WASET
	@article{(Open Science Index):https://publications.waset.org/pdf/11369,
	  title     = {Investigation on the HRSG Installation at South Pars Gas Complex Phases 2&3},
	  author    = {R. Moradifar and  M. Masahebfard and  M. Zahir},
	  country	= {},
	  institution	= {},
	  abstract     = {In this article the investigation about installation heat
recovery steam generation (HRSG) on the exhaust of turbo generators of phases 2&3 at South Pars Gas Complex is presented.
The temperature of exhaust gas is approximately 665 degree centigrade, Installation of heat recovery boiler was simulated in
ThermoFlow 17.0.2 software, based on test operation data and the
equipments site operation conditions in Pars exclusive economical energy area, the affect of installation HRSG package on the available
gas turbine and its operation parameters, ambient temperature, the
exhaust temperatures steam flow rate were investigated. Base on the results recommended HRSG package should have the capacity for 98
ton per hour high pressure steam generation this refinery, by use of
exhaust of three gas turbines for each package in operation condition of each refinery at 30 degree centigrade. Besides saving energy this
project will be an Environment-Friendly project. The Payback Period
is estimated approximately 1.8 year, with considering Clean Development Mechanism.},
	    journal   = {International Journal of Mechanical and Mechatronics Engineering},
	  volume    = {6},
	  number    = {11},
	  year      = {2012},
	  pages     = {2587 - 2592},
	  ee        = {https://publications.waset.org/pdf/11369},
	  url   	= {https://publications.waset.org/vol/71},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 71, 2012},
	}