WASET
Rahmati, S. (2012). 'Proposing a Pareto-based Multi-Objective Evolutionary Algorithm to Flexible Job Shop Scheduling Problem'. World Academy of Science, Engineering and Technology, Open Science Index 61, International Journal of Industrial and Manufacturing Engineering, 6(1), 316 - 321.