WASET
	@article{(Open Science Index):https://publications.waset.org/pdf/10000309,
	  title     = {Optimization of Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Times Using Genetic Algorithm Approach},
	  author    = {Sanjay Kumar Parjapati and  Ajai Jain},
	  country	= {},
	  institution	= {},
	  abstract     = {This paper presents optimization of makespan for ‘n’
jobs and ‘m’ machines flexible job shop scheduling problem with
sequence dependent setup time using genetic algorithm (GA)
approach. A restart scheme has also been applied to prevent the
premature convergence. Two case studies are taken into
consideration. Results are obtained by considering crossover
probability (pc = 0.85) and mutation probability (pm = 0.15). Five
simulation runs for each case study are taken and minimum value
among them is taken as optimal makespan. Results indicate that
optimal makespan can be achieved with more than one sequence of
jobs in a production order.
},
	    journal   = {International Journal of Mechanical and Mechatronics Engineering},
	  volume    = {9},
	  number    = {1},
	  year      = {2015},
	  pages     = {42 - 47},
	  ee        = {https://publications.waset.org/pdf/10000309},
	  url   	= {https://publications.waset.org/vol/97},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 97, 2015},
	}