Classification of Construction Projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32797
Classification of Construction Projects

Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside

Abstract:

In order to address construction project requirements and specifications, scholars and practitioners need to establish taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.

Keywords: Project classification, project definition rating index (PDRI), project goals alignment, risk.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1107177

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5119

References:


[1] D. A. Young, C. T. Haas, P. Goodrum, and C. Caldas, “Improving construction supply network visibility by using automated materials locating and tracking technology,” Journal of Construction Engineering and Management, 137(11), 2011, pp. 976-984.
[2] M. Miozzo, and P. Dewick, “Innovation in construction: a European analysis,” Edward Elgar Publishing, 2004.
[3] A. M. Blayse, and K. Manley, “Key influences on construction innovation,” Construction Innovation: Information, Process, Management, 4(3), 2004, pp. 143-154.
[4] G. Edward Gibson, Jr., Y. Wang, C. Cho, and M. Pappas, “What is preproject planning, anyway?” Journal of Management in Engineering, 22(1), 2006, pp. 35-42
[5] G. Edward Gibson, Jr., and R. Gebken, “Design quality in pre-project planning: applications of the Project Definition Rating Index,” Building Research & Information, 31(5), 2003, pp. 346-356.
[6] A. S. Akintoye, and M. J. MacLeod, “Risk analysis and management in construction,” International Journal of Project Management, 15(1), 1997, pp. 31-38.
[7] T. Raz, and E. Michael, “Use and benefits of tools for project risk management,” International Journal of Project Management, 19(1), 2001, pp. 9-17.
[8] Construction Industry Institute (CII), “Managing a portfolio of projects, metrics for improvement,” CII Annual Conference, Indianapolis, 2014.
[9] G. Santana, “Classification of construction projects by scales of complexity, International Journal of Project Management, 8(2), 1990, pp. 102-104.
[10] M. Safa, C. T. Haas, J. Gray, and K. Hipel, “Electronic Process Management System based Front End Planning Tool (FEPT),” Journal of Construction Engineering and Project Management, 3(2), 2013, pp. 1-12.
[11] R. Turner, M. Huemann, and A. Keegan, “Human resource management in the project-oriented organization: employee well-being and ethical treatment,” International Journal of Project Management, 26(5), 2008, pp. 577-585.
[12] M. Safa, “An Advanced Construction Supply Nexus Model,” University of Waterloo, PhD Thesis, 2013.
[13] D. Dvir, S. Lipovetsky, A. Shenhar, and A. Tishler, “In search of project classification: a non-universal approach to project success factors,” Research policy, 27(9), 1998, pp. 915-935.
[14] R. T. De Oliveira Lacerda, L. Ensslin, L., and S. R. Ensslin, “A performance measurement framework in portfolio management: A constructivist case,” Management Decision, 49(4), 2011, pp. 648-668.
[15] D. Kahneman, and A. Tversky, “Prospect theory: An analysis of decision under risk,” Econometrica: Journal of the Econometric Society, 1979, pp. 263-291.
[16] B. Flyvbjerg, “Procedures for dealing with optimism bias in transport planning,” The British Department for Transport, 2004.
[17] D. Baccarini, “The concept of project complexity—a review,” International Journal of Project Management, 14(4), 1996, pp. 201-204.
[18] K. I. Gidado, “Project complexity: the focal point of construction production planning,” Construction Management & Economics, 14(3), 1996, pp. 213-225.
[19] S. Austin, A. Newton, J. Steele, and P. Waskett, “Modelling and managing project complexity,” International Journal of project management, 20(3), 2002, pp. 191-198.
[20] M. Bosch-Rekveldt, Y. Jongkind, H. Mooi, H. Bakker, and A. Verbraeck, “Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework,” International Journal of Project Management, 29(6), 2011, pp. 728-739.
[21] H. R. Kerzner, “Project management: a systems approach to planning, scheduling, and controlling,” John Wiley & Sons, 2013.
[22] S. Shokri, M. Safa, C. T. Haas, R. CG Haas, K. Maloney, S. MacGillivray, “Interface management model for mega capital projects,” In Proc. of the 2012 Construction Research Congress, 2012, pp. 447- 456.
