Project Management Related Abstracts

53 Applications of Building Information Modeling (BIM) in Knowledge Sharing and Management in Construction

Authors: Shu-Hui Jan, Hui-Ping Tserng, Shih-Ping Ho

Abstract:

Construction knowledge can be referred to and reused among involved project managers and job-site engineers to alleviate problems on a construction job-site and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology to provide sharing of construction knowledge by using the Building Information Modeling (BIM) approach. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format, and facilitation of easy updating and transfer of information in the 3D BIM environment. Using the BIM approach, project managers and engineers can gain knowledge related to 3D BIM and obtain feedback provided by job-site engineers for future reference. This study addresses the application of knowledge sharing management in the construction phase of construction projects and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to verify the proposed methodology and demonstrate the effectiveness of sharing knowledge in the BIM environment. The combined results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM approach and web technology.

Keywords: Project Management, Building Information Modeling, construction knowledge management, web-based information system

Procedia PDF Downloads 189
52 Software Development and Team Diversity

Authors: J. Congalton, K. Logan, B. Crump

Abstract:

Software is a critical aspect of modern life. However it is costly to develop and industry initiatives have focused on reducing costs and improving the productivity. Increasing, software is being developed in teams, and with greater globalization and migration, the teams are becoming more ethnically diverse. This study investigated whether diversity in terms of ethnicity impacted on the productivity of software development. Project managers of software development teams were interviewed. The study found that while some issues did exist due to language problems, when project managers created an environment of trust and friendliness, diversity made a positive contribution to productivity.

Keywords: Diversity, Project Management, Software Development, team work

Procedia PDF Downloads 204
51 A Case Study of Al-Shifa: A Healthcare Information System in Oman

Authors: Khamis Al-Gharbi, Said M. Gattoufi, Ali H. Al-Badi, Ali Al-Hashmi

Abstract:

The case study presents the progression of a project management of Al-Shifa, a healthcare information system in Oman. The case study describes the evolution of the implementation of a healthcare information system tailored to meet the needs of the healthcare units under the supervision of the Ministry of Health (MOH) in Oman. A focus group methodology was used for collecting the relevant information from the main project's stakeholders. In addition reports about the project made available for the researchers. The case analysis is made based on the Project Management approach developed by the Project Management Institute (PMI). The main finding that there was no formal project management approach adopted by the MOH for the development and implementation of the herewith mentioned healthcare information system project. Furthermore, the project had suffered a scope creep in terms of features, cost and time-schedule. The recommendations of the authors, for the rescue of the project from its current dilemma, consist of technological, administrative and human resources development actions.

Keywords: Healthcare, Project Management, Information System, oman, Al-Shifa

Procedia PDF Downloads 153
50 ERP Implementation in Iran: A Successful Experience in DGC

Authors: Mohammad Reza Ostad Ali Naghi Kashani

Abstract:

Nowadays, the amounts of companies which tend to have an Enterprise Resource Planning (ERP) application are increasing. Although ERP projects are expensive, time consuming, and complex, there are some successful experiences. These days, developing countries are striving to implement ERP projects successfully; however, there are many obstacles. Therefore, these projects would be failed or partially failed. This paper concerns the implementation of a successful ERP implementation, IFS, in Iran at Dana Geophysics Company (DGC). After a short review of ERP and ERP market in Iran, we propose a three phases deployment methodology (phase 1: Preparation and Business Process Management (BPM) phase 2: implementation and phase 3: testing, golive-1 (pilot) and golive-2 (final)). Then, we present five guidelines (Project Management, Change Management, Business Process Management (BPM), Training& Knowledge Management, and Technical Management), which were chose as work streams. In this case study we present lessons learned in Project management and Business process Management.

