	  title     = {Selection of Photovoltaic Solar Power Plant Investment Projects - An ANP Approach},
	  author    = {P. Aragonés-Beltrán and  F. Chaparro-González and  J. P. Pastor Ferrando and  M. García-Melón},
	  country	= {},
	  institution	= {},
	  abstract     = {In this paper the Analytic Network Process (ANP) is
applied to the selection of photovoltaic (PV) solar power projects.
These projects follow a long management and execution process
from plant site selection to plant start-up. As a consequence, there are
many risks of time delays and even of project stoppage.
In the case study presented in this paper a top manager of an
important Spanish company that operates in the power market has to
decide on the best PV project (from four alternative projects) to
invest based on risk minimization. The manager identified 50 project
execution delay and/or stoppage risks.
The influences among elements of the network (groups of risks
and alternatives) were identified and analyzed using the ANP
multicriteria decision analysis method. After analyzing the results the
main conclusion is that the network model can manage all the
information of the real-world problem and thus it is a decision
analysis model recommended by the authors. The strengths and
weaknesses ANP as a multicriteria decision analysis tool are also
described in the paper.},
	    journal   = {International Journal of Energy and Power Engineering},
	  volume    = {2},
	  number    = {8},
	  year      = {2008},
	  pages     = {128 - 136},
	  ee        = {https://publications.waset.org/pdf/10188},
	  url   	= {https://publications.waset.org/vol/20},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 20, 2008},
	}