	  title     = {Resource Leveling in Construction Projects using Re- Modified Minimum Moment Approach},
	  author    = {Abhay Tawalare and  Rajesh Lalwani},
	  country	= {},
	  institution	= {},
	  abstract     = {An attempt in this paper proposes a re-modification to
the minimum moment approach of resource leveling which is a modified minimum moment approach to the traditional method by
Harris. The method is based on critical path method. The new approach suggests the difference between the methods in the
selection criteria of activity which needs to be shifted for leveling resource histogram. In traditional method, the improvement factor
found first to select the activity for each possible day of shifting. In
modified method maximum value of the product of Resources Rate
and Free Float was found first and improvement factor is then
calculated for that activity which needs to be shifted. In the proposed
method the activity to be selected first for shifting is based on the largest value of resource rate. The process is repeated for all the
remaining activities for possible shifting to get updated histogram.
The proposed method significantly reduces the number of iterations
and is easier for manual computations.},
	    journal   = {International Journal of Civil and Environmental Engineering},
	  volume    = {6},
	  number    = {2},
	  year      = {2012},
	  pages     = {200 - 202},
	  ee        = {https://publications.waset.org/pdf/8655},
	  url   	= {https://publications.waset.org/vol/62},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 62, 2012},
	}