WASET
	@article{(Open Science Index):https://publications.waset.org/pdf/128,
	  title     = {Project Selection by Using Fuzzy AHP and TOPSIS Technique},
	  author    = {S. Mahmoodzadeh and  J. Shahrabi and  M. Pariazar and  M. S. Zaeri},
	  country	= {},
	  institution	= {},
	  abstract     = {In this article, by using fuzzy AHP and TOPSIS
technique we propose a new method for project selection problem.
After reviewing four common methods of comparing alternatives
investment (net present value, rate of return, benefit cost analysis
and payback period) we use them as criteria in AHP tree. In this
methodology by utilizing improved Analytical Hierarchy Process
by Fuzzy set theory, first we try to calculate weight of each
criterion. Then by implementing TOPSIS algorithm, assessment of
projects has been done. Obtained results have been tested in a
numerical example.},
	    journal   = {International Journal of Industrial and Manufacturing Engineering},
	  volume    = {1},
	  number    = {6},
	  year      = {2007},
	  pages     = {270 - 275},
	  ee        = {https://publications.waset.org/pdf/128},
	  url   	= {https://publications.waset.org/vol/6},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 6, 2007},
	}