Reliability-based Selection of Wind Turbines for Large-Scale Wind Farms
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32804
Reliability-based Selection of Wind Turbines for Large-Scale Wind Farms

Authors: M. Fotuhi-Firuzabad, A. Salehi Dobakhshari

Abstract:

This paper presents a reliability-based approach to select appropriate wind turbine types for a wind farm considering site-specific wind speed patterns. An actual wind farm in the northern region of Iran with the wind speed registration of one year is studied in this paper. An analytic approach based on total probability theorem is utilized in this paper to model the probabilistic behavior of both turbines- availability and wind speed. Well-known probabilistic reliability indices such as loss of load expectation (LOLE), expected energy not supplied (EENS) and incremental peak load carrying capability (IPLCC) for wind power integration in the Roy Billinton Test System (RBTS) are examined. The most appropriate turbine type achieving the highest reliability level is chosen for the studied wind farm.

Keywords: Wind Turbine Generator, Wind Farm, Power System Reliability, Wind Turbine Type Selection

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1060199

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1734

References:


[1] T. Ackermann, Wind Power in Power Systems, 1st ed. New York: John Wiley and Sons, 2005.
[2] S. Kennedy, "Wind power planning: Assessing long term costs and benefits," Energy Policy, vol. 33, pp. 1661-1675, 2005.
[3] Z. M. Salameh and I. Safari, "Optimum windmill -site matching," IEEE Trans. Energy Convers., vol. 4, no. 7, pp. 669-675, 1992.
[4] H. Chen, R. Billinton, "Determination of the optimum site-matching wind turbine using risk-based capacity benefit factors," IEE Proc-Gener. Transm. Distrib., vol. 146, no. 1, pp. 96-100, Jan. 1999.
[5] R Billinton and R Allan, Reliability Evaluation of Power Systems, 2nd ed. New York: Plenum, 1996.
[6] F. C. Sayas, and R. N. Allan, "Generation availability assessment of wind farms," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 143, no. 5, pp. 507-518, Sep. 1996.
[7] A. P. Leite, C. L. T. Borges, D. M. Falcão, "Probabilistic wind farms generation model for reliability studies applied to Brazilian sites," IEEE Trans. Power Syst., vol. 21, no. 4, pp. 1493-1501, Nov. 2006.
[8] R. Billinton and Y. Gao, "Multistate wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy," IEEE Trans. Energy Convers., vol. 23, no. 1, pp. 163-170, Mar. 2008.
[9] P. Giorsetto and F. K. Utsurogi, "Development of a new procedure for reliability modeling of wind turbine generators", IEEE Trans. Power App. Syst., vol. 102, no. 1, pp. 134-143, Jan. 1983.
[10] Online Available: http://www.vestas.com.
[11] Online Available: http://www.gewindenergy.com/
[12] Iranian Renewable Energy Organization Archives, Tehran, Iran.
[13] R. Billinton, H. Chen, and R. Ghajar, "Time-series models for reliability evaluation of power systems including wind energy," Microelectron. Rel., vol. 36, no. 9, pp. 1253-1261, 1996.
[14] R. Billinton, S. Kumar, N. Chowdhury, K. Debnath, L. Goel, E. Khan, P. Kos, G. Nourbakhsh, and J. Oteng-Adjei, "A reliability test system for educational purposes basic data," IEEE Trans. Power Syst., vol. 4, no. 4, pp. 1238-1244, Aug. 1989.