Keywords: Business Process Management, Project Management, ERP, critical success factors

Procedia PDF Downloads 326
49 Engineering Management and Practice in Nigeria

Authors: Harold Jideofor

Abstract:

The application of Project Management (PM) tools and techniques in the public sector is gradually becoming an important issue in developing economies, especially in a country like Nigeria where projects of different size and structures are undertaken. The paper examined the application of the project management practice in the public sector in Nigeria. The PM lifecycles, tools, and techniques were presented. The study was carried out in Lagos because of its metropolitan nature and rapidly growing economy. Twenty-three copies of questionnaire were administered to 23 public institutions in Lagos to generate primary data. The descriptive analysis techniques using percentages and table presentations coupled with the coefficient of correlation were used for data analysis. The study revealed that application of PM tools and techniques is an essential management approach that tends to achieve specified objectives within specific time and budget limits through the optimum use of resources. Furthermore, the study noted that there is a lack of in-depth knowledge of PM tools and techniques in public sector institutions sampled, also a high cost of the application was also observed by the respondents. The study recommended among others that PM tools and techniques should be applied gradually especially in old government institutions where resistance to change is perceived to be high.

Keywords: Project Management, Public Sector, Practice, Nigeria

Procedia PDF Downloads 174
48 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: Project Management, Dam construction, Iran, delay

Procedia PDF Downloads 276
47 Converting Scheduling Time into Calendar Date Considering Non-Interruptible Construction Tasks

Authors: Salman Ali Nisar, Suzuki Koji

Abstract:

In this paper we developed a new algorithm to convert the project scheduling time into calendar date in order to handle non-interruptible activities not to be split by non-working days (such as weekend and holidays). In a construction project some activities might require not to be interrupted even on non-working days, or to be finished on the end day of business days. For example, concrete placing work might be required to be completed by the end day of weekdays i.e. Friday, and curing in the weekend. This research provides an algorithm that imposes time constraint for start and finish times of non-interruptible activities. The algorithm converts working days, which is obtained by Critical Path Method (CPM), to calendar date with consideration of the start date of a project. After determining the interruption by non-working days, the start time of a certain activity should be postponed, if there is enough total float value. Otherwise, the duration is shortened by hiring additional resources capacity or/and using overtime work execution. Then, time constraints are imposed to start time and finish time of the activity. The algorithm is developed in Excel Spreadsheet for microcomputer and therefore we can easily get a feasible, calendared construction schedule for such a construction project with some non-interruptible activities.

Keywords: Scheduling, Project Management, critical path method, time constraint, non-interruptible tasks

Procedia PDF Downloads 368
46 GIS Based Project Management Information System for Infrastructure Projects

Authors: Debasis Sarkar, Riki Panchal

Abstract:

This paper describes the work done for the GIS-based project management for different infrastructure projects. It is a review paper which gives the idea of the trends in the construction project management and various models adopted for the betterment of the project planning and execution. Traditional scheduling and progress control techniques such as bar charts and the critical path method fail to provide information pertaining to the spatial aspects of a construction project. An integrated system was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. Hence, it is suggested to work on the common platform from where all the data can be shared and analyzed.

Keywords: Project Management, GIS, integrated model, infrastructure project

Procedia PDF Downloads 363
45 Knowledge Sharing within a Team: Exploring the Antecedents and Role of Trust

Authors: Li Yan Hei, Au Wing Tung

Abstract:

Knowledge sharing is a process in which individuals mutually exchange existing knowledge and co-create new knowledge. Previous research has confirmed that trust is positively associated with knowledge sharing. However, only few studies systematically examined the antecedents of trust and these antecedents’ impacts on knowledge sharing. In order to explore and understand the relationships between trust and knowledge sharing in depth, this study proposed a relationship maintenance-based model to examine the antecedents of trust in knowledge sharing in project teams. Three critical elements within a project team were measured, including the environment, project team partner and interaction. It was hypothesized that the trust would lead to knowledge sharing and in turn result in perceived good team performance. With a sample of 200 Hong Kong employees, the proposed model was evaluated with structural equation modeling. Expected findings are trust will contribute to knowledge sharing, resulting in better team performance. The results will also offer insights into antecedents of trust that play a heavy role in the focal relationship. The present study contributes to a more holistic understanding of relationship between trust and knowledge sharing by linking the antecedents and outcomes. The findings will raise the awareness of project managers on ways to promote knowledge sharing.

