WASET
Tadayon, B. , Salmasi, N. (2012), 'A Flexible Flowshop Scheduling Problem with Machine Eligibility Constraint and Two Criteria Objective Function', World Academy of Science, Engineering and Technology, Open Science Index 62, International Journal of Industrial and Manufacturing Engineering, 6(2), 388 - 393.