WASET
	@article{(Open Science Index):https://publications.waset.org/pdf/10001842,
	  title     = {Value for Money in Investment Projects},
	  author    = {Jan Ceselsky},
	  country	= {},
	  institution	= {},
	  abstract     = {Construction and reconstruction of settlements and
individual municipalities, environmental management and the
creation, deployment of the forces of production and building
transport and technical equipment requires a large expenditure of
material and human resources. That is why the economic aspects of
the majority decision in these planes built in the foreground and are
often decisive. Thereby but more serious is that the economic aspects
of the settlement, the creation and function remain in their whole,
unprocessed, and cannot speak of a set of individual techniques and
methods traditional indicators and experiments with new approaches.
This is true both at the level of the national economy, and in their
own urban designs. Still a few remain identified specific economic
shaping patterns of settlement and the less it is possible to speak of
their control. Also practical assessing economics of specific solutions
are often used non-apt indicators in addition to economics usually
identifies with the lowest acquisition cost or high-intensity land use
with little regard for functional efficiency and little studied much
higher operating and maintenance costs".},
	    journal   = {International Journal of Economics and Management Engineering},
	  volume    = {9},
	  number    = {8},
	  year      = {2015},
	  pages     = {2721 - 2724},
	  ee        = {https://publications.waset.org/pdf/10001842},
	  url   	= {https://publications.waset.org/vol/104},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 104, 2015},
	}