Schedule Management of an Enterprise Receiving Orders Considering Dependency between Unit Tasks of a Collaborative Project

Authors: Joseph Oh, Bo-Hyun Kim, Jae-Yong Baek

Abstract:

This study suggests how an order-receiving company can avoid disclosing schedule information on unit tasks to the order-placing company when carrying out a collaborative project on the value chain in an order-oriented industry. Specifically, it suggests methods for keeping schedule information confidential, and categorizes potential situations by inter-task dependency. Lastly, an approach to select the most optimal non-disclosure method is discussed. With the methods for not disclosing work-related information suggested in the study, order-receiving companies can logically deal with political issues relating to the question of whether or not to disclose information upon the execution of a collaborative project in cooperation with an order-placing firm. Moreover, order-placing companies can monitor undistorted information, while respecting the legitimate rights of an order-receiving company. Therefore, it is fair to say that the suggestions made in this study will contribute to the smooth operation of collaborative intercompany projects.

Keywords: collaborative project, dependency, schedule management, unit task.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1329645

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1441

References:


[1] Cheng, J., Gruninger, M., Sriram, R., and Law, K. "Process Specification Language for project scheduling information exchange," International Journal of IT in Architecture, Engineering and Construction, Vol. 1, pp. 307-328, 2003.
[2] PMI, A Guide to the Project Management Body of Knowledge, the 3rd ed., Project Management Institue, Inc, PA, 2004.
[3] Meredith, J. R., and S. J. Mantel, Project Management: A Managerial Approach, 7th ed., John Wiley & Sons, NY, 2009.
[4] Kerzner, H., Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 9th ed., John Wiley & Sons, NJ, 2006.
[5] Chu, S., and B. Cesnik, "Improving Clinical Pathway Design: Lessons Learned From a Computerised Prototype ," International Journal of Medical Informatics, Vol. 51, No. 1, pp. 1-11, 1998.
[6] Earl T. Glenwright Jr., Let-s Scrap the Precedence Diagramming Method, 2004 AACE International Transactions, 2004.
[7] Lu, M., and H. Li, "Resource-Activity Critical-Path Method for Construction Planning," Journal of Construction Engineering and Management, Vol. 129, No. 4, pp. 412-420, 2003.
[8] Galloway, P. D., "Comparative Study of University Courses on Critical-Path Method Scheduling," Journal of Construction Engineering and Management, Vol. 132, No. 7, pp. 712-722, 2006.