WASET
    Yu-Jen Chang and  Shih-Chieh Chen and  Yu-Wei Kuo,  A Search Algorithm for Solving the Economic Lot Scheduling Problem with Reworks under the Basic Period Approach.   journal   = {International Journal of Industrial and Manufacturing Engineering}, [online]. World Academy of Science, Engineering and Technology.
    June 2013, vol. 78(6). 1270 - 1274
    [viewed 26 April 2024]. Available from: https://publications.waset.org/pdf/12920.