Fattahi, P. (2009), 'A Hybrid Multi Objective Algorithm for Flexible Job Shop Scheduling', World Academy of Science, Engineering and Technology, Open Science Index 26, International Journal of Industrial and Manufacturing Engineering, 3(2), 178 - 183.