Achim Kampker and Christoph Deutskens and Heiner Hans Heimes and Mathias Ordung and Felix Optehostert, Cost Valuation Method for Development Concurrent Phase Appropriate Requirement Valuation Using the Example of Load Carrier Development in the Lithium-Ion-Battery Production. journal = {International Journal of Industrial and Manufacturing Engineering}, [online]. World Academy of Science, Engineering and Technology. November 2015, vol. 108(12). 2106 - 2111 [viewed 19 September 2024]. Available from: https://publications.waset.org/pdf/10003116.