WASET
    Seyed Habib A. Rahmati,  Proposing a Pareto-based Multi-Objective Evolutionary Algorithm to Flexible Job Shop Scheduling Problem.   journal   = {International Journal of Industrial and Manufacturing Engineering}, [online]. World Academy of Science, Engineering and Technology.
    January 2012, vol. 61(1). 316 - 321
    [viewed 27 April 2024]. Available from: https://publications.waset.org/pdf/13872.