Study on Applying Fuzzy AHP and GRA in Selection of Agent Construction Enterprise
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32804
Study on Applying Fuzzy AHP and GRA in Selection of Agent Construction Enterprise

Authors: Shirong Li, Huan Yan

Abstract:

To help the client to select a competent agent construction enterprise (ACE), this study aims to investigate the selection standards by using the Fuzzy Analytic Hierarchy Process (FAHP) and build an evaluation mathematical model with Grey Relational Analysis (GRA). According to the outputs of literature review, four orderly levels are established within the model, taking the consideration of various agent construction models in practice. Then, the process of applying FAHP and GRA is discussed in detailed. Finally, through a case study, this paper illustrates how to apply these methods in getting the weights of each standard and the final assessment result.

Keywords: agent construction enterprise, agent constructionmodel, fuzzy analytic hierarchy process, grey relational analysis

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1327490

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1999

References:


[1] L. Sun, "Study on the Performance Assessment of the Agent Construction Enterprise for the Non-profit Project Invested by Government," Economic Research Guide, vol. 21, pp. 177-179, 2009.
[2] L. Yan, Y.-L. Yin, and D.-J. Fan, "A Conceptual Model for Public Project Governance" (in Chinese), China Soft Science Magazine, vol. 6, pp. 130-135, 2004.
[3] H. Ke, Study on Management Performance Improvement of Public Project Based on Agent Construction Model, Tianjin Polytechnic University, 2007.
[4] J.-J. Deng, "Study on Motivation System of Agent Construction Enterprise for Project Invested by government," Tianjin Polytechnic University, 2007.
[5] L. Yan, R. Xing, and G.-D. Zhou, "On the Selection Method of Construction Agent Organization on the Basis of Project Governance Theory," Journal of Beijing Institute of Technology (Social Science Edition), vol. 11, pp. 31-37, Dec. 2009.
[6] G.-P. Xu, G.-D. Zhou, and Y.-N. Wu, "Study on Agent Construction Organization Performance Evaluation System of the Project Invested by Government," Construction Economy, vol. 284, pp. 21-24, Jun. 2006.
[7] Q.-M. Luo, and Y.-H. Liao, "Performance Assessment of Agent Construction Enterprise for Project Invested by Government," Science and Technology Information, vol. 4, pp. 242, 2008.
[8] H. Xie, "Post-assessment on the Implementation of Agent Construction System for Project Invested by Government," China Collective Economic, pp. 55-56, Jun. 2010.
[9] Y.-T. Zhang, "The Selection of Agent Construction Enterprise Based on AHP," China Collective Economic, vol. 3, pp. 80-81, Jan. 2010.
[10] H.-L. Yin, G.-Z. Cao and Q.-S. Liang, "The Selection of Agent Construction Enterprise Based on AHP," The Collected Papers of the Third Yellow River International Forum, pp: 198-202. 2010.
[11] J. Huang, and L. Shen, "Study on the Selection of Agent Construction Enterprise Based on Fussy Mathematics and Layered Grey Relational Analysis," Mathematic in Practice and Theory, vol. 38, pp. 28-35, Nov. 2007.
[12] X.-B. Huang, Q. Huang, and Y.-D. Huang, "Evaluation Method of Construction Agent System Based on DEA," Journal of Chongqing Jiaotong University, vol. 28, pp. 751-767, Aug. 2009.
[13] B. Zhao, S.-L. Zhang, and Y.-J. Q, "Performance Assessment of Agent Construction Enterprise for Project Invested by Government Based on AFD," Journal of Chongqing University, vol. 30, pp. 139-143, Nov. 2007.
[14] L. Yan, L.-X. Jia, and R. Xing, "Study on Reputation Effects of Agent Construction Enterprise in Incomplete Competition." Research on Financial and Economic Issues, vol. 9, pp. 58-63, Sep. 2010.
[15] B.-Y. Pan, and Y.-B. Xu, "The Design of the Agent Construction Project Management Mode, " in Conf. Rec. 2009 IEEE Int. Conf. Management and Service Science, pp. 1 - 4.
[16] Y.-L. Yin, and X.-Y. Yan, "Theory and Practice of Agent Construction in Public Project," Tianjjn University Press, 2005, pp. 153-162.
[17] J.-J. Zhang, "Fuzzy Analytical Hierarchy Process," Fuzzy System and Mathematics, vol. 14, pp. 80-88, Jun. 2000.
[18] Y.-L. Yin, and X.-Y. Yan, "Theory and Practice of Agent Construction in Public Project," Tianjjn University Press, 2005, pp. 153-162.
[19] L. A. Zadeh, "Fuzzy Sets," Inf. Control., 1965, pp. 338-353.
[20] K. J. Schmucker, "Fuzzy Sets, Natural Language Computation, and Risk Analysis," Computer Science Press, New York, 1984.
[21] G. J. Klir, and T. A. Folger, "Fuzzy Sets, Uncertainty and Information," Prentice-Hall, Englewood Cliffs, N. J., 1988.
[22] A. Kaufmann, and M. M. Gupta, "Introduction to Fuzzy Arithmetic Theory and Application," Van Nostrand Reinhold, New York, 1991.