[23] D. White, and J. Fortune, “Current practice in project management—An empirical study,” International journal of project management, 20(1), 2002, pp. 1-11.
[24] S. Ward, and C. Chapman, “Transforming project risk management into project uncertainty management. International Journal of Project Management, 21(2), 2003, pp. 97-105.
[25] T. M. Williams, “The need for new paradigms for complex projects,” International journal of project management, 17(5), 1999, pp. 269-273.
[26] L. A. Vidal, F. Marle, and J. C. Bocquet, “Measuring project complexity using the Analytic Hierarchy Process,” International Journal of Project Management, 29(6), 2011, pp. 718-727.
[27] A. J. Shenhar, “One size does not fit all projects: exploring classical contingency domains,” Management Science, 47(3), 2001, pp. 394-414.
[28] M. T. Pich, C. H. Loch, and A. D. Meyer, “On uncertainty, ambiguity, and complexity in project management,” Management science, 48(8), 2002, pp. 1008-1023.
[29] PMI, “Guide to the Project Management Body of Knowledge,” 4th ed., Project Management Institute, Newtown Square, 2000.
[30] H. Maylor, T. Brady, T. Cooke-Davies, and D. Hodgson, “From projectification to programmification,” International Journal of Project Management, 24(8), 2006, pp. 663-674.
[31] M. Engwall, “No project is an island: linking projects to history and context,” Research policy, 32(5), 2003, pp. 789-808.
[32] R. Müller, and J. R. Turner, “Matching the project manager’s leadership style to project type,” International Journal of Project Management, 25(1), 2007, pp. 21-32.
[33] T. Williams, “Modelling Complex Projects,” Wiley, 2002.
[34] F.E. Kast, and J. E. Rosenweig, “Organisation and Management: A Systems and Contingency Approach,” McGraw-Hill, New York, 1979.
[35] A. Camci, and T. Kotnour, “Technology complexity in projects: does classical project management work?” In Technology Management for the Global Future, IEEE, 2006. Vol. 5, pp. 2181-2186.
[36] J. Bennett, “International Construction Project Management: General Theory and Practice,” Butterworth-Heinemann, Oxford, 1991.
[37] A. Haidar, and R. D. Ellis Jr, “Analysis and Improvement of Megaprojects Performance. In South Lake Tahoe,” CA: Engineering Project Organizations Conference, 2010.
[38] A. J. Shenhar, and D. Dvir, “Toward a typological theory of project management,” Research policy, 25(4), 1996, pp. 607-632.
[39] R. R. Tan, and Y.G. Lu, “On the quality of construction Engineering design projects: Criteria and impacting factors,” International Journal of Quality & Reliability Management, 12(5), 1995, pp. 18-37.
[40] M. Safa, A. Shahi, C. T. Haas, and K. Hipel, “Supplier selection process in an integrated construction materials management model,” Automation in Construction, 48, 2014, pp. 64-73.
[41] P. Brucker, A. Drexl, R. Möhring, K. Neumann, and E. Pesch, “Resource-constrained project scheduling: Notation, classification, models, and methods,” European journal of operational research, 112(1), 1999, pp. 3-41.
[42] D. Lovallo, and D. Kahneman, “Delusions of success,” Harvard business review,” 81(7), 2003, pp. 56-63.
[43] B. Flyvbjerg, “From Nobel prize to project management: getting risks right,” Project Management Journal. 37(3), 2006, pp. 5-15.
[44] D. Arditi, and H. M. Gunaydin, “Total quality management in the construction process,” International Journal of Project Management, 15(4), 2006, pp. 235-243.
[45] M. Safa, S. MacGillivray, M. Davidson, K. Kaczmarczy, C. Haas, E. Gibson, “Identifying influential factors for capital construction project planning strategies,” Canadian Society for Civil Engineering Construction Specialty Conference, University of British Columbia, Vancouver, # 56, 2015.
[46] Construction Industry Institute (CII), “Project Definition Rating Index - Industrial Projects,” University of Austin, Texas, 2009.
[47] M. Safa, A. Shahi, C. Haas, D. Fiander-McCann, M. Safa, K. Hipel, S. MacGillivray “Competitive intelligence (CI) for evaluation of construction contractors,” Automation in Construction, Available online 15 March 2015, ISSN 0926-5805.
[48] E. Birmingham, “Development of the Project Definition Rating Index (PDRI) For Infrastructure Projects, Arizona State University, 2010.
[49] A. Murashkin, M. Antkiewicz, D. Rayside, and K. Czarnecki, “Visualization and Exploration of Optimal Variants in Product Line Engineering,” Software Product Line Conference, Tokyo, Japan, 2013.