Labor Productivity in the Construction Industry -Factors Influencing the Spanish Construction Labor Productivity-
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32797
Labor Productivity in the Construction Industry -Factors Influencing the Spanish Construction Labor Productivity-

Authors: G. Robles, A. Stifi, José L. Ponz-Tienda, S. Gentes

Abstract:

This research paper aims to identify, analyze and rank factors affecting labor productivity in Spain with respect to their relative importance. Using a selected set of 35 factors, a structured questionnaire survey was utilized as the method to collect data from companies. Target population is comprised by a random representative sample of practitioners related with the Spanish construction industry. Findings reveal the top five ranked factors are as follows: (1) shortage or late supply of materials; (2) clarity of the drawings and project documents; (3) clear and daily task assignment; (4) tools or equipment shortages; (5) level of skill and experience of laborers. Additionally, this research also pretends to provide simple and comprehensive recommendations so that they could be implemented by construction managers for an effective management of construction labor forces.

Keywords: Construction management, Factors, Improvement, Labor productivity, Lean construction.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1096495

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 6900

References:


[1] SEOPAN, "Informe Licitación Pública Mayo 2014,” www.seopan.es/ficheros/459cdd74d3780892fb690d787c22f59e.pdf
[2] K. M. El-Gohary, R. F. Aziz, "Factors Influencing Construction Labor Productivity in Egypt,” Journal of Management in Engineering, vol. 30(1), pp. 1-9, 2014.
[3] J. Yates, S. Guhathakurta, "International labour productivity,” J. Constr. Eng., vol. 35(1), pp. 15-25, 1993.
[4] B. McTague, G. Jergeas, Productivity improvements on Alberta major construction projects, construction productivity improvement report/project evaluation tool. Alberta Economic Development, Alberta, Canada, 2002.
[5] Ministerio de Fomento, "Estructura de la construcción 2012,” www.fomento.es/NR/rdonlyres/E6BA633C-1914-4CEA-A19F- 488F0A31CDDD/124513/EC2012.pdf
[6] S. Wilcox, B. Stringfellow, R. Harris, B. Martin, "Management and productivity,” Transportation research board, committee on management and productivity. Washington, USA, 2000.
[7] C. H. Oglesby, H. W. Parker, G. A. Howell, Productivity improvement in construction, McGraw-Hill, New York, 1989.
[8] G. J. Sweis, "Impact of conversion technology on productivity in masonry construction,” PhD dissertation, Northwestern Univ., Evanston, Ill, 2000.
[9] B. T. Talhouni, "Measurement and analysis of construction labour productivity.” Ph.D. thesis, Dept. of Civil Engineering, Univ. of Dundee, Dundee, UK, 1990.
[10] A. M. Jarkas, C. G. Bitar, "Factors affecting construction labor productivity in Kuwait.” Journal of Construction Engineering and Management, 10.1061/(ASCE)CO .1943-7862.0000501, 2012, pp. 811– 820.
[11] A. M. Jarkas, "Critical investigation into the applicability of the learning curve theory to rebar fixing labor productivity,”Journal of Construction Engineering and Management, vol. 136 (12), pp. 1279-1288, 2010.
[12] Y. M. Hong, W. M. Chan, P.C. Chan, F. Y. Yeung. "Critical analysis of partnering research trend in construction journals.” Journal of Management in Engineering, vol. 27 (2), pp. 82-95, 2012.
[13] N. M. Lema, "Construction of labour productivity modelling,” University of Dar Elsalaam, 1995.
[14] A. Enshassi, S. Mohamed, Z. Abu Mustafa, P. E. Mayer, "Factors affecting labour productivity in building projects in the Gaza Strip.” Journal of Constuction. Engineering and Management, vol. 13(4), pp. 245-254, 2007.
[15] A. Stifi, F. Gehbauer, S. Gentes. "The Picture of Integrity from Lean Management’s Point Of View: The Relationship between Integrity Management System and Last Planner System”; IGLC & Akademika forlag, ISBN 978-82-321-0460-4, pp. 907–918, 2014.
[16] Official Register of Classified Companies of Spain. http://serviciosweb.meh.es/apps/contratistas/FiltroObrasGen.asp
[17] R. V. Hogg, E. A. Tanis, Probability and statistical inference, 8th Ed., Prentice Hall, NJ, 2009.
[18] S. A. Assaf, M. Al-Khalil, M. Al-Hazmi, "Causes of delays in large building construction projects,” ASCE Journal of Management in Engineering, vol. 11, pp. 45–50, 1995.
[19] A. Faridi, S. El-Sayegh, "Significant factors causing delay in the UAE construction industry,” Construction Management and Economics, vol. 24, pp. 1167–1176, 2006.
[20] M. M. Kumaraswamy, D. W. M. Chan, "Contributors to construction delays,” Construction Management and Economics, vol. 16, pp. 17–29, 1998.
[21] S. Durdyev, J. Mbachu, "On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures,” Australasian Journal of Construction Economics and Building, vol. 11(3), pp. 18–33, 2011.
[22] R. M. W. Horner, B. T. Talhouni, H. R. Thomas, "Preliminary results of major labour productivity monitoring programme,” Procedures of the 3rd Yugoslavian Symp. on Construction Management, Cavtat, pp. 18– 28, 1989.
[23] A. Makulsawatudom, M. Emsley, K. Sinthawanarong, "Critical factors influencing construction productivity in Thailand,” J. King Mongkut’s University of Technology, vol. 14(3), pp. 1–6, 2004.
[24] H. M. Alinaitwe, J. A. Mwakali, B. Hansson, "Factors affecting the productivity of building craftsmen—Studies of Uganda,” Journal of Civil Engineering and Management, vol. 13(3), pp. 169–176, 2007.
[25] H. R. Thomas, "Construction baseline productivity: theory and practice,” Journal of Construction Management and Engineering, ASCE, vol. 125(5), pp. 295–303, 1999.
[26] R. C. Whitehead, "Factors influencing labour productivity on construction sites,” Ph.D. thesis, Dept. of Civil Engineering, Univ. of Dundee, Dundee, UK, 1990.
[27] J. D. Borcherding, S. J. Sebastian,N. M. Samelson, "Improving motivation and productivity on large projects,” Journal of the Construction Division, vol. 106(1), pp. 73–89, 1980.
[28] M. R. Abdul Kadir, W. P. Lee, M. S. Jaafar, S. M. Sapuan, A. A. Ali, "Factors affecting construction labour productivity for Malaysian residential projects,” Structural Survey, vol. 23(1), pp. 42-54, 2005.
[29] M. Liu, G. Ballard, W. Ibbs, "Work flow variation and labor productivity: Case study,” Journal of Management in Engineering, 10.1061/ (ASCE) ME.1943- 5479.0000056, pp. 236–242, 2011.
[30] E. C. Lim, J. Alum, "Construction productivity: Issues encountered by contractors in Singapore,” International Journal of Project Management, vol. 13(1), pp. 51–58, 1995.
[31] H. R. Thomas, S. R. Sanders, "Factors affecting masonry productivity,” Journal of Construction Engineering and Management, ASCE, vol. 117(4), pp. 626–644, 1991.