The Status of BIM Adoption on Six Continents
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33093
The Status of BIM Adoption on Six Continents

Authors: Wooyoung Jung, Ghang Lee

Abstract:

This paper reports the worldwide status of building information modeling (BIM) adoption from the perspectives of the engagement level, the Hype Cycle model, the technology diffusion model, and BIM services. An online survey was distributed, and 156 experts from six continents responded. Overall, North America was the most advanced continent, followed by Oceania and Europe. Countries in Asia perceived their phase mainly as slope of enlightenment (mature) in the Hype Cycle model. In the technology diffusion model, the main BIM-users worldwide were “early majority” (third phase), but those in the Middle East/Africa and South America were “early adopters” (second phase). In addition, the more advanced the country, the more number of BIM services employed in general. In summary, North America, Europe, Oceania, and Asia were advancing rapidly toward the mature stage of BIM, whereas the Middle East/Africa and South America were still in the early phase. The simple indexes used in this study may be used to track the worldwide status of BIM adoption in long-term surveys.

Keywords: BIM adoption, BIM services, Hype Cycle model, Technology diffusion model.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1100430

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 10542

References:


[1] Berlo, L. V., Dijkmans, T., Hendriks, H., Spekkink, D., and Pel, W. (2012). “BIM QuickScan: benchmark of BIM performance in the Netherlands.” Proc., Proceedings of the CIB W78 2012: 29th International Conference.
[2] Eadie, R., Browne, M., Odeyinky, H., McKeown, C., and McNiffb, S. (2013). “BIM implementation throughout the UK construction project lifecycle: An analysis.” Automation in Construction, vol. 36, pp. 145-151.
[3] Kassem, M., Succar, B., and Dawood, N. (2013). “A proposed approach to comparing the BIM maturity of countries.” Proc., Poceedings of the CIB W78 2013: 30th International Conference – Beijing, China, 9-12 October.
[4] Succar, B. (2009). “Building information modelling framework: A research and delivery foundation for industry stakeholders.” Automation in Construction, vol. 18, issue. 3, pp. 357-375.
[5] Young, N. W., Jr., Jones, S. A., and Bernstein, H. M. (2007). “Interoperability in the Construction Industry.” SmartMarket Report, McGraw Hill Construction, Bedford, MA, pp. 36.
[6] Jr., N. W. Y., Jones, S. A., Bernstein, H. M., and Gudgel, J. E. (2009). “The Business Value of BIM.” SmartMarket Report, McGraw Hill Construction, Bedford, MA, pp. 52.
[7] Bernstein, H. M., Jones, S. A., Gudgel, J. E., Messina, F., Partyka, D., Lorenz, A., Buckley, B., Fitch, E., Laquidara, D., and Gilmore, D. (2010). “The Business Value of BIM in Europe.” SmartMarket Report, McGraw Hill Construction, pp. 52.
[8] Lee. G., Lee, J., Jones, S. A., Uhm, M., Won, J., Ham, S., and Park, Y. (2012). “The Business Value of BIM in South Korea.” SmartMarket Report, McGraw Hill Construction, Bedford, MA, pp. 60.
[9] Bernstein, H. M., Jones, S. A., Russo, M. A., Laquidara-Carr, D., Taylor, W., Ramos, J., Healy, M., Lorenz, A., Fujishima, H., Fitch, E., Buckley, B., and Gilmore, D. (2012). “Business Value of BIM in North America.” SmartMarket Report, McGraw Hill Construction, Bedford, MA, pp. 64.
[10] Bernstein, H. M., Jones, S. A., Russo, M. A., Laquidara-Carr, D., Taylor, W., Ramos, J., Lorenz, A., and Terumasa, Y. (2013). “The Business Value of BIM for Construction in Major Global Markets.” SmartMarket Report, McGraw Hill Construction, Bedford, MA, pp. 64.
[11] Bernstein, H. M., Jones, S. A., Russo, M. A., Laquidara-Carr, D., Taylor, W., Ramos, J., and Pineda, R. (2014). “The Business Value of BIM in Australia and New Zealand.” SmartMarket Report, McGraw Hill Construction, pp. 64.
[12] Won, J., Lee, G., and Lee, C. (2009). “Comparative analysis of BIM adoption in Korean Construction Industry and Other countries.” ICCEM, ICCPM 2009, Jeju.
[13] The National BIM Survey. (2011). “National BIM Report 2011” NBS, the National BIM Survey, pp. 21.
[14] The National BIM Survey. (2012). “National BIM Report 2012” NBS, the National BIM Survey, pp. 20.
[15] The National BIM Survey. (2013). “National BIM Report 2013” NBS, the National BIM Survey, pp. 28.
[16] The National BIM Survey. (2014). “National BIM Report 2014” NBS, the National BIM Survey, pp. 36.
[17] Sharif, T. (2011). “BIM in the Middle East.” Middle-East BIM report, buildingSMART ME, pp. 64.
[18] Nikkie BP Consulting, Inc. (2011). “Japan 2011 BIM Survey”, Nikkie BP Consulting, Inc., pp. 52.
[19] The National BIM Survey. (2013). “NBS International BIM Report 2013” NBS, the National BIM Survey. pp. 16.
[20] O’Leary, D. E. (2008). “Gartner’s hype cycle and information system research issues.” International Journal of Accounting Information Systems, vol. 9, issue. 4, pp. 240-252.
[21] Fenn, J., and Raskino, M. (2008). Matering the HYPE CYCLE, Harvard Business Review Press. pp.3-88
[22] Rogers, E. M. (2003). Diffusion of innovations, Free Press. pp.252-280
[23] Kreider, R., Messner, J., and Dubler, C. (2010). “Determining the Frequency and Benefit of Applying BIM for Different Purposes on Building Projects.” 6th International Conference on Innovation in Architecture, Engineering and Construction (AEC), Penn State University, University Park, PA, USA.
[24] Messner, J., Anumba, C., Dubler, C., Goddman, S., Kasprzak, C., Kreider, R., Leicht, R., Saluja, C., and Zikic, N. (2010). “BIM Project Execution Planning Guide.” The Computer Integrated Construction Research Program, pp. 134.
[25] Won, J., Lee, G., and Park, Y. (2010). “2010 Survey on BIM Adoption in Korea” The BIM, buildingSMART Korea.