Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2

branch Related Abstracts

2 The Study of Effect the Number of Cluster in the Branch on Vegetative Characteristics of Pistacia vera

Authors: Seyeh Hassan Eftekhar Afzali, Hamid Mohammadi

Abstract:

Pistachio is like almond but the second cycle of growth (third phase) has rather fast growth. This is caused to add final mass of product. When the germ grows, it and its cover are reached to the final size during six week period. As starting the second phase, the lignifications of pericarp is begun and continued for 4 or 6 weeks. Physiological maturity or easy separation of green from scutum is specified. This test was done according to random blocks of 6 orchards in the type of Ahmad Aghaie with 4 iterations. Vegetative properties of branch are investigated. The results of the bunch numbers on the growth of branch in current year are shown that the most growth of branch is happened by trimming of one and two bunches of the branch and the most diameter of the branch is happened by trimming of one to four bunches of branch. Trimming of a bunch is caused the most number of pistachio products in the bunch.

Keywords: Cluster, Fruit, pistachio, bud, branch

Procedia PDF Downloads 326
1 The Constraint of Machine Breakdown after a Match up Scheduling of Paper Manufacturing Industry

Authors: John M. Ikome

Abstract:

In the process of manufacturing, a machine breakdown usually forces a modified flow shop out of the prescribed state, this strategy reschedules part of the initial schedule to match up with the pre-schedule at some point with the objective to create a schedule that is reliable with the other production planning decisions like material flow, production and suppliers by utilizing a critical decision-making concept. We propose a rescheduling strategy and a match-up point that will have a determination procedure through an advanced feedback control mechanism to increase both the schedule quality and stability. These approaches are compared with alternative re-scheduling methods under different experimental settings.

Keywords: Scheduling, Integrated, Heuristics, branch

Procedia PDF Downloads 252