WASET
	@article{(Open Science Index):https://publications.waset.org/pdf/14292,
	  title     = {Contractor Selection in Saudi Arabia},
	  author    = {M. A. Bajaber and  M. A. Taha},
	  country	= {},
	  institution	= {},
	  abstract     = {Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few number of researches. The selection strategy is not perfect and considered as the reason behind irresponsible contractors. As a response, this research was conducted to review the contractor selection strategies as an integral part of a long advanced research to develop a good selection model. Many techniques can be used to form a selection strategy; multi criteria for optimizing decision, prequalification to discover contractor-s responsibility, bidding process for competition, third party guarantee to enhance the selection, and fuzzy techniques for ambiguities and incomplete information.
},
	    journal   = {International Journal of Economics and Management Engineering},
	  volume    = {6},
	  number    = {11},
	  year      = {2012},
	  pages     = {2995 - 3000},
	  ee        = {https://publications.waset.org/pdf/14292},
	  url   	= {https://publications.waset.org/vol/71},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 71, 2012},
	}