Keywords: Project Management, Trust, Knowledge sharing, team

Procedia PDF Downloads 461
44 The Organizational Structure of the Special Purpose Vehicle in Public-Private Partnership Projects

Authors: Samuel Capintero

Abstract:

Public-private partnerships (PPP) arrangements have emerged all around the world as a response to infrastructure deficits and the need to refurbish existing infrastructure. During the last decade, the Spanish companies have dominated the international market of PPP projects in Latin America, Western Europe and North America, particularly in the transportation sector. Arguably, one of the most influential factors has been the organizational structure of the concessionaire implemented by the Spanish consortiums. The model followed by most Spanish groups has been a bundled model, where the concessionaire integrates the functions of concessionaire, construction and operator companies. This paper examines this model and explores how it has provided the Spanish companies with a comparative advantage in the international PPP market.

Keywords: Construction, Project Management, Infrastructure, PPP, concession, concessionaire

Procedia PDF Downloads 255
43 Practical Experiences as Part of Project Management Course

Authors: H. Hussain, N. H. Mohamad

Abstract:

Practical experiences have been one of the successful criteria for the Project Management course for the art and design students. There are series of events that the students have to undergo as part of their practical exercises in the learning context for Project Management courses. These series have been divided into few mini programs that involved the whole individual in each group. Therefore, the events have been one of the bench marks for these students. Through the practical experience, the task that has been given to individual has been performed according to the needs of professional practice and ethics.

Keywords: Project Management, Events, Programs, practical experience, art and design students

Procedia PDF Downloads 395
42 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: Project Management, Performance, Cost, Time, dynamic planning

Procedia PDF Downloads 338
41 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: Project Management, Project, influencing factors, goal

Procedia PDF Downloads 401
40 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: Risk management, Project Management, project marketing, tendering, turn-key projects

Procedia PDF Downloads 213
39 Industrial Investment and Contract Models in Subway Projects: Case Study

Authors: Seyed Habib A. Rahmati, Parsa Fallah Sheikhlari, Morteza Musakhani

Abstract:

This paper studies the structure of financial investment and efficiency on the subway would be created between Hashtgerd and Qazvin in Iran. Regarding ascending rate of transportation between Tehran and Qazvin which directly air pollution, it clearly implies to public transportation requirement between these two cities near Tehran. The railway transportation like subway can help each country to terminate traffic jam which has some advantages such as speed, security, non-pollution, low cost of public transport, etc. This type of transportation needs national infrastructures which require enormous investment. It couldn’t implement without leading and managing funds and investments properly. In order to response 'needs', clear norms or normative targets have to be agreed and obviously it is important to distinguish costs from investment requirements critically. Implementation phase affects investment requirements and financing needs. So recognizing barrier related to investment and the quality of investment (what technologies and services are invested in) is as important as the amounts of investment. Different investment methods have mentioned as follows loan, leasing, equity participation, Line of financing, finance, usance, bay back. Alternatives survey before initiation and analyzing of risk management is one of the most important parts in this project. Observation of similar project cities each country has the own specification to choose investment method.

Keywords: Project Management, subway project, project investment, project contract

Procedia PDF Downloads 336
38 Towards Establishing a Universal Theory of Project Management

Authors: Divine Kwaku Ahadzie

Abstract:

Project management (PM) as a concept has evolved from the early 20th Century into a recognized academic and professional discipline, and indications are that it has come to stay in the 21st Century as a world-wide paradigm shift for managing successful construction projects. However, notwithstanding the strong inroads that PM has made in legitimizing its academic and professional status in construction management practice, the underlining philosophies are still based on cases and conventional practices. An important theoretical issue yet to be addressed is the lack of a universal theory that offers philosophical legitimacy for the PM concept as a uniquely specialized management concept. Here, it is hypothesized that the law of entropy, the theory of uncertainties and the theory of risk management offer plausible explanations for addressing the lacuna of what constitute PM theory. The theoretical bases of these plausible underlying theories are argued and attempts made to establish the functional relationships that exist between these theories and the PM concept. The paper then draws on data related to the success and/or failure of a number of construction projects to validate the theory.

