Abstract:

The dismantling of disused industrial facilities such as nuclear power plants or refineries is an enormous challenge for the planning and control of the logistic processes. Existing control models do not meet the requirements for a proper dismantling of industrial plants. Therefore, the paper presents an approach for the control of dismantling and post-processing processes (e.g. decontamination) in plant decommissioning. In contrast to existing approaches, the dismantling sequence and depth are selected depending on the capacity utilization of required post-processing processes by also considering individual characteristics of respective dismantling tasks (e.g. decontamination success rate, uncertainties regarding the process times). The results can be used in the dismantling of industrial plants (e.g. nuclear power plants) to reduce dismantling time and costs by avoiding bottlenecks such as capacity constraints.

Keywords: Dismantling management, logistics planning and control models, nuclear power plant dismantling, reverse logistics.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1339750

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1403

References:


[1] Pawellek, G.: Produktionslogistik: Planung- Steuerung- Controlling. Darstellung von Materialflussarten bei der Demontage. Carl Hanser Verlag, Munich 2007.
[2] Deutsche Atomforum e.V.: Stilllegung und Rückbau von Kernkraftwerken. Deutsches Atomforum e.V., Berlin 2013.
[3] E. ON Kernkraft GmbH: Vom Kernkraftwerk zur „Grünen Wiese “– Stilllegung des Kernkraftwerks Würgassen. 3rd ed., Gutenberg beuys GmbH, Hanover 2008.
[4] Nyhuis, P.; Wiendahl, H.-P.: Logistische Kennlinien. Grundlagen, Werkzeuge und Anwendungen. Springer Verlag, Berlin u. a. 1999.
[5] Schultmann, F.: Stoffstrombasiertes Produktionsmanagement. Erich Schmidt Verlag, Berlin 2003.
[6] Bartels, J. H.: Anwendung von Methoden der ressourcenbeschränkten Projektplanung mit multiplen Ausführungsmodi in der betriebswirtschaftlichen Praxis. Dissertation TU Clausthal, Gabler Verlag, Wiesbaden 2009.
[7] Yanagihara, S.; Sukegawa, T.; Shiraishi, T.: Development of Computer Systems for Planning and Management of Reactor Decommissioning. In: Journal of Nuclear Science and Technology, vol. 38 (2001), no. 3, pp. 193–202.
[8] Iguchi, Y. et al.: Development of Decommissioning Engineering Support System (DEXUS) of the Fugen Nuclear Power Station. In: Journal of Nuclear Science and Technology, vol. 41 (2004), no. 3, pp. 367–375.
[9] Zeiher, M.: Ein Entscheidungsunterstützungsmodell für den Rückbau massiver Betonstrukturen in kerntechnischen Anlagen. Dissertation Universität Fridericiana zu Karlsruhe (TH), 2009.
[10] Spengler, T.: Planungsmodell zur deckungsbeitragsmaximalen Demontage und Verwertung komplexer Verbundprodukte. Dissertation Universität Karlsruhe, 1994.
[11] Seemann, A.: Entwicklung integrierter Rückbau- und Recyclingkonzepte für Gebäude: ein Ansatz zur Kopplung von Demontage, Sortierung und Aufbereitung. Shaker Verlag, Aachen 2003.
[12] Ying Tang, Meng Chu Zhou, Caudill, R.J.: An integrated approach to disassembly planning and demanufacturing operation. In: IEEE Transactions on Robotics and Automation, vol. 17 (2001), no. 6, pp. 773-784.
[13] Chiotellis, A.; Kim, H.-J.; Seliger, G.: Dynamic Process Planning Control of Hybrid Disassembly Systems. In: Advances in Life Cycle Engineering for Sustainable Manufacturing Businesses. Proceedings of the 14th CIRP Conference on Life Cycle Engineering, Waseda University, Tokyo, Japan, June 11th–13th, 2007, pp. 251-256.
[14] Zülch, G; Hrdina, J.; Schwarz, R.: Development of a Computer Aided Procedure to Control Division of Labour Based Disassembly Systems. In: Manufacturing Systems and Technologies for the New Frontier. The 41st CIRP Conference on Manufacturing Systems May 26–28, 2008, Tokyo, Japan, pp. 217-220.
[15] Zülch, G., J.; Schwarz, R: Planning and Balancing of Disassembly Systems. In: Lean Business Systems and Beyond Volume 257 of the series IFIP – The International Federation for Information Processing, pp. 49-56.
[16] Landau, K.: Demontageplanung an einem Beispiel aus der Elektronikindustrie. In Zülch, G.; Schwarz, R.: Demontagesystemplanung an einem Beispiel aus der Elektroindustrie, GRIN Verlag, Munich 2003.
[17] Schultmann, F; Sunke N.: Planning models for the dismantling of electrical and electronic equipment under consideration of uncertainties. In: Progress in Industrial Ecology, an International Journal, vol. 5 (2008), no. 1, pp. 82 - 101.
[18] Huber, A.: Demontageplanung und -steuerung. Planung und Steuerung industrieller Demontageprozesse mit PPS-Systemen. Shaker Verlag, Aachen 2001.
[19] Wesebaum, S.; Klewer, M.; Ullmann, G.: Einflussfaktoren auf Belastungsstreuungen. In: ZWF – Zeitschrift für wirtschaftlichen Fabrikbetrieb, Carl Hanser Verlag, vol. 109 (2014), no. 10, pp. 726-730.
[20] Lödding, H.: Verfahren der Fertigungssteuerung. 2. ed., Springer Verlag, Berlin 2008.
[21] Jendralski, J.: Kapazitätsterminierung zur Bestandregelung in der Werkstattfertigung. Dissertation, TU Hannover, 1978.
[22] Bertrand, J. W. M.; Wortmann, J. C.: Production control and information systems for component-manufacturing shops. Elsevier, New York 1981.