related Abstracts

3 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Risk, Public Private Partnership (PPP), Risk Pricing, System Dynamics (SD), construction price

Procedia PDF Downloads 445
2 Impact of Exogenous Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

Many of Public Private Partnership (PPP) are developed based on a public project is to be awarded to a private party within a one contractual framework. PPP project risks typically include the development and construction of a new asset as well as its operation. Certainly the most severe consequences of risks through the construction period are price and time overruns. These events are among the most generally used situation in value for money analysis risks. The sources of risk change during the time in PPP project. In traditional procurement, the public sector usually has to cover all prices suffering from these risks. At least there is plenty to suggest that price suffering is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of exogenous risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Risk, Public Private Partnership (PPP), Risk Pricing, System Dynamics (SD)

Procedia PDF Downloads 409
1 Impact of Endogenous Risk Factors on Risk Cost in KSA PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The Public Private Partnership (PPP) contracts are produced taking into account the reason that the configuration, development, operation, and financing of an open undertaking is to be recompensed to a private gathering inside a solitary contractual structure. PPP venture dangers are ordinarily connected with the improvement and development of another resource and in addition its operation for a considerable length of time. Without a doubt, the most genuine outcomes of dangers amid the development period are value and time overwhelms. These occasions are amongst the most extensively utilized situations as a part of worth for cash investigation dangers. The wellsprings of danger change over the life cycle of a PPP venture. In customary acquirement, the general population segment ordinarily needs to cover all value trouble from these dangers. At any rate there is bounty confirmation to recommend that cost pain is a standard in a percentage of the tasks that are conveyed under customary obtainment. This paper means to research the effect of endogenous dangers on expense overwhelm in KSA PPP ventures. The paper displays a brief writing survey on PPP danger evaluating systems, and after that presents an affiliation model between danger occasions and expense invade in KSA. The paper finishes up with considerations for future examination.

Keywords: PPP, Risk Pricing, impact of risk, Endogenous risks

Procedia PDF Downloads 336