Keywords: Construction, Project Management, Concepts, universal theory

Procedia PDF Downloads 213
37 A Bi-Objective Model to Address Simultaneous Formulation of Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering has been increasingly addressed within last decades as an approach to improve the project execution costs. Therefore, we have taken the problem into consideration in this paper, aiming to maximize schedules quality robustness, in addition to minimize the relevant costs. In this regard, a bi-objective mathematical model is developed to formulate the problem. Moreover, it is possible to utilize the all-unit discount for materials purchasing. The problem is then solved by the constraint method, and the Pareto front is obtained for a variety of robustness values. The applicability and efficiency of the proposed model is tested by different numerical instances, finally.

Keywords: Project Management, Project Scheduling, material ordering, e-constraint method

Procedia PDF Downloads 136
36 Risk Management in Industrial Supervision Projects

Authors: Érick Aragão Ribeiro, George André Pereira Thé, José Marques Soares

Abstract:

Several problems in industrial supervision software development projects may lead to the delay or cancellation of projects. These problems can be avoided or contained by using identification methods, analysis and control of risks. These procedures can give an overview of the possible problems that can happen in the projects and what are the immediate solutions. Therefore, we propose a risk management method applied to the teaching and development of industrial supervision software. The method is developed through a literature review and previous projects can be divided into phases of management and have basic features that are validated with experimental research carried out by mechatronics engineering students and professionals. The management is conducted through the stages of identification, analysis, planning, monitoring, control and communication of risks. Programmers use a method of prioritizing risks considering the gravity and the possibility of occurrence of the risk. The outputs of the method indicate which risks occurred or are about to happen. The first results indicate which risks occur at different stages of the project and what risks have a high probability of occurring. The results show the efficiency of the proposed method compared to other methods, showing the improvement of software quality and leading developers in their decisions. This new way of developing supervision software helps students identify design problems, evaluate software developed and propose effective solutions. We conclude that the risk management optimizes the development of the industrial process control software and provides higher quality to the product.

Keywords: Risk management, Project Management, supervision software, industrial supervision

Procedia PDF Downloads 223
35 Managing a Cross-Disciplinary Research Project in a University: The Case of LEARNIT

Authors: Yulia Stukalina

Abstract:

This paper explores the main issues related to implementing a cross-disciplinary research project (LEARNIT) based on collaboration between universities from three European countries. The paper discusses the importance of using the holistic approach to managing scientific projects with due account for the complicated nature of the educational environment of a modern university. To illustrate this approach, the author describes some actions to be taken for supporting different focus areas of LEARNIT project, in the process using integrated tangible, non-tangible, and semi-tangible resources of the partner university. The methodology of the paper is based on the academic literature and research papers analysis within management discipline. The analysis reported in the paper is also based on the author’s professional experience in the area of managing international research projects in a university.

Keywords: Project Management, resources, LEARNIT, focus area

Procedia PDF Downloads 133
34 Engaging Mature Learners through Video Case Studies

Authors: Jacqueline Mary Jepson

Abstract:

This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.

Keywords: Project Management, adult learning, video case study, asynchronistic education

Procedia PDF Downloads 229
33 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects

Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima

Abstract:

Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.

