C. E. Nugraheni and L. Abednego, A Combined Meta-Heuristic with Hyper-Heuristic Approach to Single Machine Production Scheduling Problem. journal = {International Journal of Computer and Information Engineering}, [online]. World Academy of Science, Engineering and Technology. July 2014, vol. 92(8). 1322 - 1326 [viewed 23 September 2024]. Available from: https://publications.waset.org/pdf/9998993.