WASET
	%0 Journal Article
	%A M. Heydari and  S. A. Torabi
	%D 2008
	%J International Journal of Industrial and Manufacturing Engineering
	%B World Academy of Science, Engineering and Technology
	%I Open Science Index 23, 2008
	%T The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups
	%U https://publications.waset.org/pdf/14466
	%V 23
	%X The problem of lot sizing, sequencing and scheduling
multiple products in flow line production systems has been studied
by several authors. Almost all of the researches in this area assumed
that setup times and costs are sequence –independent even though
sequence dependent setups are common in practice. In this paper we
present a new mixed integer non linear program (MINLP) and a
heuristic method to solve the problem in sequence dependent case.
Furthermore, a genetic algorithm has been developed which applies
this constructive heuristic to generate initial population. These two
proposed solution methods are compared on randomly generated
problems. Computational results show a clear superiority of our
proposed GA for majority of the test problems.
	%P 1278 - 1285