Maciej Norberciak, Universal Method for Timetable Construction based on Evolutionary Approach. journal = {International Journal of Industrial and Manufacturing Engineering}, [online]. World Academy of Science, Engineering and Technology. March 2008, vol. 15(3). 174 - 179 [viewed 19 September 2024]. Available from: https://publications.waset.org/pdf/7509.