Keywords: Project Management, continuous improvement, lean thinking, critical success factors (csf)

Procedia PDF Downloads 207
32 Empirical Study for the Project and the Project Management Dimensions Comparison between SMEs and Large Companies

Authors: Amina Oukennou, Zitouni Beidouri, Otmane Bouksour

Abstract:

Small to Medium-sized enterprises are a very important component of the economy. They are present in the whole industries all over the world. They are considered as the engine for future growth in the economy. Project management is an economical international factor impacting all types of enterprises including the SMEs. This paper has the aim of measuring the weight of using projects and project management in Moroccan SMEs in comparison with the large companies. The study is based on interviews with experts: project managers, managers, directors, and consultants. They were asked questions measuring the weight of using projects, the level of using project management, and the resources employed. Eighteen Moroccan companies from a range of industries and sizes were consulted. All the companies consider projects as a key element in their strategy. Most of them affirm the great usefulness of the approach 'project', especially for the external activities. The main differences lie in the duration and the size of used projects. Despite the commonly shared idea about the importance of the project management, the interviewed persons believe that the project management knowledge has the same importance or less than the technical knowledge. All the companies affirm the need for a simpler version of project management. The content varies from one company to another.

Keywords: Project Management, Morocco, project dimension, small to medium-sized entreprise

Procedia PDF Downloads 134
31 An Improved GA to Address Integrated Formulation of Project Scheduling and Material Ordering with Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of the resource constraint project scheduling and material ordering problems have received significant attention within the last decades. Hence, the issue has been investigated here with the aim to minimize total project costs. Furthermore, the presented model considers different discount options in order to approach the real world conditions. The incorporated alternatives consist of all-unit and incremental discount strategies. On the other hand, a modified version of the genetic algorithm is applied in order to solve the model for larger sizes, in particular. Finally, the applicability and efficiency of the given model is tested by different numerical instances.

Keywords: Project Management, Genetic Algorithm, Project Scheduling, material ordering

Procedia PDF Downloads 150
30 Promoting Innovation Pedagogy in a Capacity Building Project in Indonesia

Authors: Juha Kettunen

Abstract:

This study presents a project that tests and adjusts active European learning and teaching methods in Indonesian universities to increase their external impact on enterprises and other organizations; it also assesses the implementation of the Erasmus+ projects funded by the European Union. The project is based on the approach of innovation pedagogy that responds to regional development needs and integrates applied research and development projects into education to create capabilities for students to participate in development work after graduation. The assessment of the Erasmus+ project resulted in many improvements that can be made to achieve higher quality and innovativeness. The results of this study are useful for those who want to improve the applied research and development projects of higher education institutions.

Keywords: Higher Education, Project Management, Social Network, Innovations

Procedia PDF Downloads 148
29 Engaging Local Communities on Large-Scale Construction Project

Authors: Melissa Teo

Abstract:

It is increasingly important that project managers develop greater capabilities to better manage the social, cultural, political, environmental and economic impacts on proposed construction projects. These challenges are best resolved in consultation with communities rather than in conflict with them. This is particularly important on controversial projects which are projects that have obtained government sanctioned ‘development approval’ but not ‘community approval’. While a rich body of research and intellectual frameworks exist in the fields of urban geography and planning to understand and manage community concerns during the pre-development approval stages of new projects, current theoretical frameworks guiding community engagement in project management are inadequate. A new and innovative research agenda is needed to guide thinking about the role of local communities in the construction process and is an important research gap that needs to be filled. Within this context, this research aims to assess the effectiveness of strategies adopted by project teams to engage with local communities so as to capture lessons learnt to apply to future projects. This paper reports a research methodology which uses Arnstein’s model of participation to better understand how power differentials between the project team and local communities can influence the adoption of community engagement strategies. A case study approach is utilizing interviews and documentary analysis of a large-scale controversial construction project in Queensland, Australia is presented. The findings will result in a number of recommendations to guide community engagement practices on future projects.

Keywords: Construction, Project Management, Community Engagement, Case study

Procedia PDF Downloads 156
28 Cost Overruns in Mega Projects: Project Progress Prediction with Probabilistic Methods

Authors: Yasaman Ashrafi, Stephen Kajewski, Annastiina Silvennoinen, Madhav Nepal

Abstract:

Mega projects either in construction, urban development or energy sectors are one of the key drivers that build the foundation of wealth and modern civilizations in regions and nations. Such projects require economic justification and substantial capital investment, often derived from individual and corporate investors as well as governments. Cost overruns and time delays in these mega projects demands a new approach to more accurately predict project costs and establish realistic financial plans. The significance of this paper is that the cost efficiency of megaprojects will improve and decrease cost overruns. This research will assist Project Managers (PMs) to make timely and appropriate decisions about both cost and outcomes of ongoing projects. This research, therefore, examines the oil and gas industry where most mega projects apply the classic methods of Cost Performance Index (CPI) and Schedule Performance Index (SPI) and rely on project data to forecast cost and time. Because these projects are always overrun in cost and time even at the early phase of the project, the probabilistic methods of Monte Carlo Simulation (MCS) and Bayesian Adaptive Forecasting method were used to predict project cost at completion of projects. The current theoretical and mathematical models which forecast the total expected cost and project completion date, during the execution phase of an ongoing project will be evaluated. Earned Value Management (EVM) method is unable to predict cost at completion of a project accurately due to the lack of enough detailed project information especially in the early phase of the project. During the project execution phase, the Bayesian adaptive forecasting method incorporates predictions into the actual performance data from earned value management and revises pre-project cost estimates, making full use of the available information. The outcome of this research is to improve the accuracy of both cost prediction and final duration. This research will provide a warning method to identify when current project performance deviates from planned performance and crates an unacceptable gap between preliminary planning and actual performance. This warning method will support project managers to take corrective actions on time.

Keywords: Simulation, Project Management, risk analysis, Earned Value Management, Cost Forecasting, Project Control

Procedia PDF Downloads 171
27 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus

Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis

Abstract:

Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.

Keywords: Project Management, UAV, bim, Project Monitoring

Procedia PDF Downloads 183
26 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: AMIT SHARMA, Abdulaziz Alnajem

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: Analysis, Design, Oil and Gas, Project Management, Improvement, delays, business management system

Procedia PDF Downloads 102
25 Stakeholder Management for Successful Software Projects

Authors: Kassem Saleh

Abstract:

An alarming number of software projects fail to deliver the required functionalities within the provided budget and timeframe and with the required qualities. Some of the main reasons for this problem include bad stakeholder management, poor communications and informal change management. Informal processes to identify, engage and control stakeholders lead to these reasons. Recently, to emphasize its importance, the Project Management Institute (PMI) updated the Project Management Body of Knowledge (PMBoK) to explicitly include the stakeholder management knowledge area. This knowledge area consists of four processes to identify stakeholders, plan stakeholder management, and manage and control stakeholder engagement. The use of appropriate techniques for stakeholder management in software projects will definitely lead to higher quality and successful software. In this paper, we describe some of the proven techniques that can be used during the execution of the four processes for stakeholder management. Development of collaboration tools for automating these processes are recommended and need to be integrated in available software project management tools.

Keywords: Project Management, Software Development, stakeholder management, project management body of knowledge

Procedia PDF Downloads 172
24 Project Management Agile Model Based on Project Management Body of Knowledge Guideline

Authors: Iraj Mahdavi, Mehrzad Abdi Khalife

Abstract:

This paper presents the agile model for project management process. For project management process, the Project Management Body of Knowledge (PMBOK) guideline has been selected as platform. Combination of computational science and artificial intelligent methodology has been added to the guideline to transfer the standard to agile project management process. The model is the combination of practical standard, computational science and artificial intelligent. In this model, we present communication model and protocols to keep process agile. Here, we illustrate the collaboration man and machine in project management area with artificial intelligent approach.

Keywords: Project Management, Artificial Intelligent, standard, conceptual model, man-machine collaboration

Procedia PDF Downloads 184