	%T Integrating Process Planning and Scheduling for Prismatic Parts Regard to Due Date
	%U https://publications.waset.org/pdf/3495
	%V 27
	%X Integration of process planning and scheduling
functions is necessary to achieve superior overall system
performance. This paper proposes a methodology for integration of
process planning and scheduling for prismatic component that can be
implemented in a company with existing departments. The developed
model considers technological constraints whereas available time for
machining in shop floor is the limiting factor to produce multiple
process plan (MPP). It takes advantage of MPP while guarantied the
fulfillment of the due dates via using overtime. This study has been
proposed to determinate machining parameters, tools, machine and
amount of over time within the minimum cost objective while
overtime is considered for this. At last the illustration shows that the
system performance is improved by as measured by cost and
compatible with due date.
	%P 248 - 251