Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32794
Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion

Authors: Mamoon Mousa Atout

Abstract:

Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.

Keywords: Construction Methodology, Design Process, Project Managers, Scheduling and Resource Planning.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1339173

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2018

References:


[1] Assaf, S.A. and Mohammed A.H. “Causes of Delay in Large Building Construction Project” Journal of Construction Engineering & Management Vol. 2, Issue No.11, Page 45-62 1995
[2] Harrington, J., & Voehl, F. (2012). Applying TQM to the construction Industry. The TQM Journal, 24(4), 352-362.
[3] Bramble, B.B. “Construction Delay Claims” Engineering and Project Management Vol. 132, No.07, Page 667-685, 1992
[4] Murali Sambasivan, Y.W.S., Causes and effects of delays in Malaysian construction industry, in International Journal of Project Management. 2007. P. 517-526
[5] Ajibade A. and Henry A. “Construction Delays and their Causative Factors in Nigeria” Journal of Construction Engineering and Project Management Vol. 132, No.07, Page 667-685, 2006
[6] Mansfield N.R.; Ugwuo O.O. & Doran T. “Causes of Delay & Cost Overruns in Nigerian Construction Projects” Journal of Construction Engineering & Management Vol. 13, No.04, Page 254-260. 1994
[7] Scott S., “Delay Claims in U.K. Contracts” Journal of Construction Engineering & Management Vol. 123, Issue 03,
[8] Hensey M.” Essential Tools of Total Quality Management” Journal of Construction Engineering & Management Vol. 9 Issue 4 Page 329-339. 199
[9] Hofstede G. “Impact of Culture” Hand Book School of Engineering & Technology University of Glamorgan, Glamorgan, U.K., 1991
[10] Semple C; Edwin H.; Ann T., “Contract Strategy for Design Management in the Design & Build System”, International Journal of Project Management, 23 (2005) 630-639 P. Published by E1 Sevier Ltd, U.K, 2005
[11] Anderson W. “Contract Procedure” University of Glamorgan School of Technology Published by Glamorgan, Wales, UK 1997
[12] Naief M., “A Comparative Evaluation of Construction and Manufacturing Material Management” International PhD Journal of project management Vol. 20, Page 263-267, 2002
[13] W. A. W. Maimun, Critical Factors In Project Success: A Study ff Public Sector Construction Projects In Malaysia, PhD Thesis, and University. Malaya, Kuala Lumpur, May 2010.
[14] E. Muneera, A. Anuar, and A. S. Zulkiflee Preparing Project Managers to Achieve Project World Academy of Science, Engineering and Technology Vol:7 2013-02-20 Success International Scholarly and Scientific Research & Innovation 7(2) 2013 P. 294-299
[15] Tumi, S.A.H., H. Omran, and A.H.K. Pakir, Cause Of Delay In Construction Industry In Libya, in The International Conference on Administration and Business. 2009: University of Bucharest, Romania
[16] S. Kivrak, G. Arslan, I. Dikmen and M. Birgonul, “Capturing Knowledge in Construction Projects: Knowledge Platform for Contractors,” Journal of Management in Engineering, vol. 24, no. 2, pp. 87-95, 2008
[17] H.T.Ong, “Effective Project Management - Essential Elements for Successful Projects”, in 2007 Proc. Of The Inaugural Construction Conference, Singapore.