M. Heydari and S. A. Torabi, The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups. journal = {International Journal of Industrial and Manufacturing Engineering}, [online]. World Academy of Science, Engineering and Technology. November 2008, vol. 23(11). 1278 - 1285 [viewed 26 April 2024]. Available from: https://publications.waset.org/pdf/14466.