WASET
	%0 Journal Article
	%A A. Eui Koog Ahn and  B. Gi-Nam Wang and  C. Sang C. Park
	%D 2010
	%J International Journal of Industrial and Manufacturing Engineering
	%B World Academy of Science, Engineering and Technology
	%I Open Science Index 45, 2010
	%T Study on Scheduling of the Planning Method Using the Web-based Visualization System in a Shipbuilding Block Assembly Shop
	%U https://publications.waset.org/pdf/7819
	%V 45
	%X Higher productivity and less cost in the ship
manufacturing process are required to maintain the international
competitiveness of morden manufacturing industries. In shipbuilding,
however, the Engineering To Order (ETO) production method and
production process is very difficult. Thus, designs change frequently.
In accordance with production, planning should be set up according
to scene changes. Therefore, fixed production planning is very
difficult. Thus, a scheduler must first make sketchy plans, then
change the plans based on the work progress and modifications.
Thus, data sharing in a shipbuilding block assembly shop is very
important. In this paper, we proposed to scheduling method
applicable to the shipbuilding industry and decision making support
system through web based visualization system.
	%P 821 - 824