WASET
	%0 Journal Article
	%A N. Manavizadeh and  A. Dehghani and  M. Rabbani
	%D 2011
	%J International Journal of Industrial and Manufacturing Engineering
	%B World Academy of Science, Engineering and Technology
	%I Open Science Index 57, 2011
	%T Mixed Model Assembly Line Sequencing In Make to Order System with Available to Promise Consideration
	%U https://publications.waset.org/pdf/9880
	%V 57
	%X Mixed model assembly lines (MMAL) are a type of
production line where a variety of product models similar in product
characteristics are assembled. The effective design of these lines
requires that schedule for assembling the different products is
determined. In this paper we tried to fit the sequencing problem with
the main characteristics of make to order (MTO) environment. The
problem solved in this paper is a multiple objective sequencing
problem in mixed model assembly lines sequencing using weighted
Sum Method (WSM) using GAMS software for small problem and
an effective GA for large scale problems because of the nature of
NP-hardness of our problem and vast time consume to find the
optimum solution in large problems. In this problem three practically
important objectives are minimizing: total utility work, keeping a
constant production rate variation, and minimizing earliness and
tardiness cost which consider the priority of each customer and
different due date which is a real situation in mixed model assembly
lines and it is the first time we consider different attribute to
prioritize the customers which help the company to reduce the cost of
earliness and tardiness. This mechanism is a way to apply an advance
available to promise (ATP) in mixed model assembly line sequencing
which is the main contribution of this paper.
	%P 1829 - 1837