	  title     = {Identification of the Causes of Construction Delay in Malaysia},
	  author    = {N. Hamzah and  M.A. Khoiry and  I. Arshad and  W.H.W. Badaruzzaman and  N. M. Tawil},
	  country	= {},
	  institution	= {},
	  abstract     = {Construction delay is unavoidable in developing
countries including Malaysia. It is defined as time overrun or
extension of time for completion of a project. The purpose of the
study is to determine the causes of delay in Malaysian construction
industries based on previous worldwide research. The field survey
conducted includes the experienced developers, consultants and
contractors in Malaysia. 34 causes of the construction delay have
been determined and 24 have been selected using the Rasch model
analysis. The analysis result will be used as the baseline for the next
research to find the causes of delay in the Malaysian construction
industry taking place in Malaysian higher learning institutions.},
	    journal   = {International Journal of Civil and Environmental Engineering},
	  volume    = {6},
	  number    = {12},
	  year      = {2012},
	  pages     = {1063 - 1068},
	  ee        = {https://publications.waset.org/pdf/8332},
	  url   	= {https://publications.waset.org/vol/72},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 72, 2012},
	}