	%T Time Compression in Engineer-to-Order Industry: A Case Study of a Norwegian Shipbuilding Industry
	%U https://publications.waset.org/pdf/10011687
	%V 168
	%X This paper aims to explore the possibility of time compression in Engineer to Order production networks. A case study research method is used in a Norwegian shipbuilding project by implementing a value stream mapping lean tool with total cycle time as a unit of analysis. The analysis resulted in demonstrating the time deviations for the planned tasks in one of the processes in the shipbuilding project. So, authors developed a future state map by removing time wastes from value stream process.

	%P 624 - 629