WASET
Nugraheni, C. , Abednego, L. (2014), 'A Combined Meta-Heuristic with Hyper-Heuristic Approach to Single Machine Production Scheduling Problem', World Academy of Science, Engineering and Technology, Open Science Index 92, International Journal of Computer and Information Engineering, 8(8), 1322 - 1326.