Construction Project Related Abstracts

11 Empirical Research on Preference for Conflict Resolution Styles of Owners and Contractors in China

Authors: Junqi Zhao, Yongqiang Chen

Abstract:

The preference for different conflict resolution styles are influenced by cultural background and power distance of two parties involving in conflict. This research put forward 7 hypotheses and tested the preference differences of the five conflict resolution styles between Chinese owner and contractor as well as the preference differences concerning the same style between two parties. The research sample includes 202 practitioners from construction enterprises in mainland China. Research result found that theories concerning conflict resolution styles could be applied in the Chinese construction industry. Some results of this research were not in line with former research, and this research also gave explanation to the differences from the characteristics of construction projects. Based on the findings, certain suggestions were made to serve as a guidance for managers to choose appropriate conflict resolution styles for a better handling of conflict.

Keywords: Conflict, Construction Project, Chinese owner and contractor, conflict resolution styles

Procedia PDF Downloads 338
10 Final Account Closing in Construction Project: The Use of Supply Chain Management to Reduce the Delays

Authors: Syuhaida Ismail, Zarabizan Zakaria, Aminah Md. Yusof

Abstract:

Project management process starts from the planning stage up to the stage of completion (handover of buildings, preparation of the final accounts and the closing balance). This process is not easy to implement efficiently and effectively. The issue of delays in construction is a major problem for construction projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This is due to several factors, such as environments of construction technology, sophisticated design and customer demands that are constantly changing and influencing, either directly or indirectly, the practice of management. Among the identified influences are physical environment, social environment, information environment, political and moral atmosphere. Therefore, this paper is emerged to determine the problem and issues in the final account closing in construction projects, and it establishes the need to embrace Supply Chain Management (SCM) and then elucidates the need and strategies for the development of a delay reduction framework. At the same time, this paper provides effective measures to avoid or at least reduce the delay to the optimum level. Allowing problems in the closure declaration to occur without proper monitoring and control can leave negative impact on the cost and time of delivery to the end user. Besides, it can also affect the reputation or image of the agency/department that manages the implementation of a contract and consequently may reduce customer's trust towards the agencies/departments. It is anticipated that the findings reported in this paper could address root delay contributors and apply SCM tools for their mitigation for the better development of construction project.

Keywords: Supply Chain Management, Construction Project, construction delay, final account closing

Procedia PDF Downloads 218
9 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U. A. E.

Authors: Firas Mohamad Al-Sabek

Abstract:

The Purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.

Keywords: Total Quality Management, Cost, Construction Project, management commitment, theoretical framework

Procedia PDF Downloads 302
8 Improving Cost and Time Control of Construction Projects Management Practices in Nigeria

Authors: Ahmed Usman, Mustapha Yakubu, Hashim Ambursa

Abstract:

This paper presents the findings of a research which sought to investigate techniques used to improve cost and time control of construction projects management practice in Nigeria. However, there is limited research on issues surrounding the practical usage of these techniques. Data were collected through a questionnaire distributed to construction experts through a survey conducted on the 100 construction organisations and 50 construction consultancy firms in the Nigeria aimed at identifying common project cost and time control practices and factors inhibiting effective project control in practice. The study reveals that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Keywords: Construction Project, Nigeria, cost control, time control

Procedia PDF Downloads 169
7 A Challenge to Conserve Moklen Ethnic House: Case Study in Tubpla Village, Phang Nga Province, Southern Thailand

Authors: H. Kobayashi, M. Attavanich

Abstract:

Moklen is a sub-group of ethnic minority in Thailand. In the past, they were vagabonds of the sea. Their livelihood relied on the sea but they built temporary shelters to avoid strong wind and waves during monsoon season. Recently, they have permanently settled on land along coastal area and mangrove forest in Phang Nga and Phuket Province, Southern Thailand. Moklen people have their own housing culture: the Moklen ethnic house was built from local natural materials, indicating a unique structure and design. Its wooden structure is joined by rattan ropes. The construction process is very unique because of using body-based unit of measurement for design and construction. However, there are several threats for those unique structures. One of the most important threats on Moklen ethnic house is tsunami. Especially the 2004 Indian Ocean Tsunami caused widely damage to Southern Thailand and Phang Nga province was the most affected area. In that time, Moklen villages which are located along the coastal area also affected calamitously. In order to recover the damage in affected villages, mostly new modern style houses were provided by aid agencies. This process has caused a significant impact on Moklen housing culture. Not only tsunami, but also modernization has an influence on the changing appearance of the Moklen houses and the effect of modernization has been started to experience before the tsunami. As a result, local construction knowledge is very limited nowadays because the number of elderly people in Moklen has been decreasing drastically. Last but not the least, restrictions of construction materials which are originally provided from accessible mangroves, create limitations in building a Moklen house. In particular, after the Reserved Forest Act, wood chopping without any permission has become illegal. These are some of the most important reasons for Moklen ethnic houses to disappear. Nevertheless, according to the results of field surveys done in 2013 in Phang Nga province, it is found out that some Moklen ethnic houses are still available in Tubpla Village, but only a few. Next survey in the same area in 2014 showed that number of Moklen houses in the village has been started to increase significantly. That proves that there is a high potential to conserve Moklen houses. Also the project of our research team in February 2014 contributed to continuation of Moklen ethnic house. With the cooperation of the village leader and our team, it was aimed to construct a Moklen house with the help of local participants. For the project, villagers revealed the building knowledge and techniques, and in the end, project helped community to understand the value of their houses. Also, it was a good opportunity for Moklen children to learn about their culture. In addition, NGOs recently have started to support ecotourism projects in the village. It not only helps to preserve a way of life, but also contributes to preserve indigenous knowledge and techniques of Moklen ethnic house. This kind of supporting activities are important for the conservation of Moklen ethnic houses.

Keywords: Conservation, Construction Project, Moklen Ethnic House

Procedia PDF Downloads 199
6 Applying the Underwriting Technique to Analyze and Mitigate the Credit Risks in Construction Project Management

Authors: Hai Chien Pham, Thi Phuong Anh Vo, Chansik Park

Abstract:

Risks management in construction projects is important to ensure the positive feasibility of the projects in which financial risks are most concerned while construction projects always run on a credit basis. Credit risks, therefore, require unique and technical tools to be well managed. Underwriting technique in credit risks, in its most basic sense, refers to the process of evaluating the risks and the potential exposure of losses. Risks analysis and underwriting are applied as a must in banks and financial institutions who are supporters for constructions projects when required. Recently, construction organizations, especially contractors, have recognized the significant increasing of credit risks which caused negative impacts to project performance and profit of construction firms. Despite the successful application of underwriting in banks and financial institutions for many years, there are few contractors who are applying this technique to analyze and mitigate the credit risks of their potential owners before signing contracts with them for delivering their performed services. Thus, contractors have taken credit risks during project implementation which might be not materialized due to the bankruptcy and/or protracted default made by their owners. With this regard, this study proposes a model using the underwriting technique for contractors to analyze and assess credit risks of their owners before making final decisions for the potential construction contracts. Contractor’s underwriters are able to analyze and evaluate the subjects such as owner, country, sector, payment terms, financial figures and their related concerns of the credit limit requests in details based on reliable information sources, and then input into the proposed model to have the Overall Assessment Score (OAS). The OAS is as a benchmark for the decision makers to grant the proper limits for the project. The proposed underwriting model is validated by 30 subjects in Asia Pacific region within 5 years to achieve their OAS, and then compare output OAS with their own practical performance in order to evaluate the potential of underwriting model for analyzing and assessing credit risks. The results revealed that the underwriting would be a powerful method to assist contractors in making precise decisions. The contribution of this research is to allow the contractors firstly to develop their own credit risk management model for proactively preventing the credit risks of construction projects and continuously improve and enhance the performance of this function during project implementation.

Keywords: Risk management, Construction Project, credit risk, underwriting technique

Procedia PDF Downloads 124
5 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. l. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: Uncertainty, Construction Project, distributions, project schedule

Procedia PDF Downloads 176
4 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: Leadership, Construction Project, project team, project successful

Procedia PDF Downloads 51
3 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: Planning, Construction Project, Critical Path, fuzzy network project

Procedia PDF Downloads 1
2 The Impact of Outsourcing Project Management Services on the Success of International Engineering, Procurement and Construction Projects

Authors: Majid Parchami Jalal, Parisa Amirtash

Abstract:

Purpose: Over recent decades, many construction projects have been developed all around the world. Another evolution is the development of international projects, which has led countries to collaborate regardless of geopolitical boundaries. This paper has focused on employing native project management consultant (NPMC) by the main foreign contractor in an international EPC (engineering, procurement, construction) project, to facilitate the relevant processes, promote the project success, and coordinate the operations and engineering services, from design to delivery. The study introduced the concept of NPMC and examined the impact of its services on the overall success of the project. Design/Methodology/Approach: Desk research carried out to examine the theoretical foundations of the study. A questionnaire survey has been done to achieve the opinions of construction experts for designing the proposed strategy to identify the characteristics and advantages of NPMC. Confirmatory factor investigation was conducted to verify the questionnaire validity, and structural equation modeling was also employed to measure the questionnaire reliability. Findings: A general positive impact of around 70% is achieved in the study. The following are different areas of project management (based on the Project Management Body of Knowledge), which are arranged in descending order of the positive impact they felt: 1. Stakeholder management; 2. Quality management; 3. Risk management; 4. Human resource management; 5. Procurement management; 6. Communication management; 7. Cost management; 8. Time management; 9. Scope management. Practical Implications: The paper includes suggestions for consultants to provide project management services to foreign contractors. For clients is to recommend employing NPMC to foreign contractors and for international contractors to engage NPMC in their international projects.

Keywords: Construction Project, international EPC project, main contractor, project management consultant

Procedia PDF Downloads 1
1 Analysing Construction Cost Estimation Factors as a Map

Authors: Kambiz Borna, Duaa Alshadli, Antoni Moore

Abstract:

For construction projects, different factors such as the type of project, material costs, project conditions and duration are combined to estimate the total project cost. Hence it is essential for the relationships between these factors to be well-defined in order to produce an accurate cost estimate of each stage of the project. The aim of this paper is to formulate and implement a Geographic Information System (GIS)-based approach that allows the user to properly quantify and visualize the relationship between these (non-spatial) factors in a virtual geospatial space, providing accurate cost estimates. To achieve this, Voronoi polygons are used in the developed method to transfer the duration and completion time of each project stage from one-dimensional data into a two-dimensional space (spatialisation). A sigmoidal shape is then utilised as a profile and scaled to convert the two-dimensional map into a three-dimensional map based on the material costs and difficulty of each activity. This provides a visualization tool that is similar to a topographic map. The generated maps are then compared to quantify and identify inconsistencies between duration, difficulty, and cost of each activity for a house-construction project. The results demonstrate the effectiveness of this method in identifying the best cost estimation scheme.

Keywords: GIS, Construction Project, cost estimation process, spatialisation