An Algorithm of Finite Capacity Material Requirement Planning System for Multi-stage Assembly Flow Shop
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32795
An Algorithm of Finite Capacity Material Requirement Planning System for Multi-stage Assembly Flow Shop

Authors: T. Wuttipornpun, U. Wangrakdiskul, W. Songserm

Abstract:

This paper aims to develop an algorithm of finite capacity material requirement planning (FCMRP) system for a multistage assembly flow shop. The developed FCMRP system has two main stages. The first stage is to allocate operations to the first and second priority work centers and also determine the sequence of the operations on each work center. The second stage is to determine the optimal start time of each operation by using a linear programming model. Real data from a factory is used to analyze and evaluate the effectiveness of the proposed FCMRP system and also to guarantee a practical solution to the user. There are five performance measures, namely, the total tardiness, the number of tardy orders, the total earliness, the number of early orders, and the average flow-time. The proposed FCMRP system offers an adjustable solution which is a compromised solution among the conflicting performance measures. The user can adjust the weight of each performance measure to obtain the desired performance. The result shows that the combination of FCMRP NP3 and EDD outperforms other combinations in term of overall performance index. The calculation time for the proposed FCMRP system is about 10 minutes which is practical for the planners of the factory.

Keywords: Material requirement planning, Finite capacity, Linear programming, Permutation, Application in industry.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1332838

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2251

References:


[1] Nagendra, P.B. and Das, S.K., "Finite Capacity Scheduling Method for MRP with Lot Size restrictions." Int. J. Prod. Res, 2001, 39, pp. 1603- 1623.
[2] McCarthy, S.W. and Barber, K.D., "Medium to short term finite capacity scheduling: a planning methodology for capacity constrained work -shop". Eng. Cost & Prod. Econ, 1990, 19, pp. 189-199.
[3] White, C. and Hastings, N.A.J., "Scheduling techniques for medium scale industry." Austral. Soc. Oper. Res, 1983, 3, pp. 1-4.
[4] Taal, M. and Wortmann, J.C., "Integrating MRP and finite capacity planning". Prod. Plan. & Cont, 1997, 8(3), pp. 245-254.
[5] Bakke, N.A. and Hellberg, R., "The challenges of capacity planning". Int. J. Prod. Econ, 1993, 30/31, pp. 243-264.
[6] Pandey, P. C., Yenradee, P., and Archariyapruek, S.,"A finite capacity material requirement planning system". Prod. Plan. & Cont, 2000, 11(2), pp. 113-121.
[7] Wuttipornpun, T. and Yenradee, P., "Development of Finite Capacity Material Requirement Planning System for Assembly Operations". Prod. Plan. & Cont, 2004, 15, pp. 534-549.
[8] Wuttipornpun, T., Yenradee, P., Buellens, P., and Oudheusden, D.L., "A Finite Capacity Material Requirement Planning System for a Multi- Stage Assembly Factory: Goal Programming Approach". Indust. Eng. & Manage. Sys, 2005, 4(1), pp. 23-35.
[9] Wuttipornpun, T., Yenradee, P., Buellens, P., and Oudheusden, D.L., "Finite Capacity Material Requirement Planning System for a Multistage Automotive-Part Assembly Factory". Sci. Asia, 2006, 32, pp. 303- 313.
[10] Wuttipornpun, T. and Yenradee, P., "Performance of TOC based finite capacity material requirement planning system for a multi-stage assembly factory". Prod. Plan. & Cont, 2007, 18, pp. 703-715.
[11] Ozdamar, L. and Bozyel, M.A., "The capacitated lot sizing problem with overtime decisions and setup times". Int. Indust. Eng. Trans, 2000, 32, pp. 1043-1057.
[12] Rajagopalan, S. and Swaminathan, J.M., "A Coordinated Production Planning Model with Capacity Expansion and Inventory" Management. Manage. Sci, 2001, 47(11), pp. 1562-1580.
[13] Ornek, A.M. and CENGIZ, O., "Capacitated lot sizing with alternative routings and overtime decisions". Int. J. Prod. Res, 2006, 44(24), pp. 5363-5389.
[14] Rong, C., Takahashi, K., and Morikawa, K., "MRP rescheduling heuristics with capacity extension under deterministic demand". Comp. & Indust. Eng, 2006, pp. 51, 2-13.
[15] Haddock, J. and Hubicki, DE.,"Which lot-sizing techniques are used in material requirement planning?" Prod. & Invent. Manage. J, 1989, 30(3), pp.53-56.