WASET
    Christian Böning and  Henrik Prinzhorn and  Eric C. Hund and  Malte Stonis,  A Memetic Algorithm for an Energy-Costs-Aware Flexible Job-Shop Scheduling Problem.   journal   = {International Journal of Industrial and Manufacturing Engineering}, [online]. World Academy of Science, Engineering and Technology.
    June 2017, vol. 125(5). 1294 - 1307
    [viewed 26 April 2024]. Available from: https://publications.waset.org/pdf/10007514.