	  title     = {Causes of Final Account Closing Delay:  A Theoretical Framework},
	  author    = {Zarabizan Zakaria and  Syuhaida Ismail and  Aminah Md. Yusof},
	  country	= {},
	  institution	= {},
	  abstract     = {Delay can be defined as time overrun or extension of time to complete the project. There are high possibilities that delay issues in final account closing cannot be avoided especially in construction project in Malaysia which is unique and dynamic in the terms of nature of design and technical skill. Delay in final account closing is a situation when the actual planning (time and budget allocation) of a construction project exceeds the planned schedule or on the other hand, final account closing exceeds the time and other provisions specified in the contract. The causes of delay discussed in this paper are appraised from the literature review. There are two main types of delay: excusable delay and non-excusable delay. The literature reviews on the delay in final account closing which is then translated into a theoretical framework are summarized in the context of construction players and academician perspective. It is anticipated that the finding reported in this paper could assist the planning of future strategies and guidelines of final account closing for the betterment of construction projects in Malaysia.
},
	    journal   = {International Journal of Economics and Management Engineering},
	  volume    = {7},
	  number    = {10},
	  year      = {2013},
	  pages     = {2826 - 2832},
	  ee        = {https://publications.waset.org/pdf/9996561},
	  url   	= {https://publications.waset.org/vol/82},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 82, 2013},
	}