WASET
	%0 Journal Article
	%A J. Šejnoha and  D. Jarušková and  O. Špačková and  E. Novotná
	%D 2009
	%J International Journal of Aerospace and Mechanical Engineering
	%B World Academy of Science, Engineering and Technology
	%I Open Science Index 34, 2009
	%T Risk Quantification for Tunnel Excavation Process
	%U https://publications.waset.org/pdf/2919
	%V 34
	%X Construction of tunnels is connected with high
uncertainty in the field of costs, construction period, safety and
impact on surroundings. Risk management became therefore a
common part of tunnel projects, especially after a set of fatal
collapses occurred in 1990's. Such collapses are caused usually by
combination of factors that can be divided into three main groups, i.e.
unfavourable geological conditions, failures in the design and
planning or failures in the execution.
This paper suggests a procedure enabling quantification of the
excavation risk related to extraordinary accidents using FTA and
ETA tools. It will elaborate on a common process of risk analysis and
enable the transfer of information and experience between particular
tunnel construction projects. Further, it gives a guide for designers,
management and other participants, how to deal with risk of such
accidents and how to make qualified decisions based on a
probabilistic approach.
	%P 1200 - 1208