%0 Journal Article %A C. E. Nugraheni and L. Abednego %D 2014 %J International Journal of Computer and Information Engineering %B World Academy of Science, Engineering and Technology %I Open Science Index 92, 2014 %T A Combined Meta-Heuristic with Hyper-Heuristic Approach to Single Machine Production Scheduling Problem %U https://publications.waset.org/pdf/9998993 %V 92 %X This paper is concerned with minimization of mean tardiness and flow time in a real single machine production scheduling problem. Two variants of genetic algorithm as metaheuristic are combined with hyper-heuristic approach are proposed to solve this problem. These methods are used to solve instances generated with real world data from a company. Encouraging results are reported. %P 1322 - 1326