	%T Cost Valuation Method for Development Concurrent Phase Appropriate Requirement Valuation Using the Example of Load Carrier Development in the Lithium-Ion-Battery Production
	%U https://publications.waset.org/pdf/10003116
	%V 108
	%X In the past years electric mobility became part of a
public discussion. The trend to fully electrified vehicles instead of
vehicles fueled with fossil energy has notably gained momentum.
Today nearly every big car manufacturer produces and sells fully
electrified vehicles, but electrified vehicles are still not as competitive
as conventional powered vehicles. As the traction battery states the
largest cost driver, lowering its price is a crucial objective. In
addition to improvements in product and production processes a nonnegligible,
but widely underestimated cost driver of production can
be found in logistics, since the production technology is not
continuous yet and neither are the logistics systems. This paper presents an approach to evaluate cost factors on
different designs of load carrier systems. Due to numerous
interdependencies, the combination of costs factors for a particular
scenario is not transparent. This is effecting actions for cost reduction
negatively, but still cost reduction is one of the major goals for
simultaneous engineering processes. Therefore a concurrent and
phase appropriate cost valuation method is necessary to serve cost
transparency. In this paper the four phases of this cost valuation
method are defined and explained, which based upon a new approach
integrating the logistics development process in to the integrated
